Operational Updates and Activities for the Week Ahead

undefined
S
h
u
t
 
D
o
w
n
 
M
a
n
a
g
e
r
s
 
R
e
p
o
r
t
Cons Gattuso
M
a
c
h
i
n
e
 
S
i
g
n
 
o
f
f
We have permission to run Linac and NTF (Oct 16
th
)
We should be completing obtaining permission for Booster
Today
MI Sign offs are scheduled for early next week (Monday)
9/24/2024
2
W
e
e
k
e
n
d
 
a
c
t
i
v
i
t
i
e
s
Friday, Oct 17
th
~16:00 hrs. MI keys returned and removed locks from 13.8 Kv
 Evening shift Search and Secure for Saturday Safety System tests
Interlock and CDC testing
MI checkout list will need to be completed
Saturday, Oct18
th
MI Safety System Test. Starting at 06:00-~12:00
If successful
We can Hi-pot and clear faults
Other wise we will low pot and clear what ever faults we can find
Sunday
Clear faults
Monday
Controlled access
Complete final Leak check
Remove Equipment from 40
Complete signoffs
Possibly run beam Monday afternoon
9/24/2024
3
S
a
f
e
t
y
 
S
y
s
t
e
m
 
T
e
s
t
What still needs to be completed
Booster CDC
MI ESS
Transport ESS
Tev F sector Rad monitors
MI65 ESS
Minos ESS
NuMI Rad monitors
NuMI CDC
Meson  MT6 sec1 & 2 Enclosure
Meson Rad monitors
Meson Test Logic Module
Meson Test Primary CDC
9/24/2024
4
Meson MC6 ESS
Meson MC7 MB7 ESS
Meson Center Rad Monitor
Meson Center CDC
Neutrino G2 ESS
Neutrino NM3-4 RMSS
Neutrino Rad Monitors
Neutrino CDC
N
e
x
t
 
W
e
e
k
 
A
c
t
i
v
i
t
i
e
s
NuMI
Continue with Be Window Assembly Replacement
Mike Andrews will provide more details in the NuMI report
F-Sector
Vacuum Recovery for F1, F2 and F3 house due to Feeder 46B
work ( done next week some time)
~2 hour access over 2 days to pump down and leak check
Switchyard
Rebuild vacuum system around the MuLam replacement
magnet (EPB) in G1 stub
Magnet replacement at MC-6
9/24/2024
5
W
e
e
k
 
E
n
d
P
o
w
e
r
 
o
u
t
a
g
e
s
Saturday, Oct. 18
th
  07:00 - Sunday, Oct. 19
th
   16:00
0700-16:00 hrs – Wilson Hall Power outage
Phase 1- Electrical Switch gear in Wilson will be removed.
Two more to come in the future (November)
9/24/2024
6
I
C
W
 
F
l
u
s
h
i
n
g
M
o
n
d
a
y
 
1
0
-
2
0
-
2
0
1
4
CMTF, Labs A thru G, NML, NS1, NS2, NS4, NWA, MDB, MS1, 2 & 3, Training Center
T
u
e
s
d
a
y
 
1
0
-
2
1
-
2
0
1
4
Fire Dept., Fuel Service Center, GCC, HIL, KTEV, LLRW, MAB, MCRB, MC8, MDB,
MP9, MW9, NE8, NS4, PAB, PB7, PS2, PS3, PS4, PS5, PS6, PW2, Rad Cal, Site 37,
Site 38, Site 39, Vehicle Maint., WHI, WHII,  Well 4
W
e
d
n
e
s
d
a
y
 
1
0
-
2
2
-
2
0
1
4
CDF Office, CDF PK, CHL, D0, D0 Corridor, FCCF, IB1, IB1A, IB2, IB3, IB4, Main
Sanitary Lift Station, Master Sub, PS1, Switch Yard, Well 4, Wilson Hall (north east)
T
h
u
r
s
d
a
y
 
1
0
-
2
3
-
2
0
1
4
AP10, AP30, AP50, APOTH, BTW, BTE, Cross Gallery, CUB, Linac, SWA, SEA, Tev
ring, Transfer Gallery, Wilson Hall back horse shoe (0600 start)
Note:  Weather and adverse conditions may alter this schedule
9/24/2024
7
N
e
x
t
 
w
e
e
k
 
0
9
:
0
0
 
m
e
e
t
i
n
g
 
s
c
h
e
d
u
l
e
Phasing back to the our standard M/W/F  09:00 meeting
Monday – No Meeting
Wednesday – Huddle
Friday-  One West (Operations will be running 09:00)
9/24/2024
8
S
c
h
e
d
u
l
e
s
 
a
n
d
 
L
i
n
k
s
Schedule can be accessed from the Operations Home Page
- Schedules -> 
Operations Schedule
 Direct link to schedule
- 
http://www-ad.fnal.gov/ops/schedule.html
We have added the following  links to Operation’s Schedule
Web page
MS project schedule for the entire shutdown
Week by week Schedule for
Each machine
9/24/2024
9
Slide Note
Embed
Share

This report outlines the operational activities scheduled for the upcoming week, including machine sign-offs, safety system tests, weekend activities, power outages, and ICW flushing. Key tasks include obtaining permissions, conducting safety tests, completing maintenance activities, and scheduling controlled access for equipment checks. The report also mentions upcoming activities such as vacuum system rebuilds and power outages in Wilson Hall.

  • Operational activities
  • Machine sign-offs
  • Safety system tests
  • Weekend activities
  • Power outages

Uploaded on Sep 24, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Shut Down Managers Report Cons Gattuso

  2. Machine Sign off We have permission to run Linac and NTF (Oct 16th) We should be completing obtaining permission for Booster Today MI Sign offs are scheduled for early next week (Monday) 2 9/24/2024

  3. Weekend activities Friday, Oct 17th ~16:00 hrs. MI keys returned and removed locks from 13.8 Kv Evening shift Search and Secure for Saturday Safety System tests Interlock and CDC testing MI checkout list will need to be completed Saturday, Oct18th MI Safety System Test. Starting at 06:00-~12:00 If successful We can Hi-pot and clear faults Other wise we will low pot and clear what ever faults we can find Sunday Clear faults Monday Controlled access Complete final Leak check Remove Equipment from 40 Complete signoffs Possibly run beam Monday afternoon 3 9/24/2024

  4. Safety System Test What still needs to be completed Booster CDC MI ESS Transport ESS Tev F sector Rad monitors MI65 ESS Minos ESS NuMI Rad monitors NuMI CDC Meson MT6 sec1 & 2 Enclosure Meson Rad monitors Meson Test Logic Module Meson Test Primary CDC Meson MC6 ESS Meson MC7 MB7 ESS Meson Center Rad Monitor Meson Center CDC Neutrino G2 ESS Neutrino NM3-4 RMSS Neutrino Rad Monitors Neutrino CDC 4 9/24/2024

  5. Next Week Activities NuMI Continue with Be Window Assembly Replacement Mike Andrews will provide more details in the NuMI report F-Sector Vacuum Recovery for F1, F2 and F3 house due to Feeder 46B work ( done next week some time) ~2 hour access over 2 days to pump down and leak check Switchyard Rebuild vacuum system around the MuLam replacement magnet (EPB) in G1 stub Magnet replacement at MC-6 5 9/24/2024

  6. Week End Power outages Saturday, Oct. 18th 07:00 - Sunday, Oct. 19th 16:00 0700-16:00 hrs Wilson Hall Power outage Phase 1- Electrical Switch gear in Wilson will be removed. Two more to come in the future (November) 6 9/24/2024

  7. ICW Flushing Monday 10-20-2014 CMTF, Labs A thru G, NML, NS1, NS2, NS4, NWA, MDB, MS1, 2 & 3, Training Center Tuesday 10-21-2014 Fire Dept., Fuel Service Center, GCC, HIL, KTEV, LLRW, MAB, MCRB, MC8, MDB, MP9, MW9, NE8, NS4, PAB, PB7, PS2, PS3, PS4, PS5, PS6, PW2, Rad Cal, Site 37, Site 38, Site 39, Vehicle Maint., WHI, WHII, Well 4 Wednesday 10-22-2014 CDF Office, CDF PK, CHL, D0, D0 Corridor, FCCF, IB1, IB1A, IB2, IB3, IB4, Main Sanitary Lift Station, Master Sub, PS1, Switch Yard, Well 4, Wilson Hall (north east) Thursday 10-23-2014 AP10, AP30, AP50, APOTH, BTW, BTE, Cross Gallery, CUB, Linac, SWA, SEA, Tev ring, Transfer Gallery, Wilson Hall back horse shoe (0600 start) Note: Weather and adverse conditions may alter this schedule 7 9/24/2024

  8. Next week 09:00 meeting schedule Phasing back to the our standard M/W/F 09:00 meeting Monday No Meeting Wednesday Huddle Friday- One West (Operations will be running 09:00) 8 9/24/2024

  9. Schedules and Links Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html We have added the following links to Operation s Schedule Web page MS project schedule for the entire shutdown Week by week Schedule for Each machine 9 9/24/2024

More Related Content