Latest Updates on CNAO XPR Status for FOOT Collaboration Meeting
The CNAO XPR status update for the FOOT Collaboration Meeting on 04/12/2019 includes information on beam commissioning, DDS commissioning, room environment upgrades, and upcoming installation schedules. Beam optics have been commissioned for proton and carbon ion energies, with all beams ready for use. DDS code has been adapted for XPR with scanning magnets operational. Tenders for UTA and water piping installations are in the final phase. Room environment improvements are scheduled for completion by specified dates. Detailed progress updates are provided for various components essential for treatment deliveries.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
CNAO XPR Status Pavia, 04/12/2019 for FOOT Collaboration Meeting
www.cnao.it XPR layout Page 2 CNAO XPR Status for FOOT Collaboration Meeting (04/12/2019)
www.cnao.it Beam commissioning Beam optics has been commissioned for: proton and carbon ion all energies all isocenters Beam characteristics very similar for all ISOs. All beams are ready to be used. Measurements performed with QA strip chamber. XPR line selection has been included in main control room tools. Tools for treatment delivery at XPR are under test (next week). Page 3 CNAO XPR Status for FOOT Collaboration Meeting (04/12/2019)
www.cnao.it DDS commissioning DDS code has been adapted for XPR maintaning the same functionalities of clinical DDS. DDS has been included in the control system. Scanning magnet are operational. DDS is a movable device and it has been placed at three nozzle positions. The moving table is missing (arrival foreseen in few days). The alignment and DDS installation is due by the end of the year. DDS calibration for treatment deliveries due by the end of January. Page 4 CNAO XPR Status for FOOT Collaboration Meeting (04/12/2019)
www.cnao.it Room environment Tenders for UTA are in the final phase. Contract signed by the end of the year. Installation due by the end of May. Tenders for water piping are in the final phase. Contract signed by the end of the year. Installation due by the end of March. Untill UTA has been installed: very noisy environment room termally instable Page 5 CNAO XPR Status for FOOT Collaboration Meeting (04/12/2019)