Detailed progress update on the cooling system upgrade project involving evaluation of the Huber chiller, instrumenting the system, initial trials, calibration, and collaboration with students for assistance and support. The project aims to enhance cooling efficiency for a 100W load by equating power loss to temperature differentials, specific heat, and flow rate parameters.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Cooling iRPC FEB Progress and steps Ian 23 Feb 2024
Check that the Huber chiller , now 13 ? Years old does the job of cooling down the 100W load See photos and plots from Mohammed Plan to attach rack to floor Time to instrument the first step with temp and mass flow rate to equate power loss to delta T, Cp and flow rate See Arduino ( No ESP33 ?) programme and initial trial comp air , with Zubayda. This is also the step to making the interlock on flow failure for the final system Calibration of the flow meter against elevated reservoir and analogue flow meter.
Students giving assistance Zubayda zubayda.eve.kofi@cern.ch Lucia sanchez lucia.eiriz.sanchez@cern.ch Mohammed mohammad.ahammad.ali@cern.ch Their responsible here; Robert Philip Keatch