Overview of ESRF-EBS 352 MHz RF System Upgrade at 26th ESL RF Meeting
The 26th ESL RF Meeting held at Elettra in Trieste discussed the status and upgrades of the ESRF-EBS 352 MHz RF system. The meeting covered topics such as the EBS RF layout, HOM damped cavities, RF ECO-Mode, ongoing RF projects, and the replacement of klystrons with SSAs for a 4th harmonic RF system
0 views • 16 slides
Cisco Systems Fault Managed Power Portfolio Overview
Cisco Systems offers an industry-leading Fault Managed Power (FMP) patent portfolio comprising 24 active assets across seven INPADOC families. The portfolio includes patents supporting fault-managed power systems, PoE deployments, DC power distribution, DC-DC conversion, and HVDC connectors. The FMP
4 views • 4 slides
Overview of ALICE Data Acquisition System Upgrade for LHC Run 3
ALICE is undergoing significant upgrades for LHC Run 3, including the implementation of the O2/FLP system. This upgrade will enhance data acquisition, processing, and storage capabilities. Key elements include new computing systems, software, and portfolio enhancements. The project overview outlines
1 views • 23 slides
DPM Reforms Workshop 2023: Rise Up, Step Up, Speak Up for Payroll Upgrade
The Department of Personnel Management is embarking on a reform journey with the Rise Up, Step Up, Speak Up workshop in 2023 to upgrade their payroll system from the outdated Version 12 to higher versions with new features. Deloitte's findings highlighted the need for system upgrades, improved HR po
1 views • 18 slides
Advanced Cryomodule Technology for China's Spallation Neutron Source Upgrade
This article discusses the development of a Double-Spoke Cavity Cryomodule for the China Spallation Neutron Source (CSNS) project. It covers the structure of the cryomodule, integration processes, future work, and details about the CSNS beam parameters and upgrade scheme. The content includes images
0 views • 19 slides
Earth-GRAM Overview and Updates 2023
Earth-GRAM is a global reference atmospheric model providing monthly mean and standard deviation data for various atmospheric variables. It is used in engineering for dispersion simulations but is not a forecasting model. Updates to Earth-GRAM include the Modern Era Retrospective Analysis, a global
0 views • 19 slides
ERCOT Passport Program Update and EMS/RTC Bifurcation Summary
ERCOT's Passport Program Update includes details on the Scope and Delivery for 2020-2024, the bifurcation of EMS Upgrade and RTC, and the reason for the separation of EMS/Passport. The program objectives, challenges faced in the EMS upgrade schedule, and the decision to separate the EMS Upgrade from
0 views • 13 slides
FSM Performance Issue Troubleshooting Flow Guide
Troubleshoot performance issues in FSM by following a detailed flow guide. Start by checking for performance degradation post-upgrade, verify upgrade source, review upgrade procedure adherence, investigate mobile-specific issues, analyze server processes, and take necessary actions to resolve perfor
1 views • 25 slides
One of the Best service for Switchboard Upgrade in Melton
Balzan Electrical Pty Ltd provides the Best service for Switchboard Upgrade in Melton. They specialize in downlighting, switchboard upgrades, smoke alarms, fault finding, power points, ceiling fans, and more. They also offer an emergency electrician
0 views • 6 slides
How to Upgrade Your SEO with Florida’s Top Company Vise Tech
\u2022\tWhen it comes to enhancing your online presence, Upgrade Your SEO with Vise Tech Florida\u2019s leading SEO company have the expertise to propel your business to the forefront of search engine results. Whether you\u2019re based in Miami, Coc
1 views • 1 slides
InRoads SS4 Upgrade Overview
KYTC has been working on the InRoads SS4 upgrade, with recent testing of CADD standards. The agenda includes a history of the upgrade process, changes in the new software, and a live demo. Workspace management and version details are outlined, along with a new approach to InRoads data and MicroStati
0 views • 20 slides
Upgrade to Optimal Quality with the Best Purging Compound for Plastic Developed
The growing world of thermoplastics demands higher quality, better safety, better value, better processes that are possible with engineered purging products. For more info visit: \/\/unicleanplus.wordpress.com\/2024\/09\/05\/upgrade-to-optimal-qualit
1 views • 5 slides
LHCb RICH2 Upgrade Mechanics Status Update November 2016
Mechanics and design status update of LHCb RICH2 upgrade focusing on T-bar and cooling system construction, cable tray design, connections, cooling geometry optimization, prototypes testing, and assembly progress. Details include materials used, dimensions, heat exchange calculations, pressure drops
0 views • 9 slides
Upgrade Your Scalp Care with Menfirst’s Shampoo Brush
Upgrade your hair care routine with Menfirst\u2019s shampoo brush. This essential tool promotes a cleaner scalp, reduces dandruff, and improves blood circulation for healthier, shinier hair. Learn how to use it effectively and enjoy the benefits of a
1 views • 4 slides
LMS Upgrade Project Timeline & Blackout Schedule
The Learning Center is undergoing an LMS upgrade project with User Acceptance Testing, production environment preparation, and a detailed timeline leading to the go-live date in November. Key tasks include user training, system availability updates, role assignments, content creation, and post-produ
0 views • 7 slides
Digital Upgrade Plan for AV Systems
Planning for a comprehensive upgrade of AV systems due to outdated equipment, poor design, and the need for brighter teaching materials. The advantages of digital upgrades are highlighted, along with a list of rooms requiring upgrades, focused on HD video support and future-proofing. Scheduling stra
0 views • 9 slides
CLAS12 Trigger System Upgrade Plan May 6, 2020
CLAS12 Trigger System is undergoing an upgrade to enhance trigger efficiency, purity, and data rate reduction. The existing hardware and trigger overview provide insight into the current system's components and operation. The upgrade goals aim to maintain high trigger efficiency, reduce data rates,
0 views • 14 slides
Concept for ALICE Upgrade: Gating Grid by Howard Wieman
The Technical Design Report outlines a plan to use GEM detectors for the TPC readout in ALICE upgrade, addressing issues with positive ion back flow. A modified gating grid design is proposed to block 100% of the back flow while maintaining data rate. The concept involves specific parameters and ope
0 views • 14 slides
EMC FY15Q1 Upgrade Review for GFS System
Upgrade review presented by Mark Iredell on the planned system changes and expected benefits for the Global Forecast System (GFS) in December 2014. Highlights include enhancements to modeling capabilities, forecast accuracy, and system optimizations across various components like analysis, model dyn
0 views • 28 slides
Comprehensive MPLS/WAN Solution for GPAA Network Upgrade
Network upgrade initiative across the enterprise with a focus on MPLS and WAN solutions. The requirements include full MPLS and WAN services, last mile connectivity, redundant connections, layer 2 connectivity between data centers, and more. The service provider must offer national footprint, SLA gu
0 views • 8 slides
Z2 Crediting Project Update RTWG Summary
Z2 Crediting Project is currently in the Execution phase with a green status. Recent updates include changes to requirements/scope, completion of Module 3 Functional Design, and ongoing testing and development activities. There are issues regarding missing/incorrect upgrade sponsor information, whic
0 views • 13 slides
Upgrade Requirements, Challenges, and Solutions for Same-Server DoT Implementation
Explore the transition from Do53 to DoT without changing resolvers, addressing challenges in DNS resolvers, TLS standards, and forwarder complications. Discover partial solutions through DANE TLSA certificates, DNS zone publishing, and DNSSEC trust anchors for enhanced security and upgrade process e
0 views • 14 slides
Muon Phase2 Upgrade: INFN Collaboration for Detector Enhancement
The Muon Phase 2 upgrade project aims to improve the performance of muon detectors for the HL-LHC conditions. Collaborating with INFN, the project focuses on maintaining excellent triggering and measurement capabilities under harsher conditions. Key aspects include existing detector consolidation, n
0 views • 17 slides
Windows 10 Upgrade Guide
Windows 10 is a free upgrade until July 29, 2016, offering faster boot times, new features like Cortana, and improved security. However, upgrading may pose challenges such as compatibility issues with older hardware and software. This guide covers the installation process, benefits, pitfalls to watc
0 views • 36 slides
ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation
Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr
0 views • 10 slides
Update on ALICE ITS Upgrade Efforts at CERN
Kickoff meeting for the ALICE ITS Upgrade in LS3 was held at CERN on December 4, 2019. The efforts focus on silicon R&D for next-gen MAPS sensor with improvements, low X/X0 cylindrical vertex detection, and a new sensor design. Milestones, organization of efforts, and future plans towards an EIC sil
0 views • 6 slides
R&D and Simulations on Gain Stability and IBF for ALICE GEM-TPC Upgrade
The research and development efforts, along with simulations, focus on enhancing gain stability and addressing issues related to Ion Back Flow (IBF) for the ALICE GEM-TPC upgrade. Detailed outline, status updates, and major challenges are discussed, highlighting the significance of the upgrade for i
0 views • 24 slides
High-Speed Laser Drive System Status and Upgrade Plan
Current status of the fast drive laser system includes a running laser with a 3MHz pulse train and a 5Hz repetition frequency. The system allows for easily achieving pulse lengths up to 200-300s, with potential for longer pulses after extensive tuning. The upgrade plan involves utilizing machine lea
0 views • 18 slides
High Voltage and Front-end Electronics for iRPC Upgrade
Detailed information regarding the high voltage configurations and front-end electronics setups for the upgraded Resistive Plate Chambers (RPCs). It covers different RPC designs, operational voltages, chamber configurations, HV connections, and power consumption data for the front-end electronics. T
0 views • 6 slides
Stress-free JD Edwards Upgrade Considerations and Tips
Differentia Consulting offers stress-free JD Edwards upgrade solutions with a focus on technical planning, tools, and customization. Their expert team specializes in EnterpriseOne platform changes, database upgrades, and more, ensuring successful project outcomes. Explore their comprehensive service
0 views • 13 slides
Sprint Network Upgrade Project at Fisher College
Fisher College Sprint network upgrade project aims to enhance network capacity in the Back Bay area by installing new equipment to accommodate additional customers during peak load times. The project involves antenna replacement, RRH installation, and conduit setup to optimize network performance. W
0 views • 15 slides
Research Upgrade Training Presentation: Epic Version Feb/May 2023 Preview
Explore the upcoming Research Upgrade Training Presentation for Epic Version Feb/May 2023, scheduled for release in October 2023. Enhancements include recording clinical significance for adverse events, tracking participant accrual, and new Medicare qualifying buttons in Billing Setup. Discover the
0 views • 4 slides
Upgrade Gotchas and Solutions for Microsoft Users at 2022 Dynamic Communities
Discover the essential information and insights on upgrade preparation challenges and solutions for Microsoft users, presented by industry experts at the largest independent gathering hosted by Dynamic Communities. Learn about unexpected gotchas, new functionality issues, permission hurdles, and mor
0 views • 11 slides
Best Practices for Upgrading Kentico Solutions
Explore the essential guidelines for successfully upgrading Kentico solutions, covering the upgrade process, upgrade-proof development, and tips for upgrading like a pro. Learn about the importance of upgrade-proof development, the steps involved in upgrading, and following best practices to ensure
0 views • 9 slides
AEM 6.5 Migration Initiative Overview
This initiative aims to resolve the compaction issue in AEM 6.5, reduce system locking time, and provide uninterrupted access to editorial teams. The primary goal is to eliminate compaction time and upgrade to the latest AEM version to benefit from security patches and new features. Main stakeholder
0 views • 19 slides
OpenStack Upgrade Process Overview
Detailed overview of the OpenStack upgrade process from RHEL 6 to RHEL 7, including strategies for upgrading control planes, high-level upgrade steps, database migration strategies, complications, and more.
0 views • 11 slides
Evolution of RCS Design and Upgrade Process at Fermilab
The Fermilab accelerators have undergone significant upgrades over the years, with developments such as the 2 GeV Linac, RCS design improvements, and the Snowmass 2.4 MW upgrade with RCS. Key advancements include enhanced beam intensity, better orbit control, and reliability. Various parameter varia
0 views • 32 slides
Understanding Leadership and Power Dynamics
Power and leadership are interconnected concepts, with power being the measure of a person's ability to influence others. Leaders have power in various situations, but it does not necessarily mean having power over people. Effective leaders balance their use of power with knowledge and trust, knowin
0 views • 9 slides
ESS Linac Upgrade - Power Requirements and Efficiency Analysis
The ESS Linac upgrade led by Chief Engineer Dave McGinnis focuses on enhancing power generation for neutron and neutrino research. Key elements include maximizing duty factor, RF power distribution, and timeline efficiency for ESSnuSB pulses. Challenges such as modulator charging and RF system cooli
0 views • 14 slides
Lostock Sustainable Energy Plant Local Liaison Committee Meeting Highlights
A summary of the discussions and updates from the Lostock Sustainable Energy Plant Local Liaison Committee meeting held on 28th February 2019. The meeting covered topics such as power upgrade applications, site works progress, future work activities, and project updates. Details on the proposed powe
0 views • 18 slides