The HBWD Feedthroughs project involved contacting suppliers, receiving proposals, conducting simulations, and assessing offers for feedthrough specifications. Five suppliers were initially contacted, but only Kyocera and SST provided compliant offers. MDC's initial offer was non-compliant and is being reassessed. MWS simulations confirmed the validity of Kyocera's proposal and indicated that SST's design, while not optimal, was nearly compliant. The project culminated in ordering six units each from Kyocera and SST.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
HBWD Feedthroughs Eric Montesinos D bora Aguilera Sebastien Calvo HBWD Feedthroughs 1 9/12/2024
Contents Specifications Contacted suppliers Proposals MWS simulations Accepted offers Conclusions HBWD Feedthroughs 2 9/12/2024
Feedthrough specifications 7/16 DIN connector (preferred) 50 0 1 GHz 5 kW DN 40 CF flange Conical shape Final diameter 5 mm HBWD Feedthroughs 3 9/12/2024
Suppliers Five suppliers were contacted Kyocera SST MDC vacuum products Neyco SCT Offer was rejected by the companies due to an inability to reach the initial requirements HBWD Feedthroughs 4 9/12/2024
Kyocera proposal HBWD Feedthroughs 5 9/12/2024
SST proposal HBWD Feedthroughs 6 9/12/2024
MDC proposal HBWD Feedthroughs 7 9/12/2024
Accepted offers Offers from three suppliers Kyocera Compliant with required specifications Six units have been ordered SST Compliant with required specifications Six units have been ordered ~ MDC Initial offer non-compliant with required specifications Updated offer is being assessed HBWD Feedthroughs 8 9/12/2024
MWS simulations HBWD Feedthroughs 9 9/12/2024
Conclusions Kyocera MWS simulations confirm that the proposal is valid SST MWS simulations of an approximated model indicate that although not optimal, the design is almost compliant with the set requirements ~ MDC Updated offer is being assessed HBWD Feedthroughs 10 9/12/2024