Task 1: Software and Hardware Improvements
Task 1: Software and Hardware Improvements
Task 2: Development of AASHTO Data Collection and Analysis
Task 2: Development of AASHTO Data Collection and Analysis
Specifications
Specifications
Task 3: Precision and Bias Statement
Task 4: Equipment and Operator Certification
Task 5: Support Communication
T
a
s
k
 
6
:
 
P
r
o
v
i
d
e
 
T
r
a
i
n
i
n
g
 
a
n
d
 
T
e
c
h
n
i
c
a
l
 
A
s
s
i
s
t
a
n
c
e
 
 
 
 
T
a
s
k
 
7
:
 
P
r
o
m
o
t
e
 
t
h
e
 
t
e
c
h
n
o
l
o
g
y
 
 
2
 
T
a
s
k
s
 
 
Task 1: Software and Hardware Improvements
 
   * Delay of GSSI contract due to the pandemic
  
- Contract extended: Dec. 2021
  
- Majority of work are done
          * New software release:  End of April and June
 
   * Obtained Pavescan 2.0 in June 2020
 
   * Evaluated and worked with GSSI to improve the system
  
- Ex: arm connection broken
  
- New features in software
  
     Ex: Playback range
 
3
 
T
a
s
k
s
 
 
Task 2: Development of AASHTO Data Collection and Analysis
Task 2: Development of AASHTO Data Collection and Analysis
Specifications
Specifications
 
 
  * 
  * 
Drafted laboratory puck calibration and field data collection procedures
Drafted laboratory puck calibration and field data collection procedures
 
 
     and training videos based on PaveScan1.0
     and training videos based on PaveScan1.0
 
 
   * Updated puck calibration training video using 2.0
   * Updated puck calibration training video using 2.0
          
          
http://www.dot.state.mn.us/materials/dps/index.html
http://www.dot.state.mn.us/materials/dps/index.html
          * Plan to update field data collection video and the procedures using 2.0 by
          * Plan to update field data collection video and the procedures using 2.0 by
 
 
     the end of May.
     the end of May.
          *  MnDOT:
          *  MnDOT:
 
 
          - Continued data collection: 
          - Continued data collection: 
Th251(D6); Th95(M); Th2(D2); Th25(M)
Th251(D6); Th95(M); Th2(D2); Th25(M)
                    - 2021: pilot “pay for data” program vs “pay for hour”
                    - 2021: pilot “pay for data” program vs “pay for hour”
                    - Drafted a data format specification
                    - Drafted a data format specification
 
4
 
T
a
s
k
s
 
 
Task 3&4: Precision and Bias Statement & Equipment and
Operator Certification
 
 * 
Contract with NCAT in Dec. 2020
 
 *  Dr. Fabricio Leiva will give detailed testing plan
         * Round robin testing for lab puck calibration procedure.
Task 5: Support Communication
        * 
Monthly meeting with FHWA
          * Continue to provide online support
 
  * Face to face meeting this fall or next spring?
 
 
5
 
T
a
s
k
 
6
:
 
P
r
o
v
i
d
e
 
T
r
a
i
n
i
n
g
 
a
n
d
 
T
e
c
h
n
i
c
a
l
 
A
s
s
i
s
t
a
n
c
e
    * 
    * 
Have been providing online assistance and continue to do so
Have been providing online assistance and continue to do so
     * If needed, we can provide onsite training once we are allowed to travel.
     * If needed, we can provide onsite training once we are allowed to travel.
     * FHWA mobile lab: loan program and provide training
     * FHWA mobile lab: loan program and provide training
 
T
a
s
k
 
7
:
 
P
r
o
m
o
t
e
 
t
h
e
 
t
e
c
h
n
o
l
o
g
y
    *
    *
 
Craig Landefeld and Rich Giessel gave excellent presentations at FHWA
Craig Landefeld and Rich Giessel gave excellent presentations at FHWA
 
 
  DSP 101 workshop
  DSP 101 workshop
    *  FHWA mobile lab loan program
    *  FHWA mobile lab loan program
    *  Presentations at our biweekly bituminous meetings & MEO meeting
    *  Presentations at our biweekly bituminous meetings & MEO meeting
    *  Continue to promote the technology to contractors
    *  Continue to promote the technology to contractors
    *  Will make a brochure
    *  Will make a brochure
 
 
6
 
 
7
 
M
n
D
O
T
 
A
c
t
i
v
i
t
y
 
(
B
e
y
o
n
d
 
t
h
e
 
P
o
o
l
e
d
F
u
n
d
)
 
 
8
 
B
u
d
g
e
t
 
9
 
T
h
a
n
k
 
y
o
u
!
Slide Note
Embed
Share

This update covers tasks such as software and hardware improvements, development of AASHTO data collection specifications, precision and bias statements, equipment certification, support communication, training, and technology promotion. The project involves various phases, including delays due to the pandemic, software releases, data collection, and training initiatives.

  • MnDOT
  • Materials
  • Road Research
  • Project Update
  • Technology

Uploaded on Feb 24, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Project Status Update [Pooled Fund: TPF 5(443)] (April 6, 2021) Mn/DOT Office of Materials and Road Research

  2. Tasks Task 1: Software and Hardware Improvements Task 2: Development of AASHTO Data Collection and Analysis Specifications Task 3: Precision and Bias Statement Task 4: Equipment and Operator Certification Task 5: Support Communication Task 6: Provide Training and Technical Assistance Task 7: Promote the technology 2

  3. Tasks Task 1: Software and Hardware Improvements * Delay of GSSI contract due to the pandemic - Contract extended: Dec. 2021 - Majority of work are done * New software release: End of April and June * Obtained Pavescan 2.0 in June 2020 * Evaluated and worked with GSSI to improve the system - Ex: arm connection broken - New features in software Ex: Playback range 3

  4. Tasks Task 2: Development of AASHTO Data Collection and Analysis Specifications * Drafted laboratory puck calibration and field data collection procedures and training videos based on PaveScan1.0 * Updated puck calibration training video using 2.0 http://www.dot.state.mn.us/materials/dps/index.html * Plan to update field data collection video and the procedures using 2.0 by the end of May. * MnDOT: - Continued data collection: Th251(D6); Th95(M); Th2(D2); Th25(M) - 2021: pilot pay for data program vs pay for hour - Drafted a data format specification 4

  5. Task 3&4: Precision and Bias Statement & Equipment and Operator Certification * Contract with NCAT in Dec. 2020 * Dr. Fabricio Leiva will give detailed testing plan * Round robin testing for lab puck calibration procedure. Task 5: Support Communication * Monthly meeting with FHWA * Continue to provide online support * Face to face meeting this fall or next spring? 5

  6. Task 6: Provide Training and Technical Assistance * Have been providing online assistance and continue to do so * If needed, we can provide onsite training once we are allowed to travel. * FHWA mobile lab: loan program and provide training Task 7: Promote the technology * Craig Landefeld and Rich Giessel gave excellent presentations at FHWA DSP 101 workshop * FHWA mobile lab loan program * Presentations at our biweekly bituminous meetings & MEO meeting * Continue to promote the technology to contractors * Will make a brochure 6

  7. MnDOT Activity (Beyond the Pooled Fund) 7

  8. Budget 8

  9. Thank you! 9