Sprint Network Upgrade Project at Fisher College

Slide Note
Embed
Share

Fisher College Sprint network upgrade project aims to enhance network capacity in the Back Bay area by installing new equipment to accommodate additional customers during peak load times. The project involves antenna replacement, RRH installation, and conduit setup to optimize network performance. With necessary approvals in place, Sprint is committed to meeting BBAC design requirements for a successful upgrade.


Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. FISHER COLLEGE SPRINT UPGRADE 114-118 BEACON ST BY AUTHORIZED AGENT FOR SPRINT JON RITTER OF TRM, INC. 16 CHESTNUT STREET, FOXBORO, MA 02035

  2. SPRINT 2.5 EQUIPMENT PROJECT SUMMARY Remove and Replace (3) Three Antennas (Paint to Match) Attach (3) Three RRH s (below parapet line) Install (2) Two Conduits to run through existing cable trays with new lines to service Antennas and RRHs Photo simulations to follow of (3) Sectors (Alpha, Beta & Gamma) with the proposed equipment

  3. GOALS / APPROVALS Building Permit was been issued on 1/11/2017 Landlord (Fisher College) consent on 1/5/2017 BBAC Approval - - In process

  4. 2.5 PROJECT BENEFITS TO THE BACK BAY Network Capacity / Peak Load Definition The amount of traffic (activity) that a network can handle at one time More Capacity means the network can handle more simultaneous users and/or faster speeds Sprint 2.5 Capacity 200 Additional customers per sector, (3) sectors, total of 600 customer increase during peak load.

  5. CONCLUSION Sprint s upgrade will substantially increase capacity in the back bay area, which is extremely critical during period of peak load/ maximum capacity Sprint has and will continue to adhere to the design requirements of the BBAC Sprint requests the 2.5 network upgrade be approved at Fisher College s existing telecom facility

  6. THE END Questions and comments welcome Thank you!

More Related Content