Required Infrastructure for Cryostat Installation and Material Movement at CERN
In preparation for cryostat installation at CERN, a detailed list of required infrastructure including access, electrical power, communication, ventilation, safety measures, and equipment is provided. The document outlines the essential components needed for the successful initiation of the installation process.
Uploaded on Sep 30, 2024 | 0 Views
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
LBNF - Required infrastructure to start cryostat installation and material movement Dimitar MLADENOV & The entire CERN Team FS Installation Workshop SURF, 19-22 August 2019
LBNF Required infrastructure to start cryostat installation At T0 we would need: Access (both sides) If a permanent one is not available (the preferred option), then we need temporary one (stairs, scaffolding, Alimak, etc.) Lights If a permanent one is not available (the preferred option), then we need temporary one. In the cage? Electrical Power Single and three Phases, US as well as EU Communication WiFi, GSM?, Ventilation Shall be operational Compressed Air Could be temporary Working Safety Organization Training, approved PPE, requirements, access control, etc. Full Organization on the Surface for lowering down the material All the beams for the floor shall be ready for immediately availability Underground Crane & Hoists Shall be operational (including a professional rigging team, and full set of basic rigging accessories) Fully operational survey team General cleaning, by dedicated team will be performed on daily bases Also to decide who provides some of the tools Load guiders for the shafts Carts for the beams Etc. CERN NP LBNF 2
LBNF Required infrastructure to start cryostat installation and material movement Main Electrical Power Requirements: 10 x Welding posts 10 x 15A @ 460V Peak Power: 150A @ 460V (3 phase) Ideally spread on two main electrical distribution boxes (north and south) in the middle of each cavern US EU EU CERN NP LBNF 3
LBNF Electric power requirements throughout the cryostat construction Proposed locations Electric Distribution Boxes (and Compressed Air) Electric Distribution Boxes (and Compressed Air) CERN NP LBNF 4
Thank you! CERN NP LBNF 5