Installations and Commissioned APP Tutorial

 
Installations and
Commissioned APP Tutorial
 
How to download?
 
Go to the play stope app and search
for installation & commisioned app,
click install.
Allow permissions and you are all
set.
 
Enter the phone number
with which a user ID is
create.
Enter the 4-digit OTP
generated and sent to
the user's mobile.
Click "Confirm OTP"
 
LOGGING IN
 
Upon logging in, the user will
be displayed the home screen
with all meters' count and each
meter status (the status is null
for a fresh user with counts
being zero)
There is also a dashboard with
the necessary modules as
shown.
 
HOMESCREEN AND DASHBOARD
 
To install a meter, click the scan
SC QR code on the. Bottom of
the home screen
 
Scan the QR code of the
already surveyed SC point.
 
Confirm the details of the
Service connection and select
"Done"
 
INSTALLATION OF A METER
 
Click "scan the barcode of
the meter"
Scan the meter barcode.
 
Be within 30 meter range of
the survey point without fail
 
Upload at least 2 images of the
meter erected onto the pole.
 
Check all details and select
"Next"
 
INSTALLATION PROCESS PT 2
 
Select yes to map the Meter to
the service connection
 
Success! The meter is now
verified
 
The user can view the details
of the mapped device in the
home screen
 
INSTALLATION PROCESS PT 3
 
There is a filter called
commission Meters in the
dashboard of meters with
different status. (refer
Commission status slide)
 
Selecting the status will filter out the results of
the installed meters as shown above
By filtering out pending meters, the user can
easily find out the meters that can me
commissioned.
 
FILTERING METERS BY STATUS
 
FIND MY ROUTE – GPS TRACKER
 
Find my route is a feature that
allows an installer to find the
exact meter location via maps.
 
Click on get directions under
the meter that you want to
visit.
 
Access the location of the
installed meter and start the
navigation.
 
COMMISSIONING OF A METER
 
Click on the meter that
needs to be commissioned.
Scan the Barcode or enter
the meter s.no
 
Scan the barcode of the
meter
 
Check the meter
details and select
continue
 
Make sure to be in range
of the meter.
 
COMMISIONING OF A METER PT 2
 
Upload at least two images in each field.
Select Test Meter & Save
After uploading the images and entering the remarks, select "Test meter and save".
 
FINISHING STAGES OF COMMISSIONING
 
Select OK and finish
the commission
process
 
After the commission has been initiated,
Submit the ones with the test result as
success and retry the meters which have
failed (Submit them if the test is successful on
the second attempt).
 
HES TEST
 
COMMISSION STATUS
 
COMMISSION STATUS EXPLAINED
 
Thank You!!
Slide Note
Embed
Share

Learn how to download and use the Installations and Commissioned App tutorial. Follow detailed instructions on downloading the app, logging in, navigating the home screen and dashboard, meter installation process, mapping devices, filtering meters by status, and more for efficient use of the app.

  • Tutorial
  • Installation
  • Commissioned App
  • App Guide
  • Meter Installation

Uploaded on Mar 19, 2024 | 3 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Installations and Commissioned APP Tutorial

  2. How to download? Go to the play stope app and search for installation & commisioned app, click install. Allow permissions and you are all set.

  3. LOGGING IN Enter the phone number with which a user ID is create. Enter the 4-digit OTP generated and sent to the user's mobile. Click "Confirm OTP"

  4. HOMESCREEN AND DASHBOARD Upon logging in, the user will be displayed the home screen with all meters' count and each meter status (the status is null for a fresh user with counts being zero) There is also a dashboard with the necessary modules as shown.

  5. INSTALLATION OF A METER To install a meter, click the scan SC QR code on the. Bottom of the home screen Scan the QR code of the already surveyed SC point. Confirm the details of the Service connection and select "Done"

  6. INSTALLATION PROCESS PT 2 Click "scan the barcode of the meter" Scan the meter barcode. Be within 30 meter range of the survey point without fail Upload at least 2 images of the meter erected onto the pole. Check all details and select "Next"

  7. INSTALLATION PROCESS PT 3 The user can view the details of the mapped device in the home screen Select yes to map the Meter to the service connection Success! The meter is now verified

  8. FILTERING METERS BY STATUS There is a filter called commission Meters in the dashboard of meters with different status. (refer Commission status slide) Selecting the status will filter out the results of the installed meters as shown above By filtering out pending meters, the user can easily find out the meters that can me commissioned.

  9. FIND MY ROUTE GPS TRACKER Find my route is a feature that allows an installer to find the exact meter location via maps. Click on get directions under the meter that you want to visit. Access the location of the installed meter and start the navigation.

  10. COMMISSIONING OF A METER Check the meter details and select continue Make sure to be in range of the meter. Scan the barcode of the meter Click on the meter that needs to be commissioned. Scan the Barcode or enter the meter s.no

  11. COMMISIONING OF A METER PT 2 Upload at least two images in each field. Select Test Meter & Save After uploading the images and entering the remarks, select "Test meter and save".

  12. FINISHING STAGES OF COMMISSIONING Select OK and finish the commission process

  13. HES TEST After the commission has been initiated, Submit the ones with the test result as success and retry the meters which have failed (Submit them if the test is successful on the second attempt).

  14. COMMISSION STATUS

  15. COMMISSION STATUS EXPLAINED Pending For Commission Commission Initiated Pending for Approval Commission Approved Commission Rejected Meter is installed but not commissioned. Commission is initiated but it is not submitted for approval Commission request is submitted and is pending for approval. Commission request is Approved Commission request is rejected due to inaccuracy/insuffi cient data.

  16. Thank You!!

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#