Support for Earthquake-Affected Population in Rasuwa District, Aug 2015-Apr 2016

 
Support the Earthquake Affected population to
meet their relief and early recovery need in
Rasuwa District
Aug 2015 – Apr 2016
 
Funded By
 
Goal, Rasuwa
 
Working in 3 VDCs : Dhunche, Syaphru and Gatlang
Objective :
1.
Shelter up gradation
2.
Material Support
3.
Cash for Work
4.
Livestock shed support
5.
Verification of earthquake resistant techniques – pilot
and Demo construcion.
 
Detail of Beneficiaries No
 
Dhunche – 396 HH
Syaphru – 323 HH
Gatlang – 481 HH
Total = 1200 HH
 
Distribution
 
Shelter Kit Distribution – 1200 HH
Shelter kit - 
ShelterMaterials_ECHO.docx
Tool Kit Distribution – 1200 HH @ 1 box per 5 HH
Tool Kit - 
Toolkits_ECHO.docx
Tool Kit given handover to VDC -
Toolkits_ECHO_VDC.docx
 
DRR Training
 
The training includes the basic earthquake resistant
construction techniques given by Shelter Cluster and
Nepal Government.
The approach was done in two ways:
1.
DRR Training session : conducted by Engineers
2.
HH visit, convey the message from Cluster, monitoring
and supervision : done with Engineers and Technical
Assistants.
Total DRR Training Completed : 11 session
Total Household Approached : 1200 HH
 
Mason Training
 
Objective : To train the rural masons  for enhancing their
capacity and make familiar with the earthquake resistant
construction techniques.
The training was conducted in coordination with DUDBC.
Duration of Training  :1
st
 and 2
nd
 session -5 days, 3
rd
session -7 days
No of Training completed : 3
1 planned
No of masons trained: 78
 
Construction Activities
 
Pilot House Construction – 3 nos
completed
 
Demo House Construction – 5 nos completed
1 - ongoing
 
Livestock shed construction
Training
 
Training for construction of Livestock Shed for small
goat/sheep farming.
No of training conducted – 8 session
 
Cash For Work
 
Shelter Beneficiaries – 1200 HH @ NPR 10000 support
Livestock Shed Beneficiaries – 275 HH @ 10000 support
 
HH Monitoring
 
Monitoring of each household ( total 1200 ) was done in 3
phase :
1.
1
st
 phase  : Convey DRR training message. A
ssessment of
houses.
2.
2
nd
 Phase : Suggestion and supervision
3.
3
rd
 Phase  : Assessment of up gradation.
 
 
 
Current Activities
 
Working for completion of few remaining activities in
CFW, Demo and reporting.
 
What Next….
 
Need Assessment and Gap Finding.
 
Thank You
Slide Note
Embed
Share

Support earthquake-affected population in Rasuwa District with shelter upgradation, material support, cash-for-work, livestock shed assistance, and earthquake-resistant techniques verification. Activities include distribution of shelter kits and tool kits, DRR training, mason training, construction of demo and pilot houses, and livestock shed construction training. Cash-for-work support provided to shelter and livestock shed beneficiaries. Total of 1200 households benefited.

  • Earthquake Relief
  • Rasuwa District
  • Shelter Support
  • Livelihood Assistance
  • Disaster Recovery

Uploaded on Aug 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Support the Earthquake Affected population to meet their relief and early recovery need in Rasuwa District Aug 2015 Apr 2016 Funded By

  2. Goal, Rasuwa Working in 3 VDCs : Dhunche, Syaphru and Gatlang Objective : Shelter up gradation 1. 2. Material Support 3. Cash for Work 4. Livestock shed support 5. Verification of earthquake resistant techniques pilot and Demo construcion.

  3. Detail of Beneficiaries No Dhunche 396 HH Syaphru 323 HH Gatlang 481 HH Total = 1200 HH

  4. Distribution Shelter Kit Distribution 1200 HH Shelter kit - ShelterMaterials_ECHO.docx Tool Kit Distribution 1200 HH @ 1 box per 5 HH Tool Kit - Toolkits_ECHO.docx Tool Kit given handover to VDC - Toolkits_ECHO_VDC.docx

  5. DRR Training The training includes the basic earthquake resistant construction techniques given by Shelter Cluster and Nepal Government. The approach was done in two ways: DRR Training session : conducted by Engineers HH visit, convey the message from Cluster, monitoring and supervision : done with Engineers and Technical Assistants. Total DRR Training Completed : 11 session Total Household Approached : 1200 HH 1. 2.

  6. Mason Training Objective : To train the rural masons for enhancing their capacity and make familiar with the earthquake resistant construction techniques. The training was conducted in coordination with DUDBC. Duration of Training :1st and 2nd session -5 days, 3rd session -7 days No of Training completed : 3 1 planned No of masons trained: 78

  7. Construction Activities Demo House Construction 5 nos completed 1 - ongoing Pilot House Construction 3 nos completed

  8. Livestock shed construction Training Training for construction of Livestock Shed for small goat/sheep farming. No of training conducted 8 session

  9. Cash For Work Shelter Beneficiaries 1200 HH @ NPR 10000 support Livestock Shed Beneficiaries 275 HH @ 10000 support

  10. HH Monitoring Monitoring of each household ( total 1200 ) was done in 3 phase : 1. 1st phase : Convey DRR training message. Assessment of houses. 2. 2nd Phase : Suggestion and supervision 3. 3rd Phase : Assessment of up gradation.

  11. Current Activities Working for completion of few remaining activities in CFW, Demo and reporting.

  12. What Next. Need Assessment and Gap Finding.

  13. Thank You