Site Analysis for Construction of Mixte Apartment Building at Gisenyi

Construction of  Mixte Apartment
Building at Gisenyi
   Plot N
o
 59
   Gisenyi/ Rubavu
 
 
OWNER :
Mr. RUTAGANDA IGNACE
                                  
                                  
TITLE :
TITLE :
                               
                               
SITE ANALYSIS
SITE ANALYSIS
 
PROJECT 
 ON GOOGLE MAP LOCATION
 
Project analysis
Level                           Usage                     Area (m
2
)
Ground floor area                                       Apartment unit                                          228
First floor area                                            Apartment units                                       127
 
TOTAL AREA                                                                                        455
 
 
At maximum Capacity, the Project shall hold  18 Couple
Number floors: 2FLOORS  (G+1)
Plot area : 475 sqm
Total floor area  :455 sqm
Number of parking  : 3
 
 
 
 
 
 
 
 
 
 
 
 
 
Neighbourhood
context
The project is located in an area
with new developments as well as
others that have been there for
long time ago..
The plot neighbors also the ancient
residential houses in the 
North
 and
Est. , and the Road to the 
West
 .
 
NEIGBHOURING PLOTS
- South : 58
- North : Plot 60
- East : Plot No  53
- West : Road
 
 
 
 
 
 
 
SITE ANALYSIS
Hydrology, Soils and land cover and
land tenure
The elevation of the site is about 1400 above sea level
The plot on  there are some old constructions need to be demolished then to prepare the plot ;this
means the preliminary works and including evacuation of all debris material on the ground.
 
The soils of the site are composed of loamy soil with sandy soil in some places. 
There are some small
cut  trees on the area of the plot. There is no more natural vegetation on the plot . The surrounding
area is comprised of buildings and roads.
 
On the hydrological point of view , the nearby wetland is located to the South of the plot  in around
1500m away. There is lake of kivu  and Sebeya river  in the south of the project site..
 
ACCESS TO
INFRASTRUCTURES
Water Supply / Sanitation
The main water supply in settlements surrounding the study area is from the
network managed by EUCL. Like the most of RUBAVU, the project area
does not have a centralized sewerage network. The secondary water
supply will be from the RC under ground water tank and plastic tank on
area slab.
 
Power Supply
Like the existing houses the project has a direct connection to the national
electricity grid managed by REG. It will be supported by a owner’s standby
generator in case of power cut off.
 
Access road
 The project has a direct access to the secondary road and enough parking
space for customers and visitors.
Slide Note
Embed
Share

Site analysis details the location, project analysis, owner information, neighboring plots, soil composition, hydrology, access to infrastructures like water supply and power, and more. The project is owned by Mr. Rutaganda Ignace and is planned for Gisenyi in Rubavu, Western Province. The site elevation is approximately 1400 meters above sea level with nearby wetlands and water bodies. Infrastructure access includes water supply from EUCL network and power from the national grid managed by REG.

  • Site Analysis
  • Construction
  • Apartment Building
  • Gisenyi
  • Infrastructure

Uploaded on Aug 03, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. OWNER : Mr. RUTAGANDA IGNACE TITLE : SITE ANALYSIS Construction of Mixte Apartment Building at Gisenyi Plot No59 Gisenyi/ Rubavu

  2. PROJECT ON GOOGLE MAP LOCATION

  3. Project analysis Level Usage Area (m2) Ground floor area Apartment unit 228 First floor area Apartment units 127 TOTAL AREA 455 At maximum Capacity, the Project shall hold 18 Couple Number floors: 2FLOORS (G+1) Plot area : 475 sqm Total floor area :455 sqm Number of parking : 3

  4. Project Location The project will be located in Gisenyi -Rubavu Neighbourhood context Western Province District : Rubavu Sector : Gisenyi Cell :Amahoro Plot No : 59 The project is located in an area with new developments as well as others that have been there for long time ago.. The plot neighbors also the ancient residential houses in the North and Est. , and the Road to the West . Project owner The project is owned by Mr. RUTAGANDA IGNACE NEIGBHOURING PLOTS - South : 58 - North : Plot 60 - East : Plot No 53 - West : Road The plot measures about 475 m2 and it is bordered by only one only road on one of its four sides . .

  5. SITE ANALYSIS Hydrology, Soils and land cover and land tenure The elevation of the site is about 1400 above sea level The plot on there are some old constructions need to be demolished then to prepare the plot ;this means the preliminary works and including evacuation of all debris material on the ground. The soils of the site are composed of loamy soil with sandy soil in some places. There are some small cut trees on the area of the plot. There is no more natural vegetation on the plot . The surrounding area is comprised of buildings and roads. On the hydrological point of view , the nearby wetland is located to the South of the plot in around 1500m away. There is lake of kivu and Sebeya river in the south of the project site..

  6. ACCESS TO INFRASTRUCTURES Water Supply / Sanitation The main water supply in settlements surrounding the study area is from the network managed by EUCL. Like the most of RUBAVU, the project area does not have a centralized sewerage network. The secondary water supply will be from the RC under ground water tank and plastic tank on area slab. Power Supply Like the existing houses the project has a direct connection to the national electricity grid managed by REG. It will be supported by a owner s standby generator in case of power cut off. Access road The project has a direct access to the secondary road and enough parking space for customers and visitors.

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#