Overview of ESRF-EBS 352 MHz RF System Upgrade at 26th ESL RF Meeting
The 26th ESL RF Meeting held at Elettra in Trieste discussed the status and upgrades of the ESRF-EBS 352 MHz RF system. The meeting covered topics such as the EBS RF layout, HOM damped cavities, RF ECO-Mode, ongoing RF projects, and the replacement of klystrons with SSAs for a 4th harmonic RF system
0 views • 16 slides
Overview of ALICE Data Acquisition System Upgrade for LHC Run 3
ALICE is undergoing significant upgrades for LHC Run 3, including the implementation of the O2/FLP system. This upgrade will enhance data acquisition, processing, and storage capabilities. Key elements include new computing systems, software, and portfolio enhancements. The project overview outlines
1 views • 23 slides
GEM$ Competitive Funding Applications - Grant Opportunity Overview
Exploring the Grants for Education Management System (GEM$) competitive funding applications for the upcoming cycle. Learn about the grant funding opportunity postings, GEM$ grant workflow, due dates, application process, and more. Gain insights on navigating the competitive grant landscape and maxi
0 views • 29 slides
Grants Education Management System (GEM$) Training Module: General Site Navigation
This training module provides an overview of the Grants Education Management System (GEM$) used by the Department of Elementary & Secondary Education (DESE) for funding applications in Massachusetts. It covers user roles, grant types (entitlement vs. competitive), grant scenarios, user access, and r
0 views • 105 slides
Exploring Fission Near 198Pb with AT-TPC at FRIB: Insights from Curtis Hunt
Delve into the intriguing world of fission studies near 198Pb using the AT-TPC at FRIB. Supported by the DOE Office of Science, this research probes nuclear structure, fission properties, and fusion-fission reactions. By employing innovative techniques like the Heavy Isotope Tagger and active target
1 views • 39 slides
DPM Reforms Workshop 2023: Rise Up, Step Up, Speak Up for Payroll Upgrade
The Department of Personnel Management is embarking on a reform journey with the Rise Up, Step Up, Speak Up workshop in 2023 to upgrade their payroll system from the outdated Version 12 to higher versions with new features. Deloitte's findings highlighted the need for system upgrades, improved HR po
1 views • 18 slides
Managing Multi-Year Grants in EdGrants and Transition to GEM$ System
Learn how to effectively maintain multi-year grants originating in EdGrants, and smoothly transition to the new GEM$ system. Understand the process of managing grant activities, making payments, submitting final reports, and ensuring a seamless transition between the two systems.
6 views • 16 slides
Advanced Technology in Dark Matter Research
Cutting-edge technologies such as multi-source TPB evaporation, LAr TPC, and DarkSide-20k TPC are being utilized in the study of dark matter. These technologies aim to enhance detection sensitivity and uniformity in film coatings, crucial for advancing our understanding of mysterious dark matter par
1 views • 20 slides
Advanced Cryomodule Technology for China's Spallation Neutron Source Upgrade
This article discusses the development of a Double-Spoke Cavity Cryomodule for the China Spallation Neutron Source (CSNS) project. It covers the structure of the cryomodule, integration processes, future work, and details about the CSNS beam parameters and upgrade scheme. The content includes images
0 views • 19 slides
Earth-GRAM Overview and Updates 2023
Earth-GRAM is a global reference atmospheric model providing monthly mean and standard deviation data for various atmospheric variables. It is used in engineering for dispersion simulations but is not a forecasting model. Updates to Earth-GRAM include the Modern Era Retrospective Analysis, a global
0 views • 19 slides
ERCOT Passport Program Update and EMS/RTC Bifurcation Summary
ERCOT's Passport Program Update includes details on the Scope and Delivery for 2020-2024, the bifurcation of EMS Upgrade and RTC, and the reason for the separation of EMS/Passport. The program objectives, challenges faced in the EMS upgrade schedule, and the decision to separate the EMS Upgrade from
0 views • 13 slides
FSM Performance Issue Troubleshooting Flow Guide
Troubleshoot performance issues in FSM by following a detailed flow guide. Start by checking for performance degradation post-upgrade, verify upgrade source, review upgrade procedure adherence, investigate mobile-specific issues, analyze server processes, and take necessary actions to resolve perfor
1 views • 25 slides
TPC Mechanical Support Considerations for ILD Integration Task Force Meeting
During the ILD Integration Task Force meeting, discussions revolved around the deformation of the TPC under weight and pressure, fixation points for hanging the TPC, considerations for supporting the TPC with the Cryostat or HCAL, and dealing with potential service clashes. Challenges and preference
0 views • 5 slides
Gem and Jewellery Trade Update: Key Highlights April-November 2022
GJEPC's latest update reveals a 1.80% increase in gem and jewellery exports to US$26.47 billion from April to November 2022 compared to the same period in 2021. The report also highlights positive growth in exports of polished lab-grown diamonds, coloured gemstones, and various jewellery types, with
0 views • 17 slides
Production in Collisions at 8-16 TeV: Analysis Overview
Detailed analysis overview of the production in collisions at 8-16 TeV incorporating contributions from Pavel Larionov (ITSsa), Paula Matuoka (TPC), Silvia Pisano (TPC), and Marco Toppi (TOF). The analysis involves the comparison of spectra data to previous datasets, emphasizing the importance of un
0 views • 50 slides
Exploring Heavy-Ion Collisions at CERN LHC: ALICE Experiment Overview
Unveiling insights into heavy-ion collisions at CERN's Large Hadron Collider (LHC) through the ALICE experiment. Delving into the status, performance, and initial results, ALICE aims to characterize the medium formed during collisions. With a collaboration of around 1000 members from 31 countries an
0 views • 29 slides
One of the Best service for Switchboard Upgrade in Melton
Balzan Electrical Pty Ltd provides the Best service for Switchboard Upgrade in Melton. They specialize in downlighting, switchboard upgrades, smoke alarms, fault finding, power points, ceiling fans, and more. They also offer an emergency electrician
0 views • 6 slides
How to Upgrade Your SEO with Florida’s Top Company Vise Tech
\u2022\tWhen it comes to enhancing your online presence, Upgrade Your SEO with Vise Tech Florida\u2019s leading SEO company have the expertise to propel your business to the forefront of search engine results. Whether you\u2019re based in Miami, Coc
1 views • 1 slides
Digi Consult Gem registration consultant in India.
With the help of\u00a0Digi\u00a0Consult's\u00a0gem\u00a0listing\u00a0services, collectors\u00a0and\u00a0dealers\u00a0can\u00a0present\u00a0their\u00a0valuable\u00a0gems\u00a0to universal attention. Digi Consult offers qualified guidance on gem new re
2 views • 6 slides
Understanding Electroluminescence Time Projection Chamber (EL TPC) Physics
Delve into the fundamentals of Electroluminescence Time Projection Chambers (EL TPCs) through concepts like electron drift, scintillation mechanisms in noble gases, and charge yield estimation. Explore the workings of EL TPC prototypes, such as ZEPLIN II/III and DarkSide, for applications like react
0 views • 23 slides
Cutting-Edge TPC Simulation Techniques at Budker INP & NSU
Cutting-edge TPC simulation techniques implemented by researchers at Budker INP and NSU include framework implementations, event displays, background simulations, track distortions, and gas medium simulations. Researchers like Andrey Sokolov, Lev Shekhtman, Vijayanand KV, and Timofey Maltsev have co
0 views • 15 slides
InRoads SS4 Upgrade Overview
KYTC has been working on the InRoads SS4 upgrade, with recent testing of CADD standards. The agenda includes a history of the upgrade process, changes in the new software, and a live demo. Workspace management and version details are outlined, along with a new approach to InRoads data and MicroStati
0 views • 20 slides
Upgrade to Optimal Quality with the Best Purging Compound for Plastic Developed
The growing world of thermoplastics demands higher quality, better safety, better value, better processes that are possible with engineered purging products. For more info visit: \/\/unicleanplus.wordpress.com\/2024\/09\/05\/upgrade-to-optimal-qualit
1 views • 5 slides
LHCb RICH2 Upgrade Mechanics Status Update November 2016
Mechanics and design status update of LHCb RICH2 upgrade focusing on T-bar and cooling system construction, cable tray design, connections, cooling geometry optimization, prototypes testing, and assembly progress. Details include materials used, dimensions, heat exchange calculations, pressure drops
0 views • 9 slides
Upgrade Your Scalp Care with Menfirst’s Shampoo Brush
Upgrade your hair care routine with Menfirst\u2019s shampoo brush. This essential tool promotes a cleaner scalp, reduces dandruff, and improves blood circulation for healthier, shinier hair. Learn how to use it effectively and enjoy the benefits of a
1 views • 4 slides
Green Energy Money $aver (GEM$) Financing Programs in Hawaii
Green Energy Money $aver (GEM$) offers innovative financing programs for residential and commercial properties in Hawaii, allowing homeowners and renters to access energy improvements with no upfront costs and immediate bill savings. Participants need to meet eligibility criteria based on utility bi
0 views • 17 slides
LMS Upgrade Project Timeline & Blackout Schedule
The Learning Center is undergoing an LMS upgrade project with User Acceptance Testing, production environment preparation, and a detailed timeline leading to the go-live date in November. Key tasks include user training, system availability updates, role assignments, content creation, and post-produ
0 views • 7 slides
Digital Upgrade Plan for AV Systems
Planning for a comprehensive upgrade of AV systems due to outdated equipment, poor design, and the need for brighter teaching materials. The advantages of digital upgrades are highlighted, along with a list of rooms requiring upgrades, focused on HD video support and future-proofing. Scheduling stra
0 views • 9 slides
CLAS12 Trigger System Upgrade Plan May 6, 2020
CLAS12 Trigger System is undergoing an upgrade to enhance trigger efficiency, purity, and data rate reduction. The existing hardware and trigger overview provide insight into the current system's components and operation. The upgrade goals aim to maintain high trigger efficiency, reduce data rates,
0 views • 14 slides
Concept for ALICE Upgrade: Gating Grid by Howard Wieman
The Technical Design Report outlines a plan to use GEM detectors for the TPC readout in ALICE upgrade, addressing issues with positive ion back flow. A modified gating grid design is proposed to block 100% of the back flow while maintaining data rate. The concept involves specific parameters and ope
0 views • 14 slides
Understanding Matroids and Representative Sets in Game Theory
Explore the concept of matroids and representative sets in game theory, focusing on Alice vs. Bob scenarios where Alice aims to win by strategically selecting sets. Learn how Bollob's Lemma plays a key role in helping Alice reduce the number of sets she needs to remember to secure victory.
0 views • 44 slides
Guide to Completing FY24 Title I Data Collection Application in GEM$ May 2024
Learn how to navigate and complete the FY24 Title I Data Collection Application Supplement in GEM$ for Federal Grant Programs Office in May 2024. Understand the required steps, deadlines, and necessary data entry processes to ensure compliance with federal reporting requirements. Access detailed ins
0 views • 20 slides
Detailed Review of R-Alice PDS Data - Southwest Research Institute
Content discusses the R-Alice PDS data review conducted by Cesare Grava from Southwest Research Institute. It includes details on FUV imaging spectrograph specs, objectives of R-Alice, study goals related to comet nucleus, atomic budget analysis, and spectral mapping of 67P/CG nucleus at FUV wavelen
0 views • 14 slides
Muon Phase2 Upgrade: INFN Collaboration for Detector Enhancement
The Muon Phase 2 upgrade project aims to improve the performance of muon detectors for the HL-LHC conditions. Collaborating with INFN, the project focuses on maintaining excellent triggering and measurement capabilities under harsher conditions. Key aspects include existing detector consolidation, n
0 views • 17 slides
Gem Miracle Auto Pore Cleanser - Professional Quality Cleansing Tool
Gem Miracle Auto Pore Cleanser is a professional-quality auto cleansing tool designed for deep pore cleansing with upgraded brush and vibration features. It offers 8 benefits including massage effect, excess oil control, reduction of blackheads, cell stimulation, and smoother texture. The triangular
0 views • 4 slides
Advances in ILD Detector Design and TPC R&D
Explore the latest developments in ILD detector optimization and TPC research, focusing on enhancing event reconstruction accuracy and energy resolution. Learn about the ILD concept based on particle flow, the ILD group activities, organizational structure, technical advancements, and TPC readout te
0 views • 22 slides
Windows 10 Upgrade Guide
Windows 10 is a free upgrade until July 29, 2016, offering faster boot times, new features like Cortana, and improved security. However, upgrading may pose challenges such as compatibility issues with older hardware and software. This guide covers the installation process, benefits, pitfalls to watc
0 views • 36 slides
ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation
Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr
0 views • 10 slides
Update on ALICE ITS Upgrade Efforts at CERN
Kickoff meeting for the ALICE ITS Upgrade in LS3 was held at CERN on December 4, 2019. The efforts focus on silicon R&D for next-gen MAPS sensor with improvements, low X/X0 cylindrical vertex detection, and a new sensor design. Milestones, organization of efforts, and future plans towards an EIC sil
0 views • 6 slides
R&D and Simulations on Gain Stability and IBF for ALICE GEM-TPC Upgrade
The research and development efforts, along with simulations, focus on enhancing gain stability and addressing issues related to Ion Back Flow (IBF) for the ALICE GEM-TPC upgrade. Detailed outline, status updates, and major challenges are discussed, highlighting the significance of the upgrade for i
0 views • 24 slides