Ecal upgrade - PowerPoint PPT Presentation


Overview of ESRF-EBS 352 MHz RF System Upgrade at 26th ESL RF Meeting

The 26th ESL RF Meeting held at Elettra in Trieste discussed the status and upgrades of the ESRF-EBS 352 MHz RF system. The meeting covered topics such as the EBS RF layout, HOM damped cavities, RF ECO-Mode, ongoing RF projects, and the replacement of klystrons with SSAs for a 4th harmonic RF system

0 views • 16 slides


Overview of ALICE Data Acquisition System Upgrade for LHC Run 3

ALICE is undergoing significant upgrades for LHC Run 3, including the implementation of the O2/FLP system. This upgrade will enhance data acquisition, processing, and storage capabilities. Key elements include new computing systems, software, and portfolio enhancements. The project overview outlines

1 views • 23 slides



DPM Reforms Workshop 2023: Rise Up, Step Up, Speak Up for Payroll Upgrade

The Department of Personnel Management is embarking on a reform journey with the Rise Up, Step Up, Speak Up workshop in 2023 to upgrade their payroll system from the outdated Version 12 to higher versions with new features. Deloitte's findings highlighted the need for system upgrades, improved HR po

1 views • 18 slides


Advanced Cryomodule Technology for China's Spallation Neutron Source Upgrade

This article discusses the development of a Double-Spoke Cavity Cryomodule for the China Spallation Neutron Source (CSNS) project. It covers the structure of the cryomodule, integration processes, future work, and details about the CSNS beam parameters and upgrade scheme. The content includes images

0 views • 19 slides


Earth-GRAM Overview and Updates 2023

Earth-GRAM is a global reference atmospheric model providing monthly mean and standard deviation data for various atmospheric variables. It is used in engineering for dispersion simulations but is not a forecasting model. Updates to Earth-GRAM include the Modern Era Retrospective Analysis, a global

0 views • 19 slides


ERCOT Passport Program Update and EMS/RTC Bifurcation Summary

ERCOT's Passport Program Update includes details on the Scope and Delivery for 2020-2024, the bifurcation of EMS Upgrade and RTC, and the reason for the separation of EMS/Passport. The program objectives, challenges faced in the EMS upgrade schedule, and the decision to separate the EMS Upgrade from

0 views • 13 slides


FSM Performance Issue Troubleshooting Flow Guide

Troubleshoot performance issues in FSM by following a detailed flow guide. Start by checking for performance degradation post-upgrade, verify upgrade source, review upgrade procedure adherence, investigate mobile-specific issues, analyze server processes, and take necessary actions to resolve perfor

1 views • 25 slides


One of the Best service for Switchboard Upgrade in Melton

Balzan Electrical Pty Ltd provides the Best service for Switchboard Upgrade in Melton. They specialize in downlighting, switchboard upgrades, smoke alarms, fault finding, power points, ceiling fans, and more. They also offer an emergency electrician

0 views • 6 slides


How to Upgrade Your SEO with Florida’s Top Company Vise Tech

\u2022\tWhen it comes to enhancing your online presence, Upgrade Your SEO with Vise Tech Florida\u2019s leading SEO company have the expertise to propel your business to the forefront of search engine results. Whether you\u2019re based in Miami, Coc

1 views • 1 slides


Energy Escaping Study in GRAiNITA Electromagnetic Calorimeter

Study by Denys Klekots focuses on analyzing energy escaping from the GRAiNITA electromagnetic calorimeter, using Geant4 simulations to investigate energy deposition, escaped energy fluctuations, and non-uniformity in the ECAL setup. The research delves into the impact of leakage and non-uniformity o

0 views • 10 slides


InRoads SS4 Upgrade Overview

KYTC has been working on the InRoads SS4 upgrade, with recent testing of CADD standards. The agenda includes a history of the upgrade process, changes in the new software, and a live demo. Workspace management and version details are outlined, along with a new approach to InRoads data and MicroStati

0 views • 20 slides


Upgrade to Optimal Quality with the Best Purging Compound for Plastic Developed

The growing world of thermoplastics demands higher quality, better safety, better value, better processes that are possible with engineered purging products. For more info visit: \/\/unicleanplus.wordpress.com\/2024\/09\/05\/upgrade-to-optimal-qualit

1 views • 5 slides


LHCb RICH2 Upgrade Mechanics Status Update November 2016

Mechanics and design status update of LHCb RICH2 upgrade focusing on T-bar and cooling system construction, cable tray design, connections, cooling geometry optimization, prototypes testing, and assembly progress. Details include materials used, dimensions, heat exchange calculations, pressure drops

0 views • 9 slides


Upgrade Your Scalp Care with Menfirst’s Shampoo Brush

Upgrade your hair care routine with Menfirst\u2019s shampoo brush. This essential tool promotes a cleaner scalp, reduces dandruff, and improves blood circulation for healthier, shinier hair. Learn how to use it effectively and enjoy the benefits of a

1 views • 4 slides


LMS Upgrade Project Timeline & Blackout Schedule

The Learning Center is undergoing an LMS upgrade project with User Acceptance Testing, production environment preparation, and a detailed timeline leading to the go-live date in November. Key tasks include user training, system availability updates, role assignments, content creation, and post-produ

0 views • 7 slides


Digital Upgrade Plan for AV Systems

Planning for a comprehensive upgrade of AV systems due to outdated equipment, poor design, and the need for brighter teaching materials. The advantages of digital upgrades are highlighted, along with a list of rooms requiring upgrades, focused on HD video support and future-proofing. Scheduling stra

0 views • 9 slides


CLAS12 Trigger System Upgrade Plan May 6, 2020

CLAS12 Trigger System is undergoing an upgrade to enhance trigger efficiency, purity, and data rate reduction. The existing hardware and trigger overview provide insight into the current system's components and operation. The upgrade goals aim to maintain high trigger efficiency, reduce data rates,

0 views • 14 slides


Concept for ALICE Upgrade: Gating Grid by Howard Wieman

The Technical Design Report outlines a plan to use GEM detectors for the TPC readout in ALICE upgrade, addressing issues with positive ion back flow. A modified gating grid design is proposed to block 100% of the back flow while maintaining data rate. The concept involves specific parameters and ope

0 views • 14 slides


EMC FY15Q1 Upgrade Review for GFS System

Upgrade review presented by Mark Iredell on the planned system changes and expected benefits for the Global Forecast System (GFS) in December 2014. Highlights include enhancements to modeling capabilities, forecast accuracy, and system optimizations across various components like analysis, model dyn

0 views • 28 slides


Comprehensive MPLS/WAN Solution for GPAA Network Upgrade

Network upgrade initiative across the enterprise with a focus on MPLS and WAN solutions. The requirements include full MPLS and WAN services, last mile connectivity, redundant connections, layer 2 connectivity between data centers, and more. The service provider must offer national footprint, SLA gu

0 views • 8 slides


Advanced Calorimeter Technology for Particle Detection

Cutting-edge calorimeter technology for high-energy physics experiments is discussed in this content. The focus is on radiation-hard crystal scintillators and plastic scintillator-based Shashlik technology used in the present ECAL. Details about the requirements, materials, irradiation tests, and ad

0 views • 16 slides


Z2 Crediting Project Update RTWG Summary

Z2 Crediting Project is currently in the Execution phase with a green status. Recent updates include changes to requirements/scope, completion of Module 3 Functional Design, and ongoing testing and development activities. There are issues regarding missing/incorrect upgrade sponsor information, whic

0 views • 13 slides


Upgrade Requirements, Challenges, and Solutions for Same-Server DoT Implementation

Explore the transition from Do53 to DoT without changing resolvers, addressing challenges in DNS resolvers, TLS standards, and forwarder complications. Discover partial solutions through DANE TLSA certificates, DNS zone publishing, and DNSSEC trust anchors for enhanced security and upgrade process e

0 views • 14 slides


Latest Update on Sci-ECAL MIP Results by Jiaxuan Wang

Jiaxuan Wang presents an update on Sci-ECAL MIP results as of March 8, 2024. The new method for muon energy reconstruction involves multiple fittings to exclude noise hits and obtain the real track and hits. The muon energy is estimated around 0.3049 MeV using new MIP calibration results. Despite pr

0 views • 4 slides


Muon Phase2 Upgrade: INFN Collaboration for Detector Enhancement

The Muon Phase 2 upgrade project aims to improve the performance of muon detectors for the HL-LHC conditions. Collaborating with INFN, the project focuses on maintaining excellent triggering and measurement capabilities under harsher conditions. Key aspects include existing detector consolidation, n

0 views • 17 slides


Insights from PADME ECal Meeting: Rejection Studies and BG Analysis

Explore the discussions and findings from the PADME ECal meeting on topics such as gamma rejection studies, toy MC studies of gamma background, ECAL geometrical definitions, BG studies, and detector acceptance. Key points include the proposal for a lead glass-based SAC and considerations on ineffici

0 views • 27 slides


Laser Ablation for Generation of Nanoparticles and Nanowires: Workshop Insights

Explore the latest research on laser ablation techniques for generating nanoparticles and nanowires, presented at the Si-W Ecal Workshop in Korea. Discover the various methods, applications in solar cells and LEDs, and the use of semiconductor materials. Learn about the advanced 20-TW laser system a

0 views • 31 slides


Windows 10 Upgrade Guide

Windows 10 is a free upgrade until July 29, 2016, offering faster boot times, new features like Cortana, and improved security. However, upgrading may pose challenges such as compatibility issues with older hardware and software. This guide covers the installation process, benefits, pitfalls to watc

0 views • 36 slides


ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation

Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr

0 views • 10 slides


Update on ALICE ITS Upgrade Efforts at CERN

Kickoff meeting for the ALICE ITS Upgrade in LS3 was held at CERN on December 4, 2019. The efforts focus on silicon R&D for next-gen MAPS sensor with improvements, low X/X0 cylindrical vertex detection, and a new sensor design. Milestones, organization of efforts, and future plans towards an EIC sil

0 views • 6 slides


R&D and Simulations on Gain Stability and IBF for ALICE GEM-TPC Upgrade

The research and development efforts, along with simulations, focus on enhancing gain stability and addressing issues related to Ion Back Flow (IBF) for the ALICE GEM-TPC upgrade. Detailed outline, status updates, and major challenges are discussed, highlighting the significance of the upgrade for i

0 views • 24 slides


Stress-free JD Edwards Upgrade Considerations and Tips

Differentia Consulting offers stress-free JD Edwards upgrade solutions with a focus on technical planning, tools, and customization. Their expert team specializes in EnterpriseOne platform changes, database upgrades, and more, ensuring successful project outcomes. Explore their comprehensive service

0 views • 13 slides


Sprint Network Upgrade Project at Fisher College

Fisher College Sprint network upgrade project aims to enhance network capacity in the Back Bay area by installing new equipment to accommodate additional customers during peak load times. The project involves antenna replacement, RRH installation, and conduit setup to optimize network performance. W

0 views • 15 slides


Best Practices for Upgrading Kentico Solutions

Explore the essential guidelines for successfully upgrading Kentico solutions, covering the upgrade process, upgrade-proof development, and tips for upgrading like a pro. Learn about the importance of upgrade-proof development, the steps involved in upgrading, and following best practices to ensure

0 views • 9 slides


AEM 6.5 Migration Initiative Overview

This initiative aims to resolve the compaction issue in AEM 6.5, reduce system locking time, and provide uninterrupted access to editorial teams. The primary goal is to eliminate compaction time and upgrade to the latest AEM version to benefit from security patches and new features. Main stakeholder

0 views • 19 slides


OpenStack Upgrade Process Overview

Detailed overview of the OpenStack upgrade process from RHEL 6 to RHEL 7, including strategies for upgrading control planes, high-level upgrade steps, database migration strategies, complications, and more.

0 views • 11 slides


SoLID Collaboration Meeting Summary - June 8th, 2020

Outline of the SoLID collaboration meeting discussing DAQ requirements, trigger rates, infrastructure, and R&D items. Details on detector layouts and triggers for PVDIS and SIDIS, with information on SoLID requirements and associated risks. SoLID DAQ overview based on 12 GeV FADC electronics. Discus

0 views • 35 slides


Analysis of E/p Position Changes in Particle Reconstructed Energy Over Time

In the analysis of E/p position changes for electron, proton, and helium particles over time, a noticeable increase in the E/p peak position for electrons was observed, while the E/p peak positions for protons and helium remained relatively stable, especially for EnergyD. The changes observed after

0 views • 23 slides


Simulation of the Hybrid ECAL Workshop at Kyushu University 2012

Hybrid ECAL, a solution combining Silicon and Scintillator-strip layers, was studied at the workshop held at Kyushu University in May 2012. The configuration, parameters, calibration, and performance evaluation of the Hybrid ECAL were discussed. The study focused on achieving a cost-effective ECAL w

0 views • 10 slides


CALO Upgrade R&D Plans and Solutions for Future ECAL Technology Selection

The R&D initiative focuses on selecting technology for the central area of Phase II ECAL, aiming for high luminosity and detector performance. Various solutions are proposed, including sampling calorimeters with innovative materials like Ce-doped fibers and radiation-hard scintillators. Plans involv

0 views • 12 slides