Update on ETT CREZ Outages and Productivity Meeting

undefined
 
2021 Update on ETT CREZ
Outages
 
CMWG Meeting April 19, 2021
 
Kip Fox
President, ETT
 
1
 
Agenda
 
Slide 2
 
1.
Brief Timeline of Winter Storm Uri ETT Outages
2.
Current CREZ Outage Schedule
3.
Current Productivity
4.
Other Discussion Items
5.
Questions
 
 
 
 
Timeline of ETT Asset Outages
All 345kV lines returned to service prior to Feb 11
th
 
Slide 3
 
ERCOT DECLARES
EMERGENCY
OPERATIONS LEVEL 3
 
1
:
2
0
 
a
m
 
Trip:  Clear Crossing –
Dermott (Oncor) 345 kV
 
8
:
0
5
 
a
m
 
(
1
5
 
m
i
n
)
 
11th
 
18th
 
12
th
 & 13th
 
14th
 
15th
 
16th
 
17th
 
Trip:  Lytle – Lytle (CPS)
138 kV CPS outage
 
1
4
t
h
 
1
:
1
7
 
p
m
 
(
1
.
2
 
h
r
s
)
 
Trip:  Hamilton Road SVC2
138 kV
 
1
4
t
h
 
9
:
1
2
 
p
m
 
(
2
.
8
 
d
a
y
s
)
 
Trip:  Barney Davis – Nelson
Sharpe 138 kV
 
1
4
t
h
 
1
0
:
2
2
 
p
m
 
(
1
3
 
h
o
u
r
s
)
 
Trip:  N. Edinburg – Palmito
(Sharyland outage) 345 kV
 
1
4
t
h
 
1
1
:
3
5
 
p
m
 
(
1
3
.
6
 
h
o
u
r
s
)
 
Trip:  Razorback – Castroville
(CPS outage) 138 kV
 
1
5
t
h
 
1
2
:
3
6
 
a
m
 
(
6
.
5
 
h
o
u
r
s
)
 
Trip:  Laredo VFT
(CFE outage)
 
Trip:  Lytle – Lytle (CPS
outage) 138 kV
 
1
6
t
h
 
1
1
:
5
5
 
p
m
 
(
8
.
5
 
h
o
u
r
s
)
 
Trip: Nelson Sharpe –
Santa Cruz 138 kV
 
1
7
t
h
 
1
:
4
4
 
a
m
 
 
(
7
.
7
 
h
o
u
r
s
)
 
Trip: Rocksprings (Pedernales
Interconnection, LCRA and AEP Texas
outages)
 
1
7
t
h
 
1
1
:
2
3
 
 
a
m
 
(
2
.
3
 
d
a
y
s
)
 
Trip: Big Hill – Wilson Ranch
Wind Interconnection
 
1
7
t
h
 
1
1
:
3
9
 
 
a
m
 
(
D
e
v
e
l
o
p
e
r
 
o
u
t
a
g
e
 
w
i
t
h
 
E
T
T
 
s
u
p
p
o
r
t
)
 
Trip:  LCRA Big Hill –
LCRA Kendall
 
1
4
t
h
 
9
:
0
2
 
a
m
 
(
L
C
R
A
)
 
19th
 
AEP WINTER STORM
WARNING THROUGH 12
th
FOR NORTH TEXAS
 
M
i
d
n
i
g
h
t
 
o
n
 
1
0
t
h
 
NORMAL CONDITIONS
 
1
0
:
3
5
 
a
m
 
AEP WINTER STORM
WARNING THROUGH 15
th
FOR ENTIRE ETT TERRITORY
 
M
i
d
n
i
g
h
t
 
1
5
t
h
 
7
:
4
8
 
A
M
 
(
3
.
5
 
d
a
y
s
)
 
AEP WINTER STORM WARNING
THROUGH 18
th
 FOR CENTRAL AND
WEST TEXAS
 
3
:
0
0
 
a
m
 
 
ETT 2021 Budget
 
Slide 4
 
Current Schedule
 
Slide 5
 
CC – Clear Crossing
WS – West Shakelford
EC – Edith Clarke
T – Tesla
 
*Edith Clarke – Clear Crossing outages are bifurcated to allow generation
output during inspections
 
Thanksgiving
 
In-service
 
In-service
 
Current Productivity
 
Slide 6
 
Winter Storm Uri
 
New Year
Break
 
Other Discussion Items
 
2022 and Beyond Tentative Plan
Additional Capacity Efforts
Network upgrades for GTC’s (all economic)
New technology to reduce impedance, congestion,
other issues
Accountability issues to address in Texas
Winterization certification/planning/additional work
Storm quick response performance plan
Transmission line availability (99.95%)
1.00 –[(hours out x miles) / (1852 circuit miles x 8760 hrs)]
 
 
Slide 7
Slide Note
Embed
Share

Presentation of the recent ETT CREZ outages timeline, current productivity status, budget overview, asset outage details, and upcoming plans for additional capacity efforts and network upgrades. Discussions on accountability, winterization, storm response, and transmission line availability.

  • ETT CREZ Outages
  • Productivity
  • Asset Management
  • Winterization Certification
  • Capacity Upgrades

Uploaded on Aug 11, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 2021 Update on ETT CREZ Outages CMWG Meeting April 19, 2021 Kip Fox President, ETT 1

  2. Agenda 1. Brief Timeline of Winter Storm Uri ETT Outages 2. Current CREZ Outage Schedule 3. Current Productivity 4. Other Discussion Items 5. Questions Slide 2

  3. Timeline of ETT Asset Outages All 345kV lines returned to service prior to Feb 11th Midnight on 10th 1:20 am 3:00 am Midnight ERCOT DECLARES EMERGENCY OPERATIONS LEVEL 3 AEP WINTER STORM WARNING THROUGH 12th FOR NORTH TEXAS AEP WINTER STORM WARNING THROUGH 18th FOR CENTRAL AND WEST TEXAS 10:35 am AEP WINTER STORM WARNING THROUGH 15th FOR ENTIRE ETT TERRITORY NORMAL CONDITIONS 11th 12th & 13th 14th 15th 16th 17th 19th 18th 15th 7:48 AM (3.5 days) Trip: Laredo VFT (CFE outage) 8:05 am (15 min) 14th 9:02 am (LCRA) 14th 9:12 pm (2.8 days) 16th 11:55 pm (8.5 hours) Trip: Clear Crossing Dermott (Oncor) 345 kV Trip: LCRA Big Hill LCRA Kendall Trip: Hamilton Road SVC2 138 kV Trip: Lytle Lytle (CPS outage) 138 kV 14th 10:22 pm (13 hours) 17th 1:44 am (7.7 hours) 14th 1:17 pm (1.2 hrs) Trip: Barney Davis Nelson Sharpe 138 kV Trip: Nelson Sharpe Santa Cruz 138 kV Trip: Lytle Lytle (CPS) 138 kV CPS outage 14th 11:35 pm (13.6 hours) 17th 11:23 am (2.3 days) Trip: N. Edinburg Palmito (Sharyland outage) 345 kV Trip: Rocksprings (Pedernales Interconnection, LCRA and AEP Texas outages) 15th 12:36 am (6.5 hours) 17th 11:39 am (Developer outage with ETT support) Trip: Razorback Castroville (CPS outage) 138 kV Trip: Big Hill Wilson Ranch Wind Interconnection Slide 3

  4. Slide 4 ETT 2021 Budget

  5. Current Schedule Thanksgiving In-service In-service CC Clear Crossing WS West Shakelford EC Edith Clarke T Tesla *Edith Clarke Clear Crossing outages are bifurcated to allow generation output during inspections Slide 5

  6. Current Productivity Edith Clark - Cottonwood Outage: Overall Availability OCT 23, 2020 - MAY 16, 2021 8.0 100% # of Days Available/worked per Week 90% 7.0 80% 6.0 Easter 70% Winter Storm Uri 5.0 Availability 60% 4.0 50% New Year Break 40% 3.0 30% 2.0 20% 1.0 10% 0.0 0% Axis Title available working days/wk worked days/wk weekly availability cumulative availability Slide 6

  7. Other Discussion Items 2022 and Beyond Tentative Plan Additional Capacity Efforts Network upgrades for GTC s (all economic) New technology to reduce impedance, congestion, other issues Accountability issues to address in Texas Winterization certification/planning/additional work Storm quick response performance plan Transmission line availability (99.95%) 1.00 [(hours out x miles) / (1852 circuit miles x 8760 hrs)] Slide 7