TPF-5 (443) DPS User Group Meeting Updates

TPF-5 (443) DPS User Group Meeting Updates
Slide Note
Embed
Share

This content provides updates and details from the TPF-5 (443) DPS User Group Meeting held on November 10, 2021. It covers various topics such as Ohio DOT updates, COVID-related issues, collection procedures, project details, repeat line tests, core calibrations, longitudinal joint scans, and more.

  • Meeting
  • Updates
  • Ohio DOT
  • User Group
  • TPF-5

Uploaded on Feb 18, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. TPF-5 (443) DPS USER GROUP MEETING NOVEMBER 10, 2021

  2. 2021 OHIO DOT DPS UPDATES Craig E. Landefeld, P.E. ODOT Office of Pavement Engineering 2 | TPF-5 (443) DPS User Group Meeting

  3. 2021 1 STEP FORWARD - 2 STEPS BACK o COVID Issues o Staffing Issues o Contractor Issues 3 | TPF-5 (443) DPS User Group Meeting

  4. 2021 COLLECTION PROCEDURES o Air/Metal Calibration Daily o AM/PM Line Test o Swerve collection pattern o Acceptance Core Collection o Lab Gyratory Samples o Long Joint Collection Single Straddle 4 | TPF-5 (443) DPS User Group Meeting

  5. COS-US36 PROJECT DETAILS o 7mi. Rural 4 Lane Divided o 1.5in -12.5mm Int. o 1.5in -12.5mm Surface o Hot joint on shoulders o Cold joint at lane line o 447 Joint Density Spec o Contractor Gyratories??? 5 | TPF-5 (443) DPS User Group Meeting

  6. REPEAT LINE TESTS COS-36 Line Test Data 0.2 Difference Between Sensors 0.1 0 -0.1 -0.2 -0.3 -0.4 -0.5 0 2 4 6 8 10 12 Day Machine 1 Machine 2 Upper Limit Lower Limit 6 | TPF-5 (443) DPS User Group Meeting

  7. COS-36 CORE CALIBRATIONS COS-36 Machine 1 Time COS-36 Machine 2 Time 98 98 97 97 y = 4.3148x + 70.599 R = 0.3184 y = 5.1099x + 65.677 R = 0.2602 96 96 95 95 94 94 93 93 92 92 91 91 4.9 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.4 5.45 5.5 5.55 5.6 5.65 5.7 5.75 5.8 7 | TPF-5 (443) DPS User Group Meeting

  8. COS-36 CORE CALIBRATIONS COS-36 Machine 1 Distance COS-36 Machine 2 Distance 98 98 97 97 y = 5.4025x + 63.737 R = 0.3865 96 96 95 95 94 94 93 93 92 92 y = 2.4868x + 80.749 R = 0.05 91 91 5.3 5.4 5.5 5.6 5.7 5.8 5.9 6 6.1 5.45 5.5 5.55 5.6 5.65 5.7 5.75 8 | TPF-5 (443) DPS User Group Meeting

  9. COS-36 LONGITUDINAL JOINT SCANS Average Dielectric on Longitudinal Joint Straddle Sensors Average Dielectric on Longitudinal Joint Single vs Straddle vs Joint Core 6.0 6.0 5.8 5.8 5.6 5.6 Dielectric Dielectric 5.4 5.4 5.2 5.0 5.2 4.8 180 - 188 192 - 200 216 - 224 278 - 288 5.0 Stations 180 - 188 192 - 200 216 - 224 Stations 278 - 288 288 - 298 M1 Single M2 Single M1 Straddle M1 203 M1 209 M2 182 M2 183 M2 Straddle M1 Joint Core M2 Joint Core 9 | TPF-5 (443) DPS User Group Meeting

  10. FAI-664 PROJECT DETAILS o 5mi. Rural 2-lane o 1.0in o 1.25in. Surface Course o Control Section o Type 1 Surface, PG 70-22M, 20% RAP o High RAP o Balanced Mix Design o Type 1 Surface, PG 70-22 w. recycling agent, 55-60% RAP 10 | TPF-5 (443) DPS User Group Meeting

  11. REPEAT LINE TESTS FAI-664 Line Test Data 0.2 0.15 Difference Between Sensors 0.1 0.05 0 -0.05 -0.1 -0.15 -0.2 -0.25 -0.3 0 1 2 3 4 5 6 7 8 Day Machine 1 Machine 2 Upper Limit Lower Limit 11 | TPF-5 (443) DPS User Group Meeting

  12. FAI-664 CORE CALIBRATIONS CONTROL SECTION 98.0 50% 120% y = 5.4844x + 66.582 R = 0.7014 45% 97.0 100% 40% 96.0 35% 80% 30% Frequency Density (%) 95.0 25% 60% 94.0 20% 40% 15% 93.0 10% 20% 92.0 5% 0% 0% 91.0 91% 92% 93% 94% Density (%) 95% 96% 97% 98% 4.6 4.7 4.8 4.9 5 Dielectric 5.1 5.2 5.3 5.4 5.5 12 | TPF-5 (443) DPS User Group Meeting

  13. FAI-664 CORE CALIBRATIONS HIGH RAP SECTION 98.0 25% 120% y = 8.2906x + 45.361 R = 0.8629 96.0 100% 20% 94.0 80% 15% Density (%) Frequency 92.0 60% 10% 90.0 40% 5% 88.0 20% 86.0 0% 0% 5 5.2 5.4 5.6 5.8 6 6.2 87% 88% 89% 90% 91% 92% Density 93% 94% 95% 96% 97% 98% Dielectric 13 | TPF-5 (443) DPS User Group Meeting

  14. MACHINE COMPARISONS M1 M2 M1 M2 M1 M2 MAD-70 Mean Std Dev COS-36 Mean Std Dev FAI-664 Mean Std Dev 6.26 0.298 6.11 0.299 5.36 0.247 5.33 0.253 5.05 0.121 5.03 0.124 2020 MAD-70 Dielectrics 2021 FAI-664 Dielectrics 2021 COS-36 Dielectrics 3.5 3.5 3.5 3 3 3 2.5 2.5 2.5 2 2 2 1.5 1.5 1.5 1 1 1 0.5 0.5 0.5 0 0 0 4.5 5 5.5 6 6.5 7 7.5 4.5 5 5.5 6 6.5 7 7.5 4.5 5 5.5 6 6.5 7 7.5 1 2 1 2 1 2 14 | TPF-5 (443) DPS User Group Meeting

  15. THINGS TO CONSIDER??? 1. Causes of sensor variability? 2. Causes of poor core calibrations? 3. How do we define comparison 4. Is the effect of joint enrichment an issue? 5. Could we use this as a tool to assess Void Reducing Asphalt Membrane (VRAM)? 15 | TPF-5 (443) DPS User Group Meeting

  16. WHATS NEXT ??? 1. Machine Comparisons Precision & Bias - QC/QA Procedure & Comparison Tolerances 2. Gyratory Procedures - Work with Producers 3. Collection Procedures (Swerve? Long. Joints?) - Swerve / Linear - Longitudinal Joints 4. VETA Analysis - 2022 Projects 5. Specs for Pilot/Shadow Projects 16 | TPF-5 (443) DPS User Group Meeting

  17. QUESTIONS ? Last updated 2/18/2025 17 | TPF-5 (443) DPS User Group Meeting

Related


More Related Content