IRBNet Account Setup and COI Process Guide

 
Ensure you have an IRBNet Account   -    
gov.irbnet.org
If you do not already have an account   
-   
Self register here
 
Ideally a Study Coordinator will do the ‘Submitting’.  However, anyone with 
Full Access
 to the project in
IRBNet can 
Create a Package
, 
Link
 
all
 applicable forms, and 
Submit
 
There will 
always be 2 Packages
 for 
New Projects
, Continuing Reviews, & Amendments- 
adding Investigators
1.
First Package
 will contain 
ALL
 the applicable ‘
Linked’
 Disclosures
2.
Second Package
 will contain all applicable documents required by the primary review/approval board
Linked Disclosures should be created/updated not-earlier-than 120 days prior to submission in IRBNet
Disclosure Packages should be Submitted 
just before 
the corresponding New Project, Continuing Review, or
Amendment Package,   
(hours to days but 
NOT
 months please)
 
Packages containing Linked Disclosures should 
NOT
 be submitted to any other Review Boards except the
Conflict of Interest Review Board
 
COI process for New
Projects
 
 
N
e
w
 
P
r
o
j
e
c
t
 
1
 
2
 
3
 
3.1
Select
Step 1 
- Create New Project
This creates Package #1 that is to contain a 
VA Project Cover
Sheet (PCS)
 and 
ALL
 applicable
 
Disclosures
 
for submittal to the
Conflict of Interest Review Board 
ONLY!
 
This should be done 
just before 
submitting the corresponding
New Project Package, (#2) to its appropriate Review Board
 
(hours to days before, 
NOT
 months please)
Step 2
 - Create PCS 
via the Wizard, listing ALL team
members and their respective Roles
The COI Administrator will reference the PCS to validate COIs
Step 3 - Share
 this Project 
w/team members listed on PCS
 
Investigators 
MUST
 be shared to the project in order to
   create their Disclosure
Strategize and 
select 
the appropriate
Access Type per each team member’s
role/expectations
Select
Select
TIP:
 
Indicate your Investigators here.  This will
remind you from whom you expect COI Disclosures.
Select
TIP:  
Select 
Investigators
 
first,
add Comments to inform that a
COI is required, & Save, then go
back & give access to any others
w/different comments
Please create COI via IRBNet
-Sponsor=None
-Funding= None
-Cooperative Study? 
No/Yes
 
N
e
w
 
P
r
o
j
e
c
t
 
4
 
4.1
 
5
 
5.1
Select
Select
Be sure the correct 
Purpose
 and 
Status
 are indicated
When Linking a Disclosure, the Status should 
always
be “(
Not Submitted
)”.
Select
Select
Step 4
 - 
Link COI Disclosures 
via Designer.
-
Hopefully
, Investigators  will  reply to the email you
sent when you granted access, to let you know they
have created their Disclosure.  You can also check here.
Submit this Package to the
Conflict of Interest Review Board 
ONLY!
Select
Step 5 
– Submit this Package   
However, 
DO NOT 
submit until
 
1.
 
ALL
 applicable Disclosures are Linked! 
- 
see the value in the note?
2.
 
You are reasonably ready to submit corresponding New Project
    Package
 
N
e
w
 
P
r
o
j
e
c
t
 
5.2
 
6
 
7
Select
Not required but
appreciated
Select
Select
  Create a New Package 
containing required documents
  for submittal to the appropriate review/approval Board.
This package must 
NOT 
have
COI Disclosures Linked
!
Great! your New Project
COIs are ‘Submitted’
 
Packages containing ‘Linked’ COI Disclosures are to be
submitted to the 
COI Board 
Only
!
  If a package is submitted
to another board containing COI Disclosures, you will be
instructed to “Un-link” them from that Package.
 
To continue preparing your project for submission you
MUST
 
Create a New Package (#2)!
 
 
 
 
For Example, see remaining slides:
1.
Attach required documents 
IAW instructions
related to the type of project you are proposing
2.
Sign this Package
3.
Submit this Package
Sign
then
Submit
 
N
e
w
 
P
r
o
j
e
c
t
 
9
Select
Not required but
appreciated
Select
Project History 
shows the status of each
Package throughout the life of a project.
 - Pay attention to the view options
This Package to be submitted to the appropriate
Board for project review/approval 
ONLY!
Remember, COIs were already submitted to
the COI Board in a previous Package
 
8
Select
Shows the status of the
most recent
 Disclosure
Submission
 
COI process for
Amendments
 
(When adding an investigator or co-investigator)
 
A
m
e
n
d
m
e
n
t
 
t
h
a
t
 
A
d
d
s
 
a
n
 
I
n
v
e
s
t
i
g
a
t
o
r
 
1
 
2
 
3
 
4
Select
Step 2
 – Update the Project Cover Sheet (PCS) 
via Designer
Add
 the Investigators and their respective Roles
The COI Administrator will reference the PCS to validate Linked COIs
Step 3 - Share
 this Project 
with added Investigators
Investigators 
MUST
 be shared to the project in order to
   create their COI Disclosure
Strategize and 
select 
the appropriate
Access Type per each team member’s
role/expectations
Select
Select
Invs= AR
Select
Step 4
 - 
Link COI Disclosures 
via Designer.
-
Hopefully
, Investigators will reply to the email you sent
when you granted access to let you know they have
created their Disclosure.     You can also check here.
TIP:
 Indicate your added Investigators here.  This will
remind you from whom you expect COI Disclosures.
Step 1 
- Create a New Package
This creates a Package that you will Link ALL applicable
Disclosures
 
to for submittal to the 
Conflict of Interest Review
Board 
ONLY!
 
This should be done 
just before 
 
submitting the corresponding
Amendment Package to its appropriate Review Board
 
(hours to days before, 
NOT
 months please)
TIP: 
The user will receive an
email when granted access…
 
Select 
Investigators, 
add
Comments to inform that a
COI is required, & Save
.
Please create COI via IRBNet
-Sponsor= None
-Funding= None
-Cooperative Study? 
No/Yes
 
A
m
e
n
d
m
e
n
t
 
t
h
a
t
 
A
d
d
s
 
a
n
 
I
n
v
e
s
t
i
g
a
t
o
r
 
4.1
 
5
 
5.1
 
5.2
Select
Select
Be sure the correct 
Purpose
 and 
Status
 are indicated
 
When Linking a Disclosure, the Status should 
always
be “(
Not Submitted
)”.
Select
Select
Submit this Package to the
Conflict of Interest Review Board 
ONLY!
Select
Select
Not required but
appreciated
Step 5 
– Submit this Package   
However, 
DO NOT 
submit until
 
1.
 
ALL
 applicable Disclosures are Linked! 
- 
see the value in the note?
2.
 
You are ready to create & submit corresponding Amendment Package
 
A
m
e
n
d
m
e
n
t
 
t
h
a
t
 
A
d
d
s
 
a
n
 
I
n
v
e
s
t
i
g
a
t
o
r
 
6
 
7
Select
  Create a New Package 
containing required documents
  for submittal to the appropriate review/approval Board
1.
Attach required documents 
IAW instructions
from your committee of primary oversight
2.
Sign this Package
3.
Submit this Package
This package must 
NOT 
have
COI Disclosures Linked
!
Great! your Amendment
COIs are ‘Submitted’
 
Packages containing ‘Linked’ COI Disclosures are to be
submitted to the 
COI Board Only!
  If a package is submitted
to another board containing COI Disclosures, you will be
instructed to “Un-link” them from that Package.
 
To continue preparing your Amendment for submission,
review & approval you 
MUST
 
Create a New Package!
 
 
 
For Example, see remaining slides:
Sign
then
Submit
 
A
m
e
n
d
m
e
n
t
 
t
h
a
t
 
A
d
d
s
 
a
n
 
I
n
v
e
s
t
i
g
a
t
o
r
 
9
Select
Not required but
appreciated
Select
Project History shows the 
status of each
Package
 throughout the life of a project.
 - Pay attention to the view options
Remember, COIs were already submitted
to the COI Board in a previous Package
 
8
Select
This Package to be submitted to the appropriate
Board for review/approval 
ONLY!
Not required but
appreciated
Shows the status of
the 
most recent
Disclosure 
Submission
 
COI process for
Continuing Review
 
 
C
o
n
t
i
n
u
i
n
g
 
R
e
v
i
e
w
 
1
 
2
 
3
 
3.1
Select
Select
Select
Select
Select
Select
Invs= CR, KC, AR
Step 3
 - 
Link
 
COI Disclosures  
via  Designer.
-
Hopefully
, Investigators  will  reply to the email you
sent to let you know they have created their
Annual Disclosure.    You can also check here.
TIP:
 Indicate your Investigators here.  This will
remind you from whom you expect COI Disclosures.
Step 2
 – Notify Investigators 
to create their Annual COI
Disclosure for Continuing Review.  
Send Project Mail 
is
suggested
, provided Investigators check the email they used
when creating their IRBNet accounts - 
adjust accordingly.
Select
Step 1 
- Create New Package
This creates a package that you will Link 
ALL
 applicable
Disclosures to, for submittal to the 
Conflict of Interest Review
Board 
ONLY!
 
This should be done 
just before 
 
submitting the Continuing
Review Package
 
(hours to days before, 
NOT
 months please)
Please login to IRBNet and Create your Annual Disclosure for Continuing Review
Be sure the correct 
Purpose
 and 
Status
 are indicated
When Linking a Disclosure, the Status should 
always
be “(
Not Submitted
)”.
 
C
o
n
t
i
n
u
i
n
g
 
R
e
v
i
e
w
 
4
 
4.1
 
4.2
Select
Select
Select
Submit this Package to the
Conflict of Interest Review Board 
ONLY!
Invs= CR, KC, AR
Select
Not required but
appreciated
The Project Overview shows that ‘
Package 5’
in this Project has been submitted to the
Conflict of Interest Board
Step 4 
– Submit this Package   
However, 
DO NOT 
submit until
 
1.
 
ALL
 applicable Disclosures are Linked! 
- 
see the value in the note?
2.
 
You reasonably ready to create & submit corresponding CR Package
Also shows the status
of the 
most recent
Disclosure 
Submission
 
C
o
n
t
i
n
u
i
n
g
 
R
e
v
i
e
w
 
5
 
6
Select
  Create a New Package 
containing required documents
  for submittal to the appropriate Review Board.
This package must 
NOT 
have
COI Disclosures Linked
!
 
Packages containing ‘Linked’ COI Disclosures are to be
submitted to the 
COI Board Only!
  If a package is submitted to
another board containing COI Disclosures, you will be
instructed to “Un-link” them from that Package.
 
To continue preparing your Continuing Review for submission,
review & approval you 
MUST
 
Create a New Package!
 
 
 
For Example, see remaining slides:
Great! your Continuing Review
COIs are ‘Submitted’
1.
Attach required documents 
IAW instructions
from your committee of primary oversight
2.
Sign this Package
3.
Submit this Package
Sign
then
Submit
 
C
o
n
t
i
n
u
i
n
g
 
R
e
v
i
e
w
 
8
Select
Not required but
appreciated
Select
Project History shows the 
status of each
Package
 throughout the life of a project.
 - Pay attention to the view options
Remember, COIs were already submitted
to the COI Board in a previous Package
 
7
Select
This Package to be submitted to the appropriate
Board for review/approval 
ONLY!
Not required but
appreciated
 
COI process for Change
in Financial Status
 
When an investigator’s financial situation changes
 
I
n
t
e
r
i
m
,
 
I
n
v
e
s
t
i
g
a
t
o
r
 
s
i
t
u
a
t
i
o
n
 
c
h
a
n
g
e
 
1
 
2
 
3
Select
Step 1 – Create a New Package
This creates a package that you will Link the
applicable COI Disclosure for submittal to the
Conflict of Interest Review Board ONLY!
Select
Select
Step 2
 - 
Link COI Disclosure  
via  Designer.
-
In this situation the Investigator would have notified a
team member w/Full Access to the project, that he/she
updated their Disclosure, and it needs to be Submitted.
 
2.1
Select
Step 3 
– Submit this Package
However, 
DO NOT 
submit until 
the
applicable Disclosure is Linked.
Select
Be sure the correct 
Purpose
 and 
Status
 are indicated
When Linking a Disclosure, the Status should 
always
be “(
Not Submitted
)”.
 
I
n
t
e
r
i
m
,
 
I
n
v
e
s
t
i
g
a
t
o
r
 
s
i
t
u
a
t
i
o
n
 
c
h
a
n
g
e
 
3.2
Select
Not required but
appreciated
Select
The Project Overview shows that ‘
Package 7’ 
in this Project
has been submitted to the 
Conflict of Interest Board
Also shows the status
of the 
most recent
Disclosure 
Submission
 
3.1
Select
Submit this Package to the
Conflict of Interest Review Board 
ONLY!
Not required but
appreciated
The COI Administrator ‘Forwarded’ this
submission to OGC for determination
FAST FORWARD
Status remains Pending until
Ethics Review is complete
Slide Note
Embed
Share

Comprehensive instructions on setting up an IRBNet account, creating packages for new projects, continuing reviews, and amendments, as well as submitting linked disclosures to the Conflict of Interest Review Board. The guide also outlines the COI process for new projects, including creating a VA Project Cover Sheet (PCS) and sharing the project with team members.

  • IRBNet account setup
  • COI process
  • Conflict of Interest Review Board
  • Research project submission

Uploaded on Apr 02, 2024 | 3 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Ensure you have an IRBNet Account - gov.irbnet.org If you do not already have an account - Self register here Ideally a Study Coordinator will do the Submitting . However, anyone with Full Access to the project in IRBNet can Create a Package, Link all applicable forms, and Submit There will always be 2 Packages for New Projects, Continuing Reviews, & Amendments- adding Investigators 1. First Package will contain ALLthe applicable Linked Disclosures 2. Second Package will contain all applicable documents required by the primary review/approval board Linked Disclosures should be created/updated not-earlier-than 120 days prior to submission in IRBNet Disclosure Packages should be Submitted just before the corresponding New Project, Continuing Review, or Amendment Package, (hours to days but NOT months please) Packages containing Linked Disclosures should NOT be submitted to any other Review Boards except the Conflict of Interest Review Board

  2. COI process for New Projects

  3. New Project New Project Select Step 2 - Create PCS via the Wizard, listing ALL team members and their respective Roles The COI Administrator will reference the PCS to validate COIs Step 1 - Create New Project This creates Package #1 that is to contain a VA Project Cover Sheet (PCS) and ALL applicableDisclosuresfor submittal to the Conflict of Interest Review Board ONLY! This should be done just before submitting the corresponding New Project Package, (#2) to its appropriate Review Board (hours to days before, NOT months please) 2 1 Select Strategize and select the appropriate Access Type per each team member s role/expectations Select Step 3 - Share this Project w/team members listed on PCS Investigators MUST be shared to the project in order to create their Disclosure 3 3.1 Please create COI via IRBNet -Sponsor=None -Funding= None -Cooperative Study? No/Yes Suggested Select

  4. New Project New Project Be sure the correct Purpose and Status are indicated When Linking a Disclosure, the Status should always be (Not Submitted) . Step 4 - Link COI Disclosures via Designer. - Hopefully, Investigators will reply to the email you sent when you granted access, to let you know they have created their Disclosure. You can also check here. Select 4 4.1 Select Select Step 5 Submit this Package However, DO NOT submit until 1.ALL applicable Disclosures are Linked! - see the value in the note? 2.You are reasonably ready to submit corresponding New Project Package Submit this Package to the Conflict of Interest Review Board ONLY! Select Check your work 5 5.1 Select

  5. New Project New Project Great! your New Project COIs are Submitted Packages containing Linked COI Disclosures are to be submitted to the COI Board Only! If a package is submitted to another board containing COI Disclosures, you will be instructed to Un-link them from that Package. Select To continue preparing your project for submission you MUSTCreate a New Package (#2)! 5.2 Select For Example, see remaining slides: 1. Attach required documents IAW instructions related to the type of project you are proposing Sign this Package Submit this Package Create a New Package containing required documents for submittal to the appropriate review/approval Board. 2. 3. Sign then Submit Select Example 6 7

  6. New Project New Project This Package to be submitted to the appropriate Board for project review/approval ONLY! Select Example 8 9 Select Select FYI Project History shows the status of each Package throughout the life of a project. - Pay attention to the view options Shows the status of the most recent Disclosure Submission

  7. COI process for Amendments (When adding an investigator or co-investigator)

  8. Amendment Amendment that Adds an Investigator that Adds an Investigator Step 1 - Create a New Package This creates a Package that you will Link ALL applicable Disclosuresto for submittal to the Conflict of Interest Review Board ONLY! Invs= AR Select Select This should be done just before submitting the corresponding Amendment Package to its appropriate Review Board Step 2 Update the Project Cover Sheet (PCS) via Designer Add the Investigators and their respective Roles The COI Administrator will reference the PCS to validate Linked COIs (hours to days before, NOT months please) 1 2 Step 3 - Share this Project with added Investigators Investigators MUST be shared to the project in order to create their COI Disclosure Strategize and select the appropriate Access Type per each team member s role/expectations Step 4 - Link COI Disclosures via Designer. - Hopefully, Investigators will reply to the email you sent when you granted access to let you know they have created their Disclosure. You can also check here. Select 3 4 Please create COI via IRBNet -Sponsor= None -Funding= None -Cooperative Study? No/Yes Suggested Select

  9. Amendment Amendment that Adds an Investigator that Adds an Investigator Step 5 Submit this Package However, DO NOT submit until 1.ALL applicable Disclosures are Linked! - see the value in the note? 2.You are ready to create & submit corresponding Amendment Package Be sure the correct Purpose and Status are indicated When Linking a Disclosure, the Status should always be (Not Submitted) . Select Select 5 4.1 Check your work Select Submit this Package to the Conflict of Interest Review Board ONLY! Select 5.2 5.1 Select Select

  10. Amendment Amendment that Adds an Investigator Great! your Amendment COIs are Submitted that Adds an Investigator Packages containing Linked COI Disclosures are to be submitted to the COI Board Only! If a package is submitted to another board containing COI Disclosures, you will be instructed to Un-link them from that Package. To continue preparing your Amendment for submission, review & approval you MUSTCreate a New Package! For Example, see remaining slides: 1. Attach required documents IAW instructions from your committee of primary oversight Sign this Package Submit this Package Create a New Package containing required documents for submittal to the appropriate review/approval Board 2. 3. Sign then Submit Select Example 6 7

  11. Amendment Amendment that Adds an Investigator that Adds an Investigator This Package to be submitted to the appropriate Board for review/approval ONLY! Select Example 8 9 Select Select FYI Project History shows the status of each Package throughout the life of a project. - Pay attention to the view options Shows the status of the most recent Disclosure Submission

  12. COI process for Continuing Review

  13. Continuing Review Continuing Review Step 1 - Create New Package This creates a package that you will Link ALL applicable Disclosures to, for submittal to the Conflict of Interest Review Board ONLY! Select Select This should be done just before submitting the Continuing Review Package (hours to days before, NOT months please) Step 2 Notify Investigators to create their Annual COI Disclosure for Continuing Review. Send Project Mail is suggested, provided Investigators check the email they used when creating their IRBNet accounts - adjust accordingly. Please login to IRBNet and Create your Annual Disclosure for Continuing Review 1 2 Suggested Select Be sure the correct Purpose and Status are indicated When Linking a Disclosure, the Status should always be (Not Submitted) . Invs= CR, KC, AR Select Step 3 - LinkCOI Disclosures via Designer. - Hopefully, Investigators will reply to the email you sent to let you know they have created their Annual Disclosure. You can also check here. Select Select 3.1 3 Select

  14. Continuing Review Continuing Review Step 4 Submit this Package However, DO NOT submit until 1.ALL applicable Disclosures are Linked! - see the value in the note? 2.You reasonably ready to create & submit corresponding CR Package Invs= CR, KC, AR Select Submit this Package to the Conflict of Interest Review Board ONLY! 4.1 4 Check your work Select FYI Select The Project Overview shows that Package 5 in this Project has been submitted to the Conflict of Interest Board 4.2 Select Also shows the status of the most recent Disclosure Submission

  15. Continuing Review Continuing Review Great! your Continuing Review COIs are Submitted Packages containing Linked COI Disclosures are to be submitted to the COI Board Only! If a package is submitted to another board containing COI Disclosures, you will be instructed to Un-link them from that Package. To continue preparing your Continuing Review for submission, review & approval you MUSTCreate a New Package! For Example, see remaining slides: 1. Attach required documents IAW instructions from your committee of primary oversight Sign this Package Submit this Package Create a New Package containing required documents for submittal to the appropriate Review Board. 2. 3. Sign then Submit Select Example 5 6

  16. Continuing Review Continuing Review This Package to be submitted to the appropriate Board for review/approval ONLY! Select Example 7 8 Select Select - Pay attention to the view optionsFYI Project History shows the status of each Package throughout the life of a project.

  17. COI process for Change in Financial Status When an investigator s financial situation changes

  18. Interim, Interim, Investigator situation change Investigator situation change Step 1 Create a New Package This creates a package that you will Link the applicable COI Disclosure for submittal to the Conflict of Interest Review Board ONLY! Step 2 - Link COI Disclosure via Designer. - In this situation the Investigator would have notified a team member w/Full Access to the project, that he/she updated their Disclosure, and it needs to be Submitted. Select Select 1 2 Be sure the correct Purpose and Status are indicated When Linking a Disclosure, the Status should always be (Not Submitted) . Step 3 Submit this Package However, DO NOT submit until the applicable Disclosure is Linked. Select Select 3 2.1 Select Check your work

  19. Interim, Interim, Investigator situation change Investigator situation change Submit this Package to the Conflict of Interest Review Board ONLY! Select 3.1 3.2 Select Select FYI The COI Administrator Forwarded this submission to OGC for determination The Project Overview shows that Package 7 in this Project has been submitted to the Conflict of Interest Board Also shows the status of the most recent Disclosure Submission Status remains Pending until Ethics Review is complete

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#