National Hydrology Project
This document provides details of the National Hydrology Project led by the Government of West Bengal in association with the World Bank. It includes information on key personnel, funds received, major procurement items, and provisions in the Annual Work Plan. The project aims to enhance water resource management through various systems and capacity enhancement initiatives.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
National Hydrology Project Govt. of West Bengal IRRIGATION AND WATERWAYS DEPARTMENT (WEST BENGAL SURFACE WATER) 1st World Bank Mission Bhubaneswar, Odisha 22ND & 23RD AUGUST, 2017
Details of SPMU Principal Secretary DSW-I CE, D&R SE, IPC-II Director, APPEMC Tendering Unit Implementing Unit Hydrology and Modeling Unit Water Resource Management Unit EE, Burdwan I&P Division, Burdwan EE, Damodar HQ Division, Durgapur Sri S. Bhattacharya, EE, Burdwan I&P Division Sri Sunil Kumar, Dy. Director, APPEMC Sri D. Roy Chowdhury, Dy. Director, CDO Dr. B.C. Barman, Dy. Director, RRI Sri D. Maity Dy. Director, APPEMC Sri R.K. Sharma EE, DVC Study Cell EE, Durgapur M&E Division, Durgapur EE, Sundarban Delta Project, RRI Dr. S.S. Dey Dalal, Dy. Director, RRI Sri S. Sarkar, EE- I, IP Division (South) 2 Nos. A.E of EE-I, I&P Division (South) Sri Pinaki Chatterjee, Asstt. Director, CDO Sri Bomkesh Ojha, Asstt. Director, DSO Sri P. Paul, Dy. Director, CDO EE, I&P Division (Central) EE, NB Planning Division, Malda Shri Abhijit Roy, RO, RRI Sri Debasish Roy, Asstt. Director, CDO EE, Purulia Investigation Division, Purulia EE, Jalpaiguri (I) Division, Jalpaiguri EE, KKB Division, Sabang EE, Mayurakshi HQ Divison, Suri Sri S. Sarkar, EE- I, IP Division (South) Sri Subhodip Sarkar, RO, RRI
Fund Received Fund Received FOR 2016-17: RS.73.25 LACS FOR 2017-18: RS.300.00 LACS EXPENDITURE: NIL
Major Procurement Item in PIP Item Code Total Cost (Rs. Lacs) Items A A1 Water Resources Data Acquisition System (WRDAS) Development of RTDAS in the entire State Procurement of Discharge Measurement Equpment including measurement of Discharge Procurement of Survey Equipment Field and Bathymetric Surveys Procurement of SCADA System for Barrage and Canals Data Centers 6000 2642 430 A1 77 261 1200 1390 A1 A1 A2 A3 B B2 Water Resources Information System (WRIS) Development of State WRIS 500 500 C C1 C2 Water Resources Operation and Planning Sysytem (WROPS) River Basin Management Platform Purpose Driven Studies 1500 1160 340 D D1 D2 D3 D4 Institution and Capacity Enhancement Development of Knowledge Center National and International Training, Workshop, Seminar, Study Tours Establishment Cost for SPMU Incremental Staff Cost 2000 460 580 500 460 GROSS 10000
Major Procurement Item in AWP 2016-17 Provision in AWP 2016- 17 (Rs. Lacs) 51.45 0 Item Code Items A A1 Water Resources Data Acquisition System (WRDAS) Development of RTDAS in the entire State Procurement of Discharge Measurement Equpment including measurement of Discharge Procurement of Survey Equipment Field and Bathymetric Surveys Procurement of SCADA System for Barrage and Canals Data Centers 0 A1 40 0 0 A1 A1 A2 A3 11.45 B B2 Water Resources Information System (WRIS) Development of State WRIS 5 5 C C1 C2 Water Resources Operation and Planning Sysytem (WROPS) River Basin Management Platform Purpose Driven Studies 13 0 13 D D1 D2 D3 D4 Institution and Capacity Enhancement Development of Knowledge Center National and International Training, Workshop, Seminar, Study Tours Establishment Cost for SPMU Incremental Staff Cost 3.8 0 0.5 3 0.3 GROSS 73.25
Major Procurement Item in AWP 2017-18 Provision in AWP 2017-18 (Rs. Lacs) Item Code Items A A1 Water Resources Data Acquisition System (WRDAS) Development of RTDAS in the entire State 1102 535 Procurement of Discharge Measurement Equpment including measurement of Discharge 144 A1 Procurement of Survey Equipment 48 A1 Field and Bathymetric Surveys Procurement of SCADA System for Barrage and Canals Data Centers 100 120 155 A1 A2 A3 B B2 Water Resources Information System (WRIS) Development of State WRIS 23 23 C C1 Water Resources Operation and Planning Sysytem (WROPS) River Basin Management Platform 50 0 Purpose Driven Studies 50 C2 D D1 D2 D3 D4 Institution and Capacity Enhancement Development of Knowledge Center National and International Training, Workshop, Seminar, Study Tours Establishment Cost for SPMU Incremental Staff Cost 252 200 28 12 12 GROSS 1427
Status of Physical progress Status of Physical progress 1. BID DOCUMENTS OF VARIOUS ACTIVITIES AS PER PP 2017-18 ARE UNDER PROCESS. 2. NO PHYSICAL PROGRESS ACHIEVED SO FAR.
Status of Bid Document Status of Bid Document PROCUREMENT PLAN OF BENGAL (SW) DURING 2017-18 Date of Initiating the Process Sl. No. Procurement Type Procurement Method Bank Review Expected Award Date Package Name Present Status Development of RTDAS for River Sub-Basins and Major Dams in West Bengal Procurement of Discharge measuring Equipment including Development of Rating Curves for and Assessment of Siltation 1 Goods NCB Prior 10-Jul-17 11-Oct-17 Bid Document uploaded in MIS 2 Goods NCB Prior 24-Jul-17 11-Oct-17 3 Survey Works in connection with Establishment of Benchmarks Goods NCB Prior 24-Jul-17 11-Oct-17 Bid Document under preparation Bid Document uploaded in MIS Bid Document under preparation 4 Procurement of Survey Instruments Goods NCB Prior 12-Jul-17 11-Sep-17 5 Procurement of SCADA System for Durgapur Barrage Goods NCB Prior 27-Jun-17 13-Oct-17 6 Construction of State Data Center at Kolkata Civil Works NCB Prior 2-Aug-17 16-Oct-17 7 Construction of Regional Data Center at Durgapur Civil Works NCB Prior 21-Jul-17 18-Sep-17 do 8 Procurement of GIS Software for River Research Institute Goods Shopping Prior 11-Aug-17 11-Oct-17 do 9 Procurement of Geotechnical Software for River Research Institute Goods Shopping Prior 14-Aug-17 11-Oct-17 do 10 Digitization of Data NCS Shopping Prior 17-Aug-17 25-Oct-17 do 11Development of Mobile Apps for Surface Water Resources Information System Goods Shopping Prior 17-Jul-17 11-Oct-17 do 12Procurement of Consultant in connection with PDS for Environmental Flow in Sundarban Direct Contracting Decision of NIH Pending CS Prior 21-Jul-17 15-Sep-17 13Procurement of Consultant in connection with PDS for Kangsabati Reservoir Sedimentation Assessment Direct Contracting CS Prior 19-Jul-17 23-Aug-17 Not recommended 14Civil works related to Infrastructural Development of River Research Institute Bid Document under preparation Civil Works NCB Prior 17-Jul-17 18-Sep-17 15 Furnishing works for State Data Center at Kolkata Goods Shopping Prior 21-Aug-17 6-Nov-17 do 16 Procurement of ITC equipment for State Data Center at Kolkata Goods Shopping Prior 27-Jul-17 18-Sep-17 do Procurement of Consultant for Technical and Financial Management Support to SPMU 17 CS Shopping Prior 21-Jul-17 15-Sep-17 Not required 18Procurement of Tidal Gauge Sensors and Salinity Sensors Equipment in connection with PDS for Environmental Flow in Sundarban Goods NCB Prior 3-Aug-17 23-Oct-17 Related with PDS
Status of Various Studies / PDS Status of Various Studies / PDS PDS FOR ENVIRONMENTAL FLOW IN SUNDARBAN: APPROVAL PENDING FROM NIH. PDS FOR KANGSABATI RESERVOIR: PRESENTED DURING FIRST R&D SESSIONS ON 13-14 TH JULY 2017 AT NIH, ROORKEE. THE PROPOSAL HAS NOT BEEN RECOMMENDED BY THE EXPERT COMMITTEE.
Status of Data entry in E Status of Data entry in E- -SWIS SWIS REGISTRATION IN E-SWIS IS UNDER PROCESS. REQUEST FOR LOG IN ID AND PASSWORD SENT TO NPMU ON 10/08/2017.
Status of Hydro Status of Hydro- -met Stations met Stations 1. ORDINARY RAIN GAUGE SITES UNDER I&WD PROPOSED TO BE UPGRADED IN NHP : 39 NOS. 2. NEWLY PROPOSED RAIN GAUGE SITES IN NHP : 15 NOS. 3. ORDINARY RIVER GAUGE SITES UNDER I&WD PROPOSED TO BE UPGRADED IN NHP : 44 NOS. 4. NEWLY PROPOSED RIVER GAUGE SITES TO BE UPGRADED IN NHP : 27 NOS. (LIST OF 54 NOS. METEOROLOGICAL MONITORING STATIONS AND 71 NOS. HYDROLOGICAL MONITORING STATIONS WAS SENT TO CE, TBO, CWC, SILIGURI, DARJEELING FOR VETTING ON 30TH MAY, 2017 FOR RECONCILIATION)
Status of State WRIS Status of State WRIS BID DOCUMENTS RELATED TO SUPPLY, INSTALLATION AND COMMISSIONING OF INTEGRATED GIS AND MOBILE BASED SURFACE WATER RESOURCE INFORMATION SYSTEM FOR WEST BENGAL IS UNDER PREPARATION. BID DOCUMENT OF DIGITIZATION OF DATA IS UNDER PREPARATION BID DOCUMENT FOR PROCUREMENT OF 150 NOS. MOBILE PHONES IS UNDER PREPARATION.
Status of PFMS Status of PFMS Jalasampad Bhawan 24 Parganas (North) Executive Engineer, Burdwan Investigation & Planning Division, I&WD DDO 0342 2646799 23370281 8900890704