Beam commissioning - PowerPoint PPT Presentation


Rapid Review of BSL Commissioning Arrangements by Dr. Michael Brady

NECS commissioned a Rapid Review of British Sign Language (BSL) service provision to identify areas for improvement in access and patient experience, especially during the Covid-19 pandemic. The review focused on stakeholder engagement, options appraisal for commissioning responsibility, and recomme

9 views • 19 slides


ACT Health Commissioning Community Sector Update - August 2, 2023

Join the Health System Planning and Evaluation team for the ACT Health Commissioning Community Sector Update on August 2, 2023. The session aims to discuss and showcase health sector reform activities, focus on community health services commissioning, and explore opportunities for quality developmen

5 views • 31 slides



Python Library for Simulated Commissioning of Synchrotrons Accelerator Toolbox Workshop

This workshop presented by Lukas Malina introduces a Python library for simulated commissioning of synchrotrons, focusing on commissioning simulations using AI translation from Matlab. The Python library aims to replicate machines with random errors, provide correction methods, and enhance performan

0 views • 15 slides


Effective Strategies for Co-Production in Commissioning Process

Commissioning involves needs assessment, analysis, design planning, procurement, delivery, monitoring, and evaluation. Effective commissioning is person-centered, outcome-focused, inclusive, well-led, and promotes a diverse and sustainable market. Meeting needs through co-production is essential, in

0 views • 12 slides


ERCOT Resource Integration Work Group Updates

The ERCOT Resource Integration Working Group discusses delays in commissioning resources, including challenges with supply chains and equipment damage. Various scenarios are presented, such as partial commissioning requests and requirements for unit approvals. The document outlines procedures for ap

0 views • 11 slides


Understanding Commissioning Zones and Safety Procedures

In the commissioning phase of a project, it is crucial to establish clear commissioning zones to distinguish between construction and commissioning areas. Blue and white flagging, boundary isolations, and permits play key roles in ensuring the safety and controlled energization of circuits and equip

0 views • 12 slides


Understanding the Conjugate Beam Method in Structural Analysis

The Conjugate Beam Method is a powerful technique in structural engineering, derived from moment-area theorems and statical procedures. By applying an equivalent load magnitude to the beam, the method allows for the analysis of deflections and rotations in a more straightforward manner. This article

0 views • 11 slides


Beam Deflection and Integration Method in Mechanics of Materials

Understanding beam deflection through integration method involves analyzing relationships between moment, deflection, slope, and shear in a beam structure. By integrating the moment equation under certain assumptions and boundary conditions, engineers can determine deflections and solve for constant

0 views • 12 slides


Innovative Structured Laser Beam Technology for Improved Beam Propagation

An overview of a novel structured laser beam (SLB) system designed for long-distance propagation with low divergence and a small central spot size. This cost-effective method allows for easy adjustment of beam parameters and offers advantages such as self-reconstruction after obstacles, compact spot

0 views • 9 slides


Safety Readiness Review of Ion Source & LEBT Commissioning Process

Safety Readiness Review (SRR) is crucial for the commissioning and operation of the Ion Source and Low Energy Beam Transport (LEBT) system. The review ensures safety across all aspects, including radiation and environmental safety. The commissioning process is scheduled to begin on September 3rd, 20

0 views • 7 slides


Analysis of Multipole Error Effects on Beam Dynamics in CEPC Accelerator

The content discusses the impact of multipole errors on the beam dynamics at the CEPC Accelerator, focusing on sources of error, measurements, and potential effects on the beam. The analysis includes different types of multipole errors, their sources, and the resulting changes in tune and emittance

4 views • 11 slides


Correlated Head-Tail Instability in Beam-Beam Collisions

The study discusses the impact of the cross wake force and correlated head-tail instability in collisions with a large crossing angle. It delves into the mechanism of beam-beam instability, cross wake force induction, mode coupling, and particle tracking simulations. Design parameters and instabilit

0 views • 34 slides


Analysis of Beam Commissioning and Tune Evolution in 2015

This study analyzes the tune variation during beam commissioning in 2015 at the Large Hadron Collider. It includes comparisons of beam fills, bare tune analysis, evolution, and differences between beams 1 and 2. The research delves into the behavior of tune parameters, energy models, and the accurac

0 views • 9 slides


Agreements on FR2 Inter-Band Carrier Aggregation Requirements

Agreements have been reached on the RRM requirements and scaling factors for FR2 inter-band Carrier Aggregation, focusing on common beam and independent beam management. Discussions include alignment with Release 16 specifications, scenarios, and RF architectures. Interruption requirements for diffe

0 views • 8 slides


Planning for Commissioning Experts Exchange Program

Initiating discussions on inviting experts from LIGO-Virgo Collaboration to assist with commissioning activities at KAGRA. Budget sources and possible programs identified. Key considerations include determining who to invite, when, and how to apply for the exchange program. Past experiences with Vir

0 views • 6 slides


Update on O3 LIGO-Virgo-KAGRA Project and Commissioning Plan Milestones

Updates on the O3 LIGO-Virgo-KAGRA project, including detector performance, alerts, retractions, and the upcoming commissioning break. The status and milestones of KAGRA commissioning plan are also outlined, with details on noise hunting, beam alignment, cooling systems, and other key activities.

0 views • 8 slides


Understanding Commissioning Process and Youth Engagement

This content covers training on commissioning processes, aims to involve young people in decision-making, and highlights the importance of effective communication and problem-solving skills. Various activities like ice breakers and group agreements are explored to engage participants in understandin

0 views • 22 slides


Community Commissioning Collaborative Design Workshop - August 9th

The Community Commissioning Collaborative Design Workshop on August 9th focuses on sexually transmissible infections and blood-borne viruses public health regulation. The workshop includes sessions on health services commissioning, viral hepatitis, and HIV, aiming to address emerging needs and prior

0 views • 7 slides


Critical Issues in CLIC Drive Beam by Working Group 6 at LCWS11

Issues identified in the CLIC Drive Beam project include RF stability and reliability, beam current stability, RF deflectors in combiner rings, synchrotron radiation power, beam dynamics, operability concerns, machine protection, and beam synchronization challenges. Key areas requiring attention inc

0 views • 5 slides


Beam-beam Effects in Future Hadron Colliders Workshop

Explore the beam-beam effects in the SPPC and future hadron colliders, presented at the International Workshop on High Energy Circular Electron-Positron Colliders. The workshop covers weak-strong beam-beam simulations, collision models, and parameter values for the SPPC. Detailed discussions on the

0 views • 32 slides


Analysis of Beam Tracking in IEEE 802.11-19/0007r0 Document

The document "January 2019.doc: IEEE 802.11-19/0007r0" discusses the necessity of beam tracking in the 11md draft. It explores whether beam tracking should be mandatory or optional and provides insights into DMG beam tracking procedures for both TX and RX in wireless communication. The document emph

0 views • 11 slides


Revolutionizing Oral Care with Beam Connected Toothbrush and Insurance Plan

Beam Technologies offers the Beam Brush, a smart toothbrush that integrates with a dental insurance plan to promote preventative oral care, reduce costs, and provide valuable insights on oral health. The Beam Brush and accompanying app track and reward good oral hygiene habits, detect oral diseases,

0 views • 5 slides


Advanced Beam Diagnostics and Control Systems in Beam Physics

Cutting-edge detector technologies like KAPTURE and KALYPSO are revolutionizing beam diagnostics with ultra-fast Terahertz detectors and advanced line-camera systems. The POF III and POF IV projects focus on extreme beam control and diagnostics, aiming to probe femto-scale dynamics of relativistic p

0 views • 8 slides


Overview of Electron/Positron Injector Linac Upgrades at KEK

The recent status of the Electron/Positron Injector Linac at KEK, presented by Kazuro Furukawa, highlights the mission to achieve 40 times higher luminosity in the SuperKEKB collider. The upgrades include low emittance, low energy spread injection beams with higher beam current, new high-current pho

0 views • 23 slides


Pre-Commissioning and Commissioning Activities Overview

Understanding the process of pre-commissioning and commissioning in a treatment unit to ensure all systems are operational and ready for use. Learn about the activities involved, from preparation to treatment processes, including primary and secondary treatments. Explore the key steps such as inocul

0 views • 13 slides


Ion Beam Intensity Enhancement Through Electron Heating in Collider Experiments

The study discusses electron heating of ions in collider experiments at the Collider V. ParkhomchukBINP facility in Novosibirsk. It explores the effects of electron cooling on ion beams, ion beam oscillations, losses, and ion beam intensity enhancement. Various factors such as ion charge, classical

0 views • 9 slides


Highlights of the 65th ICFA Advanced Beam Dynamics Workshop

The 65th ICFA Advanced Beam Dynamics Workshop featured insightful presentations on high currents, luminosity, and beam behaviors. Topics included beam pipe scrubbing, non-gaussian beam tails, and detector backgrounds. Presenters discussed progress in FCCee design, focus magnets, and beampipe concept

0 views • 32 slides


Commissioning Services for Women and Families in ACT: AOD Policy Workshop

Workshop on commissioning services to meet the needs of women and families in the ACT, focusing on key areas like young people, lived experience, AOD, and mental health. The session aims to inform the approach to non-government AOD services from 2024 and seeks collaboration with stakeholders. The Co

0 views • 25 slides


Achieving High Average Beam Polarization in Particle Colliders

Detailed discussion on achieving high average beam polarization in particle colliders like CEPC, focusing on longitudinal polarized colliding beams, beam polarization requirements, basic formulas, and strategies for maintaining beam polarization during physics runs. Emphasis on scenarios involving s

0 views • 16 slides


ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation

Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr

0 views • 10 slides


Electron Lenses in Particle Accelerators: Advancements and Applications

Explore the use of electron lenses in particle accelerators for space-charge compensation, Landau damping, halo collimation, and beam-beam compensation. Learn about their history, applications in Tevatron and RHIC colliders, and current research areas. Electron lenses have shown promise in enhancing

0 views • 44 slides


Update on UE Beam Assumption for RRM Test Cases in 3GPP Meetings

The latest developments in 3GPP meetings regarding UE beam assumption for RRM test cases are outlined. Discussions include the need for UE beam type assumptions, updates to test cases for FR2, and upcoming presentations focusing on specific test cases and beam assumptions per test group. Test purpos

0 views • 9 slides


Understanding the National Commissioning Board

The National Commissioning Board plays a crucial role in enhancing our understanding of integrated commissioning and the foundations of integrated services. This board aims to address challenges faced by regional partnership boards and focuses on analyzing approaches to commissioning across agencies

0 views • 13 slides


Latest Updates on CNAO XPR Status for FOOT Collaboration Meeting

The CNAO XPR status update for the FOOT Collaboration Meeting on 04/12/2019 includes information on beam commissioning, DDS commissioning, room environment upgrades, and upcoming installation schedules. Beam optics have been commissioned for proton and carbon ion energies, with all beams ready for u

0 views • 5 slides


Overview of Mu2e Slow Extraction Workshop at Fermilab by Vladimir Nagaslaev

This content discusses the Mu2e project at Fermilab, focusing on slow extraction techniques for beam delivery. It covers beam facilities, characteristics of Muon Campus, design requirements, beam losses, new MARS simulations, and losses in the extraction beam line. Details include beam kinetics, spi

0 views • 17 slides


Overview of CAIN Particle Tracking Code for High-Energy Colliders

CAIN is a particle tracking code used for high-energy collider simulations since 1984. Initially named ABEL, it evolved to include beam-laser interactions for gamma-gamma colliders. The code, written in FORTRAN 90, handles beam-beam and external fields, with a structure where all particles are store

0 views • 17 slides


SHMS Detector Commissioning and Installation Updates

Status updates on the commissioning and installation progress of the SHMS detector system, including the noble gas Cerenkov mount optics, mirrors, drift chambers, and various hodoscopes. Details on the system status, high voltage signal cables, DAQ, gas computing, and schedules for detector installa

0 views • 9 slides


Guide to Collaborative and Engaging Activities for Commissioning

This guide provides insights on collaboration in commissioning, emphasizing transparency, inclusivity, and shared decision-making. It outlines methods for collaborative design, such as co-design, co-production, and incorporating lived experiences. The guide helps in selecting activities that engage

0 views • 12 slides


Electrical Equipment Testing and Commissioning Course at Bapuji Institute

This course at Bapuji Institute of Engineering and Technology in Davangere focuses on testing and commissioning of power system apparatus. It covers planning, controlling, and implementing commissioning processes, as well as performance specifications of electrical equipment like transformers and in

0 views • 12 slides


Design of a 10 MeV Beamline for E-beam Irradiation at UITF Wastewater Facility

This paper discusses the design of a 10 MeV beamline at the Upgraded Injector Test Facility for electron beam irradiation, focusing on wastewater treatment for environmental restoration. The use of electron beam irradiation is highlighted as an effective method to remove pollutants like 1,4 dioxane

0 views • 9 slides