Mobile Emission Reduction Credits

undefined
 
Mobile Emission Reduction Credits
Incentives and Expanding Participation
5/16/2023
 
 
 
 
Getting Started
Networking with the County – uncovering opportunities
Maricopa County & EPA Region 9
Tesla
Intel Expansion
Taiwan Semi-conductor
Brainstorming ERC Ideas with Intel and Consultants on Stationary Sources
Credits for sources shut-down = 2 IC Engines
Upgrading Flares from Utility to Enclosed
Engine Plant Upgrades
Then
 selected WM’s CNG Trucks (Corp Initiative to Replace Diesel 1/10
th
 Emissions)
 
 
 
 
The Process
Approvable Methodology- 
General Reluctance for Mobile Credits
EPA Standards ERCs – Real, Quantifiable, Voluntary, Permanent & Enforceable
No Regulatory Path for MERCs but
County and EPA agreement on calculation and using permit modifications
Precedence In San Diego and Texas
Lead to a MERC Rule in Maricopa County, and maybe useful for Other Districts
Key Steps along the way
Agencies Agree on the Regulatory Path
Methodology of the Emissions Calculations & Load Factors
Permit Conditions
Contracting ERCs between Intel and WM
Maricopa Certified MERC
ADEQ ERC Banking System
 
 
 
 
On-going effort for the life of the credits
Permit Modifications with the CNG trucks listing
Maintain 225 trucks and pull in replacements for retired units
Tracking and retain records of the Scrap/Disposal of the retired units to show they are not operating
Operating and Maintenance Records
Mileage tracking with GPS and Ipad driver logs
WM Compass data base logs mileage and service/repairs
Prepare spreadsheets listing the trucks, mileage and maintenance on a monthly basis
Perform Annual Emission Calculations and Reporting
 
 
 
 
Thinking Green – and even Greener
Closing
We need to look at all the “tools” impact the valley vehicle smog and Non-Attainment Area
Paving the way for recognition of MERC’s
Using an incentive-based system which will expand participation to reduce emissions
Creates new partnerships, WM new partner with Intel
Further enhance our agency relationships by teaming with Maricopa County, ADEQ, Region 9 EPA
Sources can get additional funding for upgrades/advancements that reduce emissions
Slide Note
Embed
Share

Explore the processes and initiatives aimed at expanding participation in mobile emission reduction credit programs. Learn about strategies involving incentives, partnerships, and regulatory pathways to enhance environmental sustainability and reduce emissions in Maricopa County and beyond.

  • Emission reduction
  • Mobile credits
  • Sustainability
  • Environmental initiatives

Uploaded on Apr 18, 2024 | 2 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Mobile Emission Reduction Credits Incentives and Expanding Participation 5/16/2023

  2. Getting Started Networking with the County uncovering opportunities Maricopa County & EPA Region 9 Tesla Intel Expansion Taiwan Semi-conductor Brainstorming ERC Ideas with Intel and Consultants on Stationary Sources Credits for sources shut-down = 2 IC Engines Upgrading Flares from Utility to Enclosed Engine Plant Upgrades Then selected WM s CNG Trucks (Corp Initiative to Replace Diesel 1/10th Emissions) 2

  3. The Process Approvable Methodology- General Reluctance for Mobile Credits EPA Standards ERCs Real, Quantifiable, Voluntary, Permanent & Enforceable No Regulatory Path for MERCs but County and EPA agreement on calculation and using permit modifications Precedence In San Diego and Texas Lead to a MERC Rule in Maricopa County, and maybe useful for Other Districts Key Steps along the way Agencies Agree on the Regulatory Path Methodology of the Emissions Calculations & Load Factors Permit Conditions Contracting ERCs between Intel and WM Maricopa Certified MERC ADEQ ERC Banking System 3

  4. On-going effort for the life of the credits Permit Modifications with the CNG trucks listing Maintain 225 trucks and pull in replacements for retired units Tracking and retain records of the Scrap/Disposal of the retired units to show they are not operating Operating and Maintenance Records Mileage tracking with GPS and Ipad driver logs WM Compass data base logs mileage and service/repairs Prepare spreadsheets listing the trucks, mileage and maintenance on a monthly basis Perform Annual Emission Calculations and Reporting 4

  5. Thinking Green and even Greener Closing We need to look at all the tools impact the valley vehicle smog and Non-Attainment Area Paving the way for recognition of MERC s Using an incentive-based system which will expand participation to reduce emissions Creates new partnerships, WM new partner with Intel Further enhance our agency relationships by teaming with Maricopa County, ADEQ, Region 9 EPA Sources can get additional funding for upgrades/advancements that reduce emissions 5

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#