NTNU SmallSat Lab Management Meeting Overview and Project Updates

Slide Note
Embed
Share

Presentation of status, budgets, and projects at the NTNU SmallSat Lab Management Meeting, including recruitment, proposal discussions, and infrastructure updates. Issues related to missions, procurement, publications, and student projects were also covered.


Uploaded on Aug 01, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. NTNU SmallSat Lab Management Meeting Overview, status, projects, budgets, recruitment (10 min); Tor Arne summarizes status with help from all Organization, roles, decision-making, communication (10 min); Evelyn presents a proposal based on kick-off. HSI mission (25 min); Evelyn and Mariusz presents status and issues to be discussed. SDR mission (10 min); Torbj rn summarizes status and presents issues to be discussed. Procurement of lab and cubesats (10 min); Evelyn and Mariusz presents status and issues to be discussed. Publications, dissemination, outreach (10 min); Plans to be discussed. Student projects and NUTS (10 min); We should agree on a process to involve students (master projects) and NUTS resources. Twin systems engineering professorships (5 min); Recruitment.

  2. NFR infrastruktur: Autonome Dynamiske Intelligente Observasjonssystemer for Havrommet (ADIOS) 200 MNOK 12 MNOK EJC w/ U. Porto og U. Vigo Digital transformation application, 6 PhDs, ice & ocean surveillance 15 MNOK SO PhD6: Arctic surveillance (T. Ekman, E. Eide) 2.5 MNOK SO PhD5: Remote sensing (T. A. Johansen) 2.5 MNOK IKT+ PhD2: Communications (T. Ekman) 3 MNOK IKT+ PhD1: AI and mission management (K. Rajan) 3 MNOK IKT+ Postdoc: Concept and systems 2 MNOK IKT+ Engineer: Systems engineering IKT+: Operating costs and consumables 2 MNOK 5 MNOK IKT+ Pre-project 0.5 MNOK AMOS, smallsat equipment, consumables, operating costs 7 MNOK 9 MNOK AMOS, 3 PhD/postdoc, NN 3-6 MNOK AMOS, 1-2 PhD, T. A. Johansen SO PhD4: Radar Altimetry Concept (H. Nahavandchi) 2.5 MNOK SO PhD3: HSI precise pointing (T. Gravdahl) 2.5 MNOK AMOS PhD: Oceanographic observations (T. A. Johansen) 3 MNOK SO PhD2: Rapid mission engineering/integration (E. Eide) 2.5 MNOK SO PhD1: Broad-band SDR for small satellites (T. Ekman) NSC: Pre-project Postdoc: Milica Orlandic PhD: Jo o Fortuna PhD: Roger Birkeland Postdoc: David Palma 2.5 MNOK NSC: Pre-project 0.7 MNOK 2020 2021 2019 2017 2018

  3. MASSIVE (NFR IKTPLUSS project) Recruitment PhD AI: Alberto Dallolio, start in June, (main supervisor Kanna Rajan) PhD remote sensing: Elizabeth Prentice, start in May, (main supervisor Tor Arne Johansen) PhD radio communications: ?? (main supervisor Torbj rn Ekman) Postdoc: In discussion with Roger B. Other main budget items 2 person-years of researcher/engineer Operating budget (4.9 MNOK) Equipment, spacecraft, launch, testing, consultants Travel Other items Science board Meetings

  4. Total budget for lab and operations AVIT (Egil); 4 MNOK Lab area and equipment Gound station Flatsat MASSIVE Up to 4.9 MNOK AMOS 0.5 MNOK in 2018 6.5 MNOK for 2019-2022; to be confirmed We would likely need/want more!

  5. Publications, dissemination, outreach Publication plans How to ensure all PhDs get results they need? Strategic (joint) publications Web-pages; should we provide more info there? Official annoucement of program; Teknisk Ukeblad (Tor Arne) Ocean Week (Evelyn) Joint outreach program with NAROM/And ya (Tor Arne) +++

More Related Content