Demonstration of WIPPS Rolling Review of Requirements - Infrastructure Commission Session

I
t
e
m
 
8
.
4
(
4
)
 
 
D
e
m
o
n
s
t
r
a
t
i
o
n
 
o
f
 
W
I
P
P
S
 
R
o
l
l
i
n
g
R
e
v
i
e
w
 
o
f
 
R
e
q
u
i
r
e
m
e
n
t
s
Third Session of the Infrastructure Commission
(INFCOM-3, 15-19 April 2024)
David RICHARDSON / Chair SC-ESMP
17 April 2024
 
Doc 8.4(4) Draft Decision: Demonstration of WIPPS Rolling
Review of Requirements
The purpose is to provide a systematic
and transparent process to support
the high-level design and evolution of
WIPPS.
The RRR process compiles information
on Members’ evolving requirements on
analyses and predictions.
Demonstration till INFCOM-4
Collaborate with SERCOM
Test and elaborate the process
Propose the final process to INFCOM-4
S
e
e
 
m
o
r
e
 
d
e
t
a
i
l
 
-
 
I
N
F
 
8
.
4
(
4
)
 
W
I
P
P
S
 
R
o
l
l
i
n
g
R
e
v
i
e
w
 
o
f
 
R
e
q
u
i
r
e
m
e
n
t
s
WIPPS RRR
WIPPS RRR
 
Doc 8.4(4) Draft Decision: Demonstration of WIPPS
Rolling Review of Requirements
T
h
a
n
k
 
y
o
u
.
wmo.int
Slide Note
Embed
Share

The demonstration of WIPPS Rolling Review of Requirements during the third session of the Infrastructure Commission aims to establish a systematic and transparent process supporting the high-level design and evolution of WIPPS. It involves reviewing user requirements, providing high-level guidance, conducting gap analysis, and more to refine the process for INFCOM-4 collaboration.

  • Requirements review
  • WIPPS
  • Infrastructure Commission
  • High-level design
  • INFCOM-4

Uploaded on Sep 09, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Item 8.4(4) Demonstration of WIPPS Rolling Review of Requirements Third Session of the Infrastructure Commission (INFCOM-3, 15-19 April 2024) David RICHARDSON / Chair SC-ESMP 17 April 2024

  2. Doc 8.4(4) Draft Decision: Demonstration of WIPPS Rolling Review of Requirements The purpose is to provide a systematic and transparent process to support the high-level design and evolution of WIPPS. The RRR process compiles information on Members evolving requirements on analyses and predictions. Demonstration till INFCOM-4 Collaborate with SERCOM Test and elaborate the process Propose the final process to INFCOM-4 WIPPS RRR See more detail - INF 8.4(4) WIPPS Rolling Review of Requirements

  3. Doc 8.4(4) Draft Decision: Demonstration of WIPPS Rolling Review of Requirements STEP 1 STEP 2 STEP 3 STEP 4 Review of User Requirements for analyses and predictions High-level Guidance for Evolution of WIPPS Statements of Guidance (SoG) Gap Analysis by SC-ESMP in consultation with Requirement Owner by INFCOM by Requirement Owner in consultation with user community by SC-ESMP Update Develop Develop Develop User Requirement Database Gap Analysis Report Statements of Guidance High-level Guidance

  4. Thank you. wmo.int

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#