The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Origami, PA 2015 Sep. 10 Koji Hara (KEK)
Origami Status PA0 Production APV Origami Assembly Specification
PA0 171 (159 + 22) PA0 produced and electrically tested 104 OK 67 NG (shorts) Now At KEK sent back to Taiyo on Sep. 10 checked for cracks (5 + 1 pieces) at KEK No cracks 3rdbatch 76 pieces produced. Now at Taiyo Scheduling electrical test.
APV Cleaning and inspection after cleaning completed on Sep. 10 Good APVs w/o cleaning : 1219 Cleaning result 433 dirty chips 387 good (338 + 49 (manual cleaning) ) visual inspection again 384 good (3 cracks) Already used for batch0: -120 Received 100 Good chips from HEPHY today Good APV chips in hand : 1219+384-120 + 100 = 1583 (1410 at least needed) +173 (+12%) spare chips seems to be enough
Origami Spec. Discussed with REPIC (and Taiyo) No problem in the technical things Some minor things Needed to clarify the responsibility if failure happens Visual inspection of bonding pads after reflow Inspection of both APV-side and Sensor-side will be done Minor things
Electrical Tests Step 1 All bare Origami flexes must be electrically tested All bare PA0 s are also electrically tested After this PA0 test, further processing shall only happen after the test results are analyzed by the client and he approves of going ahead. Step 2 Once the Origami flex is assembled with components and reflow is done, PA0 must be electrically tested again against opens and shorts, because the reflow process may cause some damage. After that test, further processing shall only happen after the test results are analyzed by the client and he approves of going ahead. Step 3 After assembly of all parts, including the chips and wire-bonding, the fully populated Origami undergoes an electrical test at KEK. All Origami flexes which pass this test (and all other test before including visual inspection) are deemed as accepted Here are two things: The Origamis failed these test cannot be used for assembly of Belle II SVD. Obvious Who takes responsibility of reproducing Origami, PA0 and parts if bad Origamis found in these step ? Need to be clarified and agreed with the company (REPIC) REPIC cannot be responsible for the quality of APV chips found to be bad in step 3.
Responsibility of Origami reproduction If bad Origami+PA0 is found REPIC (actually Taiyo) takes responsibility of Producing 141 Origami passing electrical test Producing 141 PA0 passing electrical test After SMD parts assembly by reflow soldering REPIC will reproduce Origami and PA0 only If there is clear fault in the process. If wire bonding found to be is impossible due to solder drop on the pad. After APV gluing + wire bonding REPIC will reproduce Origami and PA0 only If there is clear fault in the process. Otherwise KEK will be responsible to reproduce Origami and PA0 In any case, connectors and APVs should be provided by KEK
Spare Origami and PA0 at Taiyo Origami At Taiyo 10 Origami Z 6 Origami +Z 19 Origami CE Those are available for spare without additional cost. PA0 Additional good pieces passing electrical test will be available for spare. So far 104 good (67 bad), 76 to be measured I hope good yield
Bonding position for Bias check p-side bias pad p-side bias pad p-side bias pad p-side bias pad wire bond (green) wire bond (green) n-side bias pad n-side bias pad wire bond (green) wire bond (green) No specific request on spec. Any preference? For batch0 no request sent bonded at the center b) REPIC says c) is OK but a) is not if need to be at the end of pad n-side bias pad n-side bias pad a) b) c)
Origami Spec. Minor things Serial Numbers and Tracking 13.1. PA0 In order to track the history and measurements of each PA0, a unique serial number shall be assigned to every PA0 in the format PA0.nnn (regardless of wide or narrow pad type), and nnn is a 3-digit number, starting from 000. This serial number shall be attached to the envelope of the PA0 by the manufacturer (probably using a barcode for convenience) and may also be written onto an inactive region of PA0 with felt pen (maybe in short form nnn , omitting the obvious PA0 prefix). Electrical measurement data of PA0 shall always refer to the respective PA0 serial number or to the Origami flex serial number, after the PA0 is attached to it. When PA0 is glued onto an Origami flex, the matching serial numbers of both objects shall be recorded in an Excel table and provided to the client. Already started from 001 No such barcode prepared Other things are OK
PA 2ndproduction + replacement of bad PAs Pad width measurement is on-going 280 (2ndprod.) + 61 (replacement of 1stbad PAs) 280 measured ( good 269, bad(<30um) 11 ) 61 still to be measured (30 PB2, 30 PF2, 1 PA1) Will be measured on 9/19 (and 26) (Sat.) Replacement of bad (<30um) PA 61 pcs for 1st delivery already delivered and measured 11 pcs for (2nddelivery + 1streplacement measured so far) to be delivered on Sep. 14
PA Production and width measurement status Ordered Width OK Sent for visual inspection Remaining pieces P3F1 30 30 19@Melbourne P3F2 30 30 14@Melbourne P3B1 30 30 20@Melbourne P3B2 30 30 17@Melbourne PF1 100 100 29+39@Pisa PF2 100 70 20+38@Pisa 30 pcs not measured PB1 100 98 26+36@Pisa 2 pcs delivery on Sep. 14 PB2 100 70 23+@Pisa 30 pcs not measured PA1 200 192 57@HEPHY 1 pc not measured. 7 pcs delivery on Sep. 14 PA2 200 198 60@HEPHY 2 pcs delivery on Sep. 14