Linac upgrade - PowerPoint PPT Presentation


Overview of ESRF-EBS 352 MHz RF System Upgrade at 26th ESL RF Meeting

The 26th ESL RF Meeting held at Elettra in Trieste discussed the status and upgrades of the ESRF-EBS 352 MHz RF system. The meeting covered topics such as the EBS RF layout, HOM damped cavities, RF ECO-Mode, ongoing RF projects, and the replacement of klystrons with SSAs for a 4th harmonic RF system

0 views • 16 slides


Overview of ALICE Data Acquisition System Upgrade for LHC Run 3

ALICE is undergoing significant upgrades for LHC Run 3, including the implementation of the O2/FLP system. This upgrade will enhance data acquisition, processing, and storage capabilities. Key elements include new computing systems, software, and portfolio enhancements. The project overview outlines

1 views • 23 slides



DPM Reforms Workshop 2023: Rise Up, Step Up, Speak Up for Payroll Upgrade

The Department of Personnel Management is embarking on a reform journey with the Rise Up, Step Up, Speak Up workshop in 2023 to upgrade their payroll system from the outdated Version 12 to higher versions with new features. Deloitte's findings highlighted the need for system upgrades, improved HR po

1 views • 18 slides


Overview of PARMELA Simulation Code for Electron Linac Design

PARMELA is an electron linac design code used for macroparticle tracing. It is a flexible program with 40 keywords that define various elements and actions in the input data. The main program controls the logical flow, while the PARDYN subroutine manages particle dynamics calculations. Although acce

0 views • 13 slides


Advanced Cryomodule Technology for China's Spallation Neutron Source Upgrade

This article discusses the development of a Double-Spoke Cavity Cryomodule for the China Spallation Neutron Source (CSNS) project. It covers the structure of the cryomodule, integration processes, future work, and details about the CSNS beam parameters and upgrade scheme. The content includes images

0 views • 19 slides


Earth-GRAM Overview and Updates 2023

Earth-GRAM is a global reference atmospheric model providing monthly mean and standard deviation data for various atmospheric variables. It is used in engineering for dispersion simulations but is not a forecasting model. Updates to Earth-GRAM include the Modern Era Retrospective Analysis, a global

0 views • 19 slides


ERCOT Passport Program Update and EMS/RTC Bifurcation Summary

ERCOT's Passport Program Update includes details on the Scope and Delivery for 2020-2024, the bifurcation of EMS Upgrade and RTC, and the reason for the separation of EMS/Passport. The program objectives, challenges faced in the EMS upgrade schedule, and the decision to separate the EMS Upgrade from

0 views • 13 slides


FSM Performance Issue Troubleshooting Flow Guide

Troubleshoot performance issues in FSM by following a detailed flow guide. Start by checking for performance degradation post-upgrade, verify upgrade source, review upgrade procedure adherence, investigate mobile-specific issues, analyze server processes, and take necessary actions to resolve perfor

1 views • 25 slides


Specific Controls Requirements for p-Linac at GSI Helmholtzzentrum

Explore the specific control requirements for the p-Linac at GSI Helmholtzzentrum, including detailed information on beam energy, design current, RF power, and related devices. Get insights into the overall design, main devices, FAIR primary beam chain, booster operation, and parallel operation exam

0 views • 13 slides


One of the Best service for Switchboard Upgrade in Melton

Balzan Electrical Pty Ltd provides the Best service for Switchboard Upgrade in Melton. They specialize in downlighting, switchboard upgrades, smoke alarms, fault finding, power points, ceiling fans, and more. They also offer an emergency electrician

0 views • 6 slides


How to Upgrade Your SEO with Florida’s Top Company Vise Tech

\u2022\tWhen it comes to enhancing your online presence, Upgrade Your SEO with Vise Tech Florida\u2019s leading SEO company have the expertise to propel your business to the forefront of search engine results. Whether you\u2019re based in Miami, Coc

1 views • 1 slides


InRoads SS4 Upgrade Overview

KYTC has been working on the InRoads SS4 upgrade, with recent testing of CADD standards. The agenda includes a history of the upgrade process, changes in the new software, and a live demo. Workspace management and version details are outlined, along with a new approach to InRoads data and MicroStati

0 views • 20 slides


Upgrade to Optimal Quality with the Best Purging Compound for Plastic Developed

The growing world of thermoplastics demands higher quality, better safety, better value, better processes that are possible with engineered purging products. For more info visit: \/\/unicleanplus.wordpress.com\/2024\/09\/05\/upgrade-to-optimal-qualit

1 views • 5 slides


LHCb RICH2 Upgrade Mechanics Status Update November 2016

Mechanics and design status update of LHCb RICH2 upgrade focusing on T-bar and cooling system construction, cable tray design, connections, cooling geometry optimization, prototypes testing, and assembly progress. Details include materials used, dimensions, heat exchange calculations, pressure drops

0 views • 9 slides


Upgrade Your Scalp Care with Menfirst’s Shampoo Brush

Upgrade your hair care routine with Menfirst\u2019s shampoo brush. This essential tool promotes a cleaner scalp, reduces dandruff, and improves blood circulation for healthier, shinier hair. Learn how to use it effectively and enjoy the benefits of a

1 views • 4 slides


LMS Upgrade Project Timeline & Blackout Schedule

The Learning Center is undergoing an LMS upgrade project with User Acceptance Testing, production environment preparation, and a detailed timeline leading to the go-live date in November. Key tasks include user training, system availability updates, role assignments, content creation, and post-produ

0 views • 7 slides


Digital Upgrade Plan for AV Systems

Planning for a comprehensive upgrade of AV systems due to outdated equipment, poor design, and the need for brighter teaching materials. The advantages of digital upgrades are highlighted, along with a list of rooms requiring upgrades, focused on HD video support and future-proofing. Scheduling stra

0 views • 9 slides


CLAS12 Trigger System Upgrade Plan May 6, 2020

CLAS12 Trigger System is undergoing an upgrade to enhance trigger efficiency, purity, and data rate reduction. The existing hardware and trigger overview provide insight into the current system's components and operation. The upgrade goals aim to maintain high trigger efficiency, reduce data rates,

0 views • 14 slides


Concept for ALICE Upgrade: Gating Grid by Howard Wieman

The Technical Design Report outlines a plan to use GEM detectors for the TPC readout in ALICE upgrade, addressing issues with positive ion back flow. A modified gating grid design is proposed to block 100% of the back flow while maintaining data rate. The concept involves specific parameters and ope

0 views • 14 slides


Development of 650 MHz RF Power Systems for PIP-II Linac

The project involves designing and fabricating 325 MHz and 650 MHz RF power systems for PIP-II Linac. Various milestones, including the development of 40 kW RF systems, testing prototypes, and collaboration between RRCAT and Fermilab, are outlined. The high-level goal is to achieve specific power le

0 views • 16 slides


Development of RF Power System for PRAE Linac Project

Development of an RF power system for the PRAE Linac project, involves the support of RF power and RF distribution for SESAME program. The project includes sourcing power for the gun and accelerating structure modulator, construction and testing of modulator components, and simulation of modulator o

0 views • 9 slides


Overview of Electron/Positron Injector Linac Upgrades at KEK

The recent status of the Electron/Positron Injector Linac at KEK, presented by Kazuro Furukawa, highlights the mission to achieve 40 times higher luminosity in the SuperKEKB collider. The upgrades include low emittance, low energy spread injection beams with higher beam current, new high-current pho

0 views • 23 slides


Status of Anthem Flash Linac Project at UNICT

Detailed insights into the Anthem Flash Linac project at UNICT including machine characteristics, source features, shielding calculations, installation site, and potential configurations. Emphasis on radioprotection aspects, primary electron radiation, X-rays, bremsstrahlung field, and shielding req

0 views • 18 slides


Muon Phase2 Upgrade: INFN Collaboration for Detector Enhancement

The Muon Phase 2 upgrade project aims to improve the performance of muon detectors for the HL-LHC conditions. Collaborating with INFN, the project focuses on maintaining excellent triggering and measurement capabilities under harsher conditions. Key aspects include existing detector consolidation, n

0 views • 17 slides


Windows 10 Upgrade Guide

Windows 10 is a free upgrade until July 29, 2016, offering faster boot times, new features like Cortana, and improved security. However, upgrading may pose challenges such as compatibility issues with older hardware and software. This guide covers the installation process, benefits, pitfalls to watc

0 views • 36 slides


ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation

Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr

0 views • 10 slides


SuperKEKB Linac RF Distribution System Upgrades Overview

The SuperKEKB Linac RF Distribution System underwent various upgrades and installations to enhance performance and functionality. These included improvements to the Injector Master Oscillator Phase Shifter, S-band Phase Shifter for DR Downstream, LLRF Control Unit, RF Monitoring systems, and more. A

0 views • 29 slides


R&D and Simulations on Gain Stability and IBF for ALICE GEM-TPC Upgrade

The research and development efforts, along with simulations, focus on enhancing gain stability and addressing issues related to Ion Back Flow (IBF) for the ALICE GEM-TPC upgrade. Detailed outline, status updates, and major challenges are discussed, highlighting the significance of the upgrade for i

0 views • 24 slides


Overview of CLIC Main Linac Accelerating Structure Design

Detailed discussion on the RF design constraints, beam dynamics, and structure optimization for the CLIC main linac accelerating structure. The analysis covers parameters such as bunch population, wake suppression, RF breakdown, and surface heating constraints. Additionally, the first generation of

0 views • 26 slides


Stress-free JD Edwards Upgrade Considerations and Tips

Differentia Consulting offers stress-free JD Edwards upgrade solutions with a focus on technical planning, tools, and customization. Their expert team specializes in EnterpriseOne platform changes, database upgrades, and more, ensuring successful project outcomes. Explore their comprehensive service

0 views • 13 slides


Sprint Network Upgrade Project at Fisher College

Fisher College Sprint network upgrade project aims to enhance network capacity in the Back Bay area by installing new equipment to accommodate additional customers during peak load times. The project involves antenna replacement, RRH installation, and conduit setup to optimize network performance. W

0 views • 15 slides


Best Practices for Upgrading Kentico Solutions

Explore the essential guidelines for successfully upgrading Kentico solutions, covering the upgrade process, upgrade-proof development, and tips for upgrading like a pro. Learn about the importance of upgrade-proof development, the steps involved in upgrading, and following best practices to ensure

0 views • 9 slides


AEM 6.5 Migration Initiative Overview

This initiative aims to resolve the compaction issue in AEM 6.5, reduce system locking time, and provide uninterrupted access to editorial teams. The primary goal is to eliminate compaction time and upgrade to the latest AEM version to benefit from security patches and new features. Main stakeholder

0 views • 19 slides


OpenStack Upgrade Process Overview

Detailed overview of the OpenStack upgrade process from RHEL 6 to RHEL 7, including strategies for upgrading control planes, high-level upgrade steps, database migration strategies, complications, and more.

0 views • 11 slides


Evolution of RCS Design and Upgrade Process at Fermilab

The Fermilab accelerators have undergone significant upgrades over the years, with developments such as the 2 GeV Linac, RCS design improvements, and the Snowmass 2.4 MW upgrade with RCS. Key advancements include enhanced beam intensity, better orbit control, and reliability. Various parameter varia

0 views • 32 slides


Electron Beam Analysis and Optimization for RF Linac in Inverse Compton Scattering

This research activity report discusses the analysis and optimization of a 6D phase space electron beam for RF Linac-based Inverse Compton Scattering radiation sources. It covers the SPARC_LAB Thomson Source and ELI-NP GBS, including experiments, simulations, and studies on beam parameters and struc

0 views • 26 slides


Overview of Neutrino Beams in China: MOMENT Study Progress and Potential

The MOMENT study, initiated in 2013 in China, focuses on muon-decay medium baseline neutrino beam facility development. Using a Continuous Wave (CW) proton linac, the project aims to achieve 15 MW beam power for neutrino cross-section measurements and CP phase study. Recent progress includes the suc

0 views • 28 slides


Overview of PERLE Injector Design & ALICE Electron Gun Re-optimisation

The PERLE injector, part of the Powerful Energy Recovery Linac for Experiments (PERLE), operates at 7 MeV injection energy with a bunch charge of 500 pC and a bunch repetition rate of 40.1 MHz. The layout includes a DC photoemission electron gun, bunching and focusing sections, and a superconducting

0 views • 50 slides


ESS Linac Upgrade - Power Requirements and Efficiency Analysis

The ESS Linac upgrade led by Chief Engineer Dave McGinnis focuses on enhancing power generation for neutron and neutrino research. Key elements include maximizing duty factor, RF power distribution, and timeline efficiency for ESSnuSB pulses. Challenges such as modulator charging and RF system cooli

0 views • 14 slides


Accelerator Upgrade Workshop Summary

Comprehensive analysis of the recent ACE Science Workshop discussions on accelerator upgrades for the LBNF program, including key points on both ACE RCS and ACE Linac approaches, muon collider considerations, high-power targetry R&D needs, technical/performance risks, and proposed next steps for sys

0 views • 12 slides