This content provides an overview of Study Committee B2, focusing on topics within asset management life-cycle phases, technical direction, statistics, and preferential subjects discussed in the 2022 CIGRE Canada Study Committees Update Meeting on November 2nd.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Study Study Committee Committee Update Meeting Update Meeting SC B2 Overhead Lines SC B2 Overhead Lines Canadian Representative: Brian Townsend Canadian Representative: Brian Townsend 2022 CIGRE Canada Study Committees Update Meeting November 2
2 Study Committee Introduction Scope Within its technical field of activity, Study Committee B2 addresses topics throughout the asset management life- cycle phases; from conception, through research, development, design, production, deployment, operation, and end-of life. At all stages, technical, safety, economic, environmental and social aspects are addressed as well as interactions with, and integration into, the evolving power system and the environment. All aspects of performance, specification, testing and the application of testing techniques are within scope, with a specific focus on the impact of changing interactions and demands due to evolution of the power system. Life cycle assessment techniques, risk management techniques, education and training are also important aspects. Technical Direction Increase the ampacity of existing lines Ensure reliable lines, establish/improve the reliability of existing lines Ensure environmentally compatible lines Assessment of lines, methods, new tools and materials Statistics Regular members from 24 countries 28 Active Working Groups B2 has issued 93 Technical Brochures since 1994 Advisory Groups Customer Advisory Group, Strategic Advisory Group, Electrical Performance, Towers/Foundations/Insulators, Mechanical Behaviour, Asset Management 2022 CIGRE Canada Study Committees Update Meeting November 2
CIGRE Paris Overview B2 Tutorial Inspection and testing of tools, equipment and training for live-line work on overhead lines B1/B2/B4/C1 Workshop Extra-long transnational transmission lines Three Preferential Subjects PS1 Challenges and New Solutions in Design and Construction of new OHL Design for reliability, availability, future climate parameters, more frequent extreme loads, design against theft, vandalism AC/DC Hybrid Lines, multi-purpose utilization OHL challenging construction projects PS2 Latest Techniques in Asset Management, Capacity Enhancement, Refurbishment Preparedness and countermeasures for natural disasters and other emergencies Decisions of replacement based on monitoring, maintenance, operation, historical data Strengthening of existing lines to improve reliability, ampacity, lifespan PS3(w/C3) Environmental and safety aspects from OHL Safety of workers in construction and maintenance of lines Reducing environmental impacts from new and existing OHL. Innovative engineering solutions/design to deal with environmental challenges 2022 CIGRE Canada Study Committees Update Meeting November 2 3
Preferential Subjects Group Survey was undertaken in late 2021 with one of the goals to identify new topics of development. Top Industry Challenges Increase Capacity and reliability Climate/Environmental Change Condition Assessment Use of monitoring sensors Environmental Impact of OHL Public Acceptance Construction and Maintenance Best Practices Maximizing use of existing RoWs New construction techniques Methods to Optimize Design DLR RoW Use New Materials 2022 CIGRE Canada Study Committees Update Meeting November 2 4
Canadian Technical Activities Relevant activities 2023 B2 Meeting will be held in Sendai, Japan Current Working Groups of interest for Canada WG B2.67 Assessment and Testing of Wood and Alternative Material Type Poles WG B2.71 Recommendations for interphase spacers of overhead lines WG B2.84 Assessment of the methodologies to analyze conductor motion JWG B2/D2.72 Condition Monitoring and Remote Sensing of OHL JWG B2/C1.87 Asset Management of OH Transmission Lines 2022 CIGRE Canada Study Committees Update Meeting November 2 5
Recently Published Reports Green Book 11 Techniques for Protecting Overhead Lines in Winter Conditions (2022) M. Farzaneh TB 865 Inspection and testing of tools, equipment and training for live-line work on overhead lines (2022) WG B2.64 T. Carreira, P. Komaromi 2022 CIGRE Canada Study Committees Update Meeting November 2 6
Proposed New Working Groups B2 Working Groups Approved in 2021/2022 WG B2.87: Live line and vicinity working on overhead lines Safe Management Guidelines (No CA Member) JWG B2-C1.86: Approach for Asset Management of Overhead Transmission Lines (No CA Member) WG B2.85: Emergency Restoration Systems for Overhead Lines - Guide for Design, Planning and Installation (M. Leger) WG B2.84: Assessment of the methodologies to analyze wind induced overhead line conductors motion: applications and limitations (S. Bell, D. Havard, S. Najafabadi, J.P. Paradis, S. Prud homme, P. Van Dyke) Proposed new Working Groups WG xx: OHL Construction Methodology WG xx: Safety Guidelines for OHL Construction and Maintenance WG xx: Guide for Improving Bird Safety 2022 CIGRE Canada Study Committees Update Meeting November 2 7
Canadian Highlights Pierre Van Dyke is the new SCB2 Chair Green Book 11 by Masoud Farzaneh Canadian members are the Convenors of 6 Working Groups B2/C4.76: Bill Chisholm B2.69: Masoud Farzaneh (H l ne Gauthier as Secretary) B2.71: Jean-Philippe Paradis B2.79: George Watt B2.59: George Watt B2.81: Sebastien Langlois Canadian members are participating in 26(+1) of 28 Working Groups. 2022 CIGRE Canada Study Committees Update Meeting November 2 8
Canadian Representative Brian Townsend Company: AltaLink Title: Principal Engineer Transmission Lines Email: brian.townsend@altalink.ca Phone: 403-519-2289 2022 CIGRE Canada Study Committees Update Meeting November 2 9