Protodune commissioning - PowerPoint PPT Presentation


OBSERVERS’ BRIEFING

Advanced encryption techniques, stringent manufacturing processes, and administrative safeguards are in place to ensure the security and integrity of electronic voting machines. Observers play a crucial role in overseeing EVM/VVPAT checks, commissioning processes, and ensuring transparency throughou

0 views • 16 slides


Lewisham:Proposed structure

The organizational structure in Lewisham outlines key positions such as Executive Lead, Director of System Development, and Director of Adult Integrated Commissioning. Various roles within the structure include Adult Safeguarding Designate, System Development Manager, and Mental Health Assistant Dir

0 views • 6 slides



Rapid Review of BSL Commissioning Arrangements by Dr. Michael Brady

NECS commissioned a Rapid Review of British Sign Language (BSL) service provision to identify areas for improvement in access and patient experience, especially during the Covid-19 pandemic. The review focused on stakeholder engagement, options appraisal for commissioning responsibility, and recomme

9 views • 19 slides


ACT Health Commissioning Community Sector Update - August 2, 2023

Join the Health System Planning and Evaluation team for the ACT Health Commissioning Community Sector Update on August 2, 2023. The session aims to discuss and showcase health sector reform activities, focus on community health services commissioning, and explore opportunities for quality developmen

5 views • 31 slides


Introducing the Provider Selection Regime (PSR) in Health Care Services

The Provider Selection Regime (PSR) is a new set of rules under the Health and Care Act 2022 for procuring health care services in England. It aims to promote greater integration of health and care services by removing them from the scope of previous regulations. Relevant authorities like NHS Englan

1 views • 13 slides


Python Library for Simulated Commissioning of Synchrotrons Accelerator Toolbox Workshop

This workshop presented by Lukas Malina introduces a Python library for simulated commissioning of synchrotrons, focusing on commissioning simulations using AI translation from Matlab. The Python library aims to replicate machines with random errors, provide correction methods, and enhance performan

0 views • 15 slides


ERCOT Resource Integration Updates - Planning and Submission Guidelines

Stay updated with important ERCOT resource integration topics including Quarterly Stability Assessment (QSA) guidelines, commissioning checklist submissions, dynamic model reviews, and more for efficient planning and compliance. Ensure timely submission and adherence to requirements outlined by ERCO

0 views • 15 slides


Effective Strategies for Co-Production in Commissioning Process

Commissioning involves needs assessment, analysis, design planning, procurement, delivery, monitoring, and evaluation. Effective commissioning is person-centered, outcome-focused, inclusive, well-led, and promotes a diverse and sustainable market. Meeting needs through co-production is essential, in

0 views • 12 slides


JSC Sibtechenergo: Engineering Company Specializing in Power Equipment Operations

JSC Sibtechenergo is an engineering company with a rich history in setting up, improving, and managing electro & power equipment for enterprises. Established in Novosibirsk in 1955, the company offers a range of services including commissioning work, engineering services, design engineering, and inn

0 views • 19 slides


Understanding Primary Care Networks in Harrogate

Primary Care Networks (PCNs) play a crucial role in reshaping healthcare services in the NHS, focusing on out-of-hospital care and closer collaboration between different services. In Harrogate, the local Clinical Commissioning Group (CCG) has endorsed 4 PCNs covering the entire GP registered populat

0 views • 11 slides


Interlock Actions and Matrix for DSS Server in SR1 Environment

Proposal and implementation plan for interlock actions and matrix coordination between DSS server rack and user areas in SR1. Includes agreements, alarms-actions matrix finalization, cable routing, server installation, and commissioning with dummy loads. Discusses CO2 plant signals, temperature moni

3 views • 7 slides


Specific Controls Requirements for p-Linac at GSI Helmholtzzentrum

Explore the specific control requirements for the p-Linac at GSI Helmholtzzentrum, including detailed information on beam energy, design current, RF power, and related devices. Get insights into the overall design, main devices, FAIR primary beam chain, booster operation, and parallel operation exam

0 views • 13 slides


ERCOT Resource Integration Work Group Updates

The ERCOT Resource Integration Working Group discusses delays in commissioning resources, including challenges with supply chains and equipment damage. Various scenarios are presented, such as partial commissioning requests and requirements for unit approvals. The document outlines procedures for ap

0 views • 11 slides


North Central London Integrated Care System Overview

The North Central London Integrated Care System (ICS) is a collaborative approach to healthcare planning and delivery across five boroughs. Led by the North Central London Health and Care Partnership, the ICS aims to meet the diverse health, public health, and social care needs of the region through

0 views • 29 slides


Understanding Commissioning Zones and Safety Procedures

In the commissioning phase of a project, it is crucial to establish clear commissioning zones to distinguish between construction and commissioning areas. Blue and white flagging, boundary isolations, and permits play key roles in ensuring the safety and controlled energization of circuits and equip

0 views • 12 slides


Interconnection Discussion Forum Timeline Review - 01/16/18

Interconnection Discussion Forum held on 01/16/18 discussed safety measures, meeting objectives, and timeline objectives. The agenda covered topics like submitting applications, engineering reviews, design, construction, and commissioning. Safety protocols for emergencies like earthquake and evacuat

0 views • 14 slides


Surrogacy Laws in England: A Comprehensive Overview

England has been at the forefront of surrogacy legislation, with the Surrogacy Arrangements Act of 1985 and the Human Fertilisation and Embryology Act of 2008 establishing frameworks for surrogacy. Commercial surrogacy is scrutinized to ensure the welfare of the child is prioritized. The laws requir

0 views • 8 slides


NHS Continuing Healthcare Strategic Improvement Programme Overview

The NHS Continuing Healthcare Strategic Improvement Programme aims to enhance efficiency and transformation within the healthcare system. It focuses on improving access, resource utilization, outcomes, and patient experiences. Key objectives include reducing variation, establishing national standard

0 views • 6 slides


Organizational Structure and Roles at North Yorkshire CCG - June 2021

The organizational structure of North Yorkshire CCG in June 2021 includes various key positions like Director of Acute Commissioning, Deputy Director, Clinical Leads, and Service Improvement Managers. Vacancies exist in several roles, with details provided on confirmed new posts and joint-funded sec

0 views • 15 slides


Safety Readiness Review of Ion Source & LEBT Commissioning Process

Safety Readiness Review (SRR) is crucial for the commissioning and operation of the Ion Source and Low Energy Beam Transport (LEBT) system. The review ensures safety across all aspects, including radiation and environmental safety. The commissioning process is scheduled to begin on September 3rd, 20

0 views • 7 slides


Advancements in Signal Processing for ProtoDUNE Experiment

The team, including Xin Qian, Chao Zhang, and Brett Viren from BNL, leverages past experience in MicroBooNE to outline a comprehensive work plan for signal processing in ProtoDUNE. Their focus includes managing excess noise, addressing non-functional channels, and evolving signal processing techniqu

1 views • 23 slides


LSST Commissioning Review: Camera Summit Reverification and Hazards

In preparation for the LSST Commissioning Review in Tucson, the Camera Summit Reverification process led by Travis Lange, an I&T Engineer, involves re-assembling the camera and re-verifying requirements. The schedule, budget, risks, and hazards are outlined, including inherited risks from the I&T ph

1 views • 35 slides


Progress Update on VUV Divertor Spectrometer Installation and Commissioning

The project status for the VUV divertor spectrometer installation and commissioning is progressing well. The main components include collecting mirrors, toroidal mirrors, and gratings. The design is nearing completion with adjustments being made to the sustaining structure, mirrors, and periscope. T

0 views • 8 slides


Analysis of Beam Commissioning and Tune Evolution in 2015

This study analyzes the tune variation during beam commissioning in 2015 at the Large Hadron Collider. It includes comparisons of beam fills, bare tune analysis, evolution, and differences between beams 1 and 2. The research delves into the behavior of tune parameters, energy models, and the accurac

0 views • 9 slides


Planning for Commissioning Experts Exchange Program

Initiating discussions on inviting experts from LIGO-Virgo Collaboration to assist with commissioning activities at KAGRA. Budget sources and possible programs identified. Key considerations include determining who to invite, when, and how to apply for the exchange program. Past experiences with Vir

0 views • 6 slides


Update on O3 LIGO-Virgo-KAGRA Project and Commissioning Plan Milestones

Updates on the O3 LIGO-Virgo-KAGRA project, including detector performance, alerts, retractions, and the upcoming commissioning break. The status and milestones of KAGRA commissioning plan are also outlined, with details on noise hunting, beam alignment, cooling systems, and other key activities.

0 views • 8 slides


Understanding Commissioning Process and Youth Engagement

This content covers training on commissioning processes, aims to involve young people in decision-making, and highlights the importance of effective communication and problem-solving skills. Various activities like ice breakers and group agreements are explored to engage participants in understandin

0 views • 22 slides


Enhancing Community Justice Through Strategic Commissioning Workshop

Explore the realm of community justice through strategic commissioning, focusing on preventing re-offending, rehabilitation, and reintegration. Discover the collaborative efforts of various partners in developing effective services to meet long-term needs and improve transitions for individuals invo

0 views • 12 slides


Community Commissioning Collaborative Design Workshop - August 9th

The Community Commissioning Collaborative Design Workshop on August 9th focuses on sexually transmissible infections and blood-borne viruses public health regulation. The workshop includes sessions on health services commissioning, viral hepatitis, and HIV, aiming to address emerging needs and prior

0 views • 7 slides


Norfolk & Waveney CYPMH Transformation School Forum Meeting - 12th March

The Integrated CYP MH Commissioning Team in Norfolk and Waveney is focused on transforming and commissioning services for children and young people's mental health. Their priorities include meeting national standards, reducing waiting times, enhancing workforce development, and involving families in

0 views • 12 slides


Comparison of Approaches in Health and Social Care Commissioning

This content describes the different approaches - Separate, Parallel, Joint, and Integrated - in areas such as analysis, planning, delivery, and review within health and social care commissioning. It outlines how entities can progress from independent actions to collaborative efforts, showcasing the

0 views • 4 slides


Pre-Commissioning and Commissioning Activities Overview

Understanding the process of pre-commissioning and commissioning in a treatment unit to ensure all systems are operational and ready for use. Learn about the activities involved, from preparation to treatment processes, including primary and secondary treatments. Explore the key steps such as inocul

0 views • 13 slides


Commissioning Services for People with Lived Experience in Alcohol and Other Drug Policy Workshop

The workshop, led by the Alcohol and Other Drug Policy team at ACT Health, focuses on engaging with people with lived experience and peer representatives to inform the commissioning of non-government AOD services. Sessions aim to gather insights on current treatment services, areas for improvement,

0 views • 28 slides


Commissioning Services for Women and Families in ACT: AOD Policy Workshop

Workshop on commissioning services to meet the needs of women and families in the ACT, focusing on key areas like young people, lived experience, AOD, and mental health. The session aims to inform the approach to non-government AOD services from 2024 and seeks collaboration with stakeholders. The Co

0 views • 25 slides


Comprehensive Review of TDR Plan and Schedule for LBNC Concerns

The TDR plan and schedule, as reviewed on December 8, 2018, includes addressing key IDR issues, updating with ProtoDUNE information, and incorporating project-level details. LBNC's concerns focus on requirements, length, and structure modifications like breaking TDR and CDRs into standalone volumes

0 views • 14 slides


Understanding the National Commissioning Board

The National Commissioning Board plays a crucial role in enhancing our understanding of integrated commissioning and the foundations of integrated services. This board aims to address challenges faced by regional partnership boards and focuses on analyzing approaches to commissioning across agencies

0 views • 13 slides


Development Updates for ProtoDUNE Phase II: CRP Modifications and Testing

Updates on the development of Charged Readout Plane (CRP) for ProtoDUNE Phase II driven by lessons from commissioning and operation in ProtoDUNE-DP. Major topics include modifications for CRP mechanical structure, new LEM development, cold box improvements, and testing plans. Detailed steps per syst

0 views • 7 slides


Latest Updates on CNAO XPR Status for FOOT Collaboration Meeting

The CNAO XPR status update for the FOOT Collaboration Meeting on 04/12/2019 includes information on beam commissioning, DDS commissioning, room environment upgrades, and upcoming installation schedules. Beam optics have been commissioned for proton and carbon ion energies, with all beams ready for u

0 views • 5 slides


Health Commissioning Transitions Implementation Model Overview

The Health Commissioning Transitions Implementation Model aims to streamline the transition process for service providers in the ACT government's health sector. The model outlines clear timelines, expectations, and procedures for both Preferred and Non-Preferred Respondents, ensuring a smooth and ef

0 views • 8 slides


Review of Long-Baseline Neutrino Facility Cryogenics Performance and Recommendations

The review of cryogenics performance at the Long-Baseline Neutrino Facility highlighted the priority given to cryogenics testing on ProtoDUNE. The comprehensive commissioning plan includes testing of the cryostat, cryogenics, and detectors, with a focus on data collection and simulation validation.

0 views • 18 slides