Neutrino Platform Hall Access and Safety Guidelines

Slide Note
Embed
Share

Guidelines for accessing and ensuring safety within the Neutrino Platform Hall at CERN, including registration, permissions, safety trainings, required equipment, online trainings, access points, and safety team responsibilities. Access is granted through registration at CERN, completion of safety trainings, and wearing necessary Personal Protective Equipment (PPE). Specific access points and restrictions are outlined for different areas within the hall. The Safety Team, including Project Safety Officer and Territorial Safety Officer, ensures safety throughout the installation, operational, and experimental phases.


Uploaded on Sep 10, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Access and Safety team of the Neutrino Platform Hall 1

  2. HOW TO ACCESS THE NP HALL ADaMS 1. Be registered at CERN 2. Request access permission 3. Follow the required safety trainings 5. Wear required Personal Protective Equipment (PPE) 4. Have a valid IMPACT 2

  3. REQUIRED ON LINE TRAININGS On line trainings: https://sir.cern.ch/ Only once registered at CERN Required trainings: Safety at CERN (15 min) Electrical Awareness (30 min) Neutrino Platform Hall (1 h) access, practical information, activities organisation, risks in the hall, emergency procedure, etc. 3

  4. Badge to enter! 3 main access doors to the NP Hall Jura Side Sal ve Side 4

  5. 3 access points to the trenches Badge to enter (specific access rights) No access during cryostat filling Only maintenance once stable Jura Side Sal ve Side 5

  6. 2 access points to the top of the cryostats Jura Side Badge to enter (specific access rights) Always accessible Sal ve Side 6

  7. THE SAFETY TEAM PSO Safety of the construction yard (installation phase) Project Safety Officer TSO plus: Territorial Safety Officer Safety of the building and premises HSE Health & Safety and Environmental Protection Department DSO Departmental Safety Officer Safety of the experiment and experimental area EXSO Safety in situ of the experiment (commissioning and operational phase) Experimental Safety Officer 7