Status of DAC Questions and Progress Update on ATHENA Proposal

Slide Note
Embed
Share

The provided Dropbox links contain files and information related to the DPAP Preamble question, status of answers to DAC questions, and updates on the ATHENA Proposal integration and review process. The document highlights the current progress, pending actions, and areas needing attention for resolution. Ensure thorough cross-checking of the table and timely completion of pending tasks. Key updates on materials, design upgrades, and timelines are also mentioned.


Uploaded on Oct 06, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. DPAP Preamble question xlsx file prepared and uploaded in the dropbox where the material to answer question is being collected: Dropbox: https://www.dropbox.com/sh/482kxfv2og3nqmd/AABNV9T917tY5GYIodvZiH8Oa?dl=0 Dropbox/ATHENA-Proposal/Integration/Review Also reachable via : https://www.dropbox.com/sh/7myjjr7ck60es0i/AADe9giiQihj2o6ejgjx4S8oa?dl=0 Dropbox/ATHENA-Proposal, then selecting Integration, Review File name:

  2. DPAP Preamble question In file Introductory text:

  3. DPAP Preamble question In file Table to be cross-checked/corrected by the authors of the plots in the Proposal PLEASE, check and confirm/correct according to needs! THANK YOU !

  4. Status of the answers to the DAC questions From DAC (received on 12/22,2021): https://tuprd- my.sharepoint.com/:x:/g/personal/tue59914_temple_edu/Ed_TrOoKjSZGn4b4j5NnMMsBr2wn8oxsEMaXtXqB skvzzA Timelines DAC o DAC dead-line: 1/9 o internal dead-line: 1/5

  5. Status of the answers to the DAC questions REMINDER: PID1 and AX1 (about cost comparison with YR) cancelled TR1 (Si tracking) final? Do we have any comparative information (from previous exercises) about the material impact on p resolution and vertex resolution ? TR2 (Si tracking) final? It includes some plots about radioactivity at ATHENA which are (i) too small, (ii) non really linked with the text in the slide TR3 ( RWell) not updated after discussion on Monday TR4 (fluorocarbons vs pressurized Ar for RICHes) ideas for the vessel mechanics missing CA1 (bECal) material showed by Maria on Monday not transferred in slides using template and added in the common Dropbox directory CA2 (bECal) material showed by Maria on Monday not transferred in slides using template and added in the common Dropbox directory

  6. Status of the answers to the DAC questions EL1-6 (electronics) in preparation (Alexandre, Jeff, Elke, Sylvester, Andrea, Silvia) second dedicated meeting on Friday MA1 (magnet cost) not yet available CR1- (decision about ATHENA design upgrades, timelines and costs) final

Related


More Related Content