The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Schuylkill River Trail & The Cities tourism
Downtown Overview Proposed Trail: 2 miles in town 9 crosswalks total daily average of 2,800 users
Existing crosswalks continued All in various states of life Few ADA compliant One non existent
Why does any of this matter? More then 30,000 tourists a year
Before Vs After
Break down COST BREAK DOWN material cost amount size asphalut $140.00 2 tons 8ftx15ft $310.00- $350.00 stencil 1 crosswalk paint variable 5 gal variable labor variable variable variable