Sprint Network Upgrade Project at Fisher College

undefined
 
FISHER COLLEGE SPRINT UPGRADE
114-118 BEACON ST
 
BY AUTHORIZED AGENT FOR SPRINT JON RITTER OF TRM, INC.
16 CHESTNUT STREET, FOXBORO, MA 02035
 
SPRINT 2.5 EQUIPMENT PROJECT SUMMARY
 
Remove and Replace (3) Three Antennas (Paint to Match)
Attach (3) Three RRH’s (below parapet line)
Install (2) Two Conduits to run through existing cable trays with new lines to
service Antennas and RRHs
Photo simulations to follow of (3) Sectors (Alpha, Beta & Gamma) with the
proposed equipment
 
 
GOALS / APPROVALS
 
Building Permit was been issued on 1/11/2017
Landlord (Fisher College) consent on 1/5/2017
BBAC Approval - - In process
 
2.5 PROJECT BENEFITS TO THE BACK BAY
 
Network Capacity / Peak Load
Definition
The amount of traffic (activity) that a network can handle at one time
More Capacity means the network can handle more simultaneous users and/or faster speeds
Sprint 2.5 Capacity
200 Additional customers per sector, (3) sectors, total of 600 customer increase during
peak load.
 
CONCLUSION
 
Sprint’s upgrade will substantially increase capacity in the back bay area,
which is extremely critical during period of peak load/ maximum capacity
Sprint has and will continue to adhere to the design requirements of the BBAC
Sprint requests the 2.5 network upgrade be approved at Fisher College’s
existing telecom facility
 
THE END
 
Questions and comments welcome
Thank you!
 
Slide Note
Embed
Share

Fisher College Sprint network upgrade project aims to enhance network capacity in the Back Bay area by installing new equipment to accommodate additional customers during peak load times. The project involves antenna replacement, RRH installation, and conduit setup to optimize network performance. With necessary approvals in place, Sprint is committed to meeting BBAC design requirements for a successful upgrade.

  • Sprint
  • Network Upgrade
  • Fisher College
  • Back Bay
  • Peak Load

Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. FISHER COLLEGE SPRINT UPGRADE 114-118 BEACON ST BY AUTHORIZED AGENT FOR SPRINT JON RITTER OF TRM, INC. 16 CHESTNUT STREET, FOXBORO, MA 02035

  2. SPRINT 2.5 EQUIPMENT PROJECT SUMMARY Remove and Replace (3) Three Antennas (Paint to Match) Attach (3) Three RRH s (below parapet line) Install (2) Two Conduits to run through existing cable trays with new lines to service Antennas and RRHs Photo simulations to follow of (3) Sectors (Alpha, Beta & Gamma) with the proposed equipment

  3. GOALS / APPROVALS Building Permit was been issued on 1/11/2017 Landlord (Fisher College) consent on 1/5/2017 BBAC Approval - - In process

  4. 2.5 PROJECT BENEFITS TO THE BACK BAY Network Capacity / Peak Load Definition The amount of traffic (activity) that a network can handle at one time More Capacity means the network can handle more simultaneous users and/or faster speeds Sprint 2.5 Capacity 200 Additional customers per sector, (3) sectors, total of 600 customer increase during peak load.

  5. CONCLUSION Sprint s upgrade will substantially increase capacity in the back bay area, which is extremely critical during period of peak load/ maximum capacity Sprint has and will continue to adhere to the design requirements of the BBAC Sprint requests the 2.5 network upgrade be approved at Fisher College s existing telecom facility

  6. THE END Questions and comments welcome Thank you!