This presentation showcases the proposed construction sequence for the mainline pavement section of the project in Shelby County. It includes detailed images and descriptions of various construction stages, such as the segments from W. McLemore Avenue to South of Crump Boulevard, the Crump/Roundabout area, different pavement section alternatives, traffic control procedures, and construction sequence planning.


Uploaded on Aug 19, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. CNW055 Shelby County Mandatory Pre-bid Meeting March 8, 2022 Jamie Fitzpatrick

  2. Presentation Order: Proposed Construction Mainline Pavement Section Construction Sequence

  3. Proposed Construction

  4. W. McLemore Avenue to Wisconsin Avenue

  5. Wisconsin Avenue to South of Crump Boulevard

  6. Crump/Roundabout

  7. Mainline Pavement Section Alternate AA1

  8. Mainline Pavement Section Alternate AA2

  9. Mainline Temp. Pavement Section Alternate AA1

  10. Mainline Temp. Pavement Section Alternate AA2

  11. Traffic Control/ Maintenance Of Traffic

  12. Construction Sequence existing interchange

  13. Construction Sequence Stage 1A

  14. Construction Sequence Stage 1A

  15. Construction Sequence Stage 1B

  16. Construction Sequence Stage 1B

  17. Construction Sequence Alternate Route

  18. Construction Sequence Alternate Route

  19. Construction Sequence Alternate Route

  20. Construction Sequence Local Street Detours Riverside Drive to South Parkway

  21. Construction Sequence Local Street Detours

  22. Construction Sequence Local Street Detours S. Third Street to South Parkway

  23. Construction Sequence Local Street Detours McLemore Ave. to S. Third Street

  24. Construction Sequence Local Street Detours Riverside Boulevard to South Parkway

  25. Construction Sequence Local Street Detours Presidents Island Detour: Riverside Boulevard to Trigg Avenue to Jack Carley Causeway

  26. Construction Sequence Local Street Detours Crump Blvd. to Metal Museum

  27. Construction Sequence Stage 2

  28. Construction Sequence Stage 2

  29. Construction Sequence Stage 2

  30. Construction Sequence Stage 2 Crossover B

  31. Construction Sequence Stage 3

  32. Construction Sequence Stage 3

  33. Construction Sequence Stage 3

  34. Construction Sequence Stage 3

  35. Construction Sequence Stage 3

  36. Construction Sequence Stage 3 two-way loop

  37. Construction Sequence Stage 4A

  38. Construction Sequence Stage 4A

  39. Construction Sequence Stage 4A

  40. Construction Sequence Stage 4B

  41. Construction Sequence Stage 4B

  42. Construction Sequence Stage 4C

  43. Construction Sequence Stage 4C

  44. Construction Sequence Stage 4C Crossover C Mod TWO-WEEK SHUTDOWN Memphis-Arkansas Bridge

  45. Construction Sequence Stage 4C Detour

  46. Construction Sequence Stage 5

  47. Construction Sequence Stage 5

  48. Construction Sequence Stage 6

  49. Construction Sequence Stage 6

  50. Construction Sequence Completed project