Science Electives Offered at West Campus

  Construction of Apartments Building at
Gisenyi
   Plot N
o
 1573
   Gisenyi/ Rubavu
Project Brief
 
Prepared by : COBATOP
Company
 
Date : SEPTEMBRE 2017
Client :
Mr. 
SEBURO PAUL
 
PROJECT BACKGROUND
Project
 Location
The project  will be located in
Gisenyi right in front of catholic
church of Muhato
 
Western Province
District : Rubavu
Sector : 
Rubavu
Cell     Byahi
 
Project owner
The project is owned by Mr SEBURO
PAUL
 
The plot measures about 2256 m2
and it is bordered by seven plots  on
three of its four sides
 
Project location
 
Neighbourhood
context
The project is located in an area
with new developments as well as
others that have been there for
long time ago.
 
 
NEIGBHOURING PLOTS
- South : plot 1574,1962,1960
- North : plot 1572
- East : plot 1576
- West : road
 
 
 
 
 
 
 
 
Project location
 
1
 
2
 
5
 
6
 
Project analysis
Level                           Usage                     Area (m
2
)
Ground floor                                       Apartment unit                                        200
First floor                                            Apartment units                                       200
 
TOTAL                                                                                         400
 
 
At maximum Capacity, the Project shall hold  16 persons
Number floors: 2 FLOORS
Plot area : 2256 sqm
Total floor area  : 400 sqm
Number of parking  : 4
 
 
 
 
 
 
 
 
 
 
 
 
Interior architectural comments
1. There are some rooms accessing to the
natural Light and fresh air through the porch.
And the window are opened  by sliding system.
 
3. The fire escape stair has an exit door on the
ground floor.
OBJECTIVES OF THE PROJECT
The main objective of the
project is the Construction
and operation of an urban
and modern apartment
building, which provides a
variety of high quality
apartment units and
habitation.
 
 
 
COMPLIANCE WITH ENVIRONMENTAL
LAWS
 
Environmental regulations and
Project magnitude according to environmental laws:
Ministerial order N°004/2008 of 15/08/2008 establishing the list of
works, activities and projects that have to undertake an environmental
impact assessment:
Article 2
 and the appendix of this Order specify the works, activities and
projects that have to undertake an environmental impact assessment.
The present project is not classified among construction of large public
buildings which hold more than a hundred people per day. Therefore, the
EIA is not mandatory for this 2 stories apartment building project since it
will hold only
 16 persons
 
at maximum Capacity.
TARGET GROUP
The target customers for the apartment are
the people or temporary visitors) who don't
need small apartment and have to stay long
time. There are currently very few  in Gisenyi
offering good accommodation for them.
 For example we think of the people coming from
board RDC,staff of Airport  and people in need
of location of apartment etc...
RENTABILITY OF
THE PROJECT
The apartment facilities and rentable residential
houses business has recently experienced
rapid growth.
The developer wants to establish a large regular
customer base, and will therefore concentrate
his business on local people who needs
rentable habitation facilities. In addition,
International clients are also expected to the
less extent.
The project shall offer apartment
facility of high quality. The building
will be internally finished with high
quality materials and equipped with
good furniture. The project shall
cater to all of its customers by
providing each customer all the
related services like water electricity,
etc at all the times to suit customer
down to the smallest detail.
ACCESS TO
INFRASTRUCTURES
Water Supply / Sanitation
The main water supply in settlements surrounding the study area is from the
network managed by WASAC. Like the most of RUBAVU, the project area
does not have a centralized sewerage network. The secondary water
supply will be from the RC under ground water tank and plastic tank on
roof slab.
 
Power Supply
Like the existing houses the project has a direct connection to the national
electricity grid managed by REG. It will be supported by a owner’s standby
generator in case of power cut off.
 
Access road
 The project has three access to the road and enough parking space for
customers and visitors.
 
Location on Aerial Image
 
LOCATION 1573
LOCATION 1573
Slide Note
Embed
Share

West Campus offers a variety of science electives with specific prerequisites to meet. Students must complete Biology and Chemistry courses before enrolling in these electives. The AP Biology, AP Chemistry, and AP Environmental Science courses each have their own requirements and descriptions, providing students with in-depth knowledge and hands-on experience in different areas of science.

  • Science
  • Electives
  • Course Prerequisites
  • AP Biology
  • AP Chemistry

Uploaded on Mar 04, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Construction of Apartments Building at Gisenyi Plot No 1573 Gisenyi/ Rubavu Client : Mr. SEBURO PAUL Project Brief Prepared by : COBATOP Company Date : SEPTEMBRE 2017

  2. PERSPECTIVE VIEWS

  3. PROJECT BACKGROUND Project Location The project will be located in Gisenyi right in front of catholic church of Muhato Western Province District : Rubavu Sector : Rubavu Cell Byahi Project owner The project is owned by Mr SEBURO PAUL Project location The plot measures about 2256 m2 and it is bordered by seven plots on three of its four sides Google images showing project location

  4. Project location Neighbourhood context The project is located in an area with new developments as well as others that have been there for long time ago. NEIGBHOURING PLOTS - South : plot 1574,1962,1960 - North : plot 1572 - East : plot 1576 - West : road 1 2 5 6

  5. Project analysis Level Usage Area (m2) Ground floor Apartment unit 200 First floor Apartment units 200 TOTAL 400 At maximum Capacity, the Project shall hold 16 persons Number floors: 2 FLOORS Plot area : 2256 sqm Total floor area : 400 sqm Number of parking : 4

  6. Interior architectural comments 1. There are some rooms accessing to the natural Light and fresh air through the porch. And the window are opened by sliding system. 3. The fire escape stair has an exit door on the ground floor.

  7. OBJECTIVES OF THE PROJECT The main objective of the project is the Construction and operation of an urban and modern apartment building, which provides a variety of high quality apartment units and habitation. MAIN OBJECTIVE

  8. SPECIFIC OBJECTIVES -Providing enough apartment facilities (apartment units.) -Supporting the need for modern infrastructure in Rwanda; -Job creation for people that will be employed by the project; -Increasing revenues and investments of the owner.

  9. COMPLIANCE WITH ENVIRONMENTAL LAWS Environmental regulations and Project magnitude according to environmental laws: Ministerial order N 004/2008 of 15/08/2008 establishing the list of works, activities and projects that have to undertake an environmental impact assessment: Article 2 and the appendix of this Order specify the works, activities and projects that have to undertake an environmental impact assessment. The present project is not classified among construction of large public buildings which hold more than a hundred people per day. Therefore, the EIA is not mandatory for this 2 stories apartment building project since it will hold only 16 personsat maximum Capacity.

  10. TARGET GROUP The target customers for the apartment are the people or temporary visitors) who don't need small apartment and have to stay long time. There are currently very few in Gisenyi offering good accommodation for them. For example we think of the people coming from board RDC,staff of Airport and people in need of location of apartment etc...

  11. RENTABILITY OF THE PROJECT The apartment facilities and rentable residential houses business has recently experienced rapid growth. The developer wants to establish a large regular customer base, and will therefore concentrate his business on local people who needs rentable habitation facilities. In addition, International clients are also expected to the less extent.

  12. Service delivery The project shall offer apartment facility of high quality. The building will be internally finished with high quality materials and equipped with good furniture. The project shall cater to all of its customers by providing each customer all the related services like water electricity, etc at all the times to suit customer down to the smallest detail.

  13. ACCESS TO INFRASTRUCTURES Water Supply / Sanitation The main water supply in settlements surrounding the study area is from the network managed by WASAC. Like the most of RUBAVU, the project area does not have a centralized sewerage network. The secondary water supply will be from the RC under ground water tank and plastic tank on roof slab. Power Supply Like the existing houses the project has a direct connection to the national electricity grid managed by REG. It will be supported by a owner s standby generator in case of power cut off. Access road The project has three access to the road and enough parking space for customers and visitors.

  14. Location on Aerial Image LOCATION 1573