Tutorial for EPDCL Survey App: How to Use Survey Lite App for Data Collection

 
EPDCL Survey App
Tutorial
undefined
 
How to Download ?
 
Download 
Survey Lite
 (EPDCL)
 
App
 from Play store
 
 
Note : Allow all the Permissions
while installing
 
Survey Lite App Login Page
 
Enter 
the credentials provided to the
user.
 
After logging in, a dashboard
and the assigned feeders will
be visible.
Click on 
Pending Surveys 
to
start uploading the points.
 
Dashboard Of Survey Lite App
 
       
 Pending surveys
 
In this page, you will find the list of feeders
Assigned to Users Click on 
Start Survey 
to
upload points on a newly assigned feeder
.
Once a survey is started, user will get 
Resume
Survey.
Once a feeder is complete, the
 end survey
option moves the feeder from pending surveys
onto the completed surveys
.
 
How to add 
DTR POINT
 
Capture Location of 
DTR 
in
 Map
View
 
Upload the Image of 
DTR Sticker
 
Click on +
 
Select the 
Point type 
as 
DTR
Enter 
DTR Serial Number
 
Fill the Details on 
DTR
Sticker 
and stick to the
Pole & stick 
protective
sticker 
above DTR
sticker.
 
Check the Signal
Strength
 
Upload the DTR Serial
no and  images up to 4
Images
 
Check the
Captured location
of DTR
 
DTR Mapping and Images
 
Select 
Capacity of DTR 
from the dropdown list
 
Write the Remarks of DTR Condition
 
DTR Questionnaire
 
DTR Questionnaire
 
Is there an Existing
meter installed at
location please Click on
Yes/No
 
If you click on ‘No’
Select the size of the pole
 
If you click on ‘Yes’
Enter the DTR Make and
Serial No
Click on Existing Meter
type
 
DTR Questionnire
 
Enter the Equipment
Number & DTR Make
Enter Serial no of the DTR
Click on Toggle button
LT,HT & AB switch
 
Select the 
Pole
size 
from the
dropdown list
 
Scan the 
QR Code
of DTR sticker
which filled with
DTR information
 
Once the 
DTR QR is
scanned
 the DTR point
information is saved
successfully.
 
How to add Service Connection Point
 
Select Point type as 
Service Connection
Select 
Backlink Point
 as 
DTR
Check
 Backlink point DTR 
that is associated with the service (note: Check the point
correctly to avoid accuracy issues)
 
Upload the image 
of Service connection Sticker
Fill the Details on 
Service QR Sticker 
and stick to the Pole & stick
Weather protection seal 
above Service connection sticker.
 
Upload minimum 2 images
Of Borewell pipes, Motor &
Starter Panel.
 
Check the 
Service connection map
view Location
Check 
the Accuracy below 40
meters
Check the 
Signal strength
 
Service Connection Mapping with Images
 
Select on the 
Motor Status
Select
 the Motor Capacity from the Dropdown list
User must Click On 
MASTER SYNC (top right) 
to view the LT distribution Area from the
Dropdown list
 
Service Connection Questionnaire
 
Select Authorization
type
 
Select Yes/No for Is
meter already installed
? and Do you know the
USC number?
 
Here are the meter
no. Details with
linked USC numbers
 
Here is the dropdown menu
of all the Sc numbers in the
selected LT area
 
Service Connection Questionnaire
 
Scan the 
QR Code 
Of
service connection
 
Verify the Details 
of
Farmer and enter them in
the boxes.
 
Point Information
will be 
saved
Successfully
 
 
Select the Size of the Pole from the
dropdown List.
If there is an LT or LT-CT
meter present, the user must enter
the details and capture the image
 
Service Connection Questionnaire
 
Check the Points Captured
Note
 
: Don’t Click on End survey until feeder is completed.
Once the feeder is completed, you can end survey.
 
Upload the points Daily without any fail
 
Check the All-Uploaded Points while Adding the points
 
Thank you!!
 
Happy surveying!!
Slide Note
Embed
Share

This tutorial provides a step-by-step guide on using the Survey Lite App by EPDCL for efficient data collection. Learn how to download the app, login, access the dashboard, upload survey points, add DTR points, map DTRs, fill questionnaires, and more. Follow the detailed instructions with visual aids to streamline your data management process.

  • EPDCL
  • Survey Lite App
  • Data Collection
  • Tutorial
  • User Guide

Uploaded on Apr 07, 2024 | 10 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. EPDCL Survey App Tutorial

  2. How to Download ? Download Survey Lite (EPDCL) App from Play store Note : Allow all the Permissions while installing

  3. Survey Lite App Login Page Enter the credentials provided to the user.

  4. Dashboard Of Survey Lite App After logging in, a dashboard and the assigned feeders will be visible. Click on Pending Surveys to start uploading the points.

  5. Pending surveys In this page, you will find the list of feeders Assigned to Users Click on Start Survey to upload points on a newly assigned feeder. Once a survey is started, user will get Resume Survey. Once a feeder is complete, the end survey option moves the feeder from pending surveys onto the completed surveys.

  6. How to add DTR POINT Click on + Fill the Details on DTR Sticker and stick to the Pole & stick protective sticker above DTR sticker. Upload the Image of DTR Sticker Capture Location of DTR in Map View Select the Point type as DTR Enter DTR Serial Number

  7. DTR Mapping and Images Upload the DTR Serial no and images up to 4 Images Check the Captured location of DTR Check the Signal Strength

  8. DTR Questionnaire Write the Remarks of DTR Condition Select Capacity of DTR from the dropdown list

  9. DTR Questionnaire If you click on Yes Enter the DTR Make and Serial No Click on Existing Meter type Is there an Existing meter installed at location please Click on Yes/No If you click on No Select the size of the pole

  10. DTR Questionnire Enter the Equipment Number & DTR Make Enter Serial no of the DTR Click on Toggle button LT,HT & AB switch Scan the QR Code of DTR sticker which filled with DTR information Once the DTR QR is scanned the DTR point information is saved successfully. Select the Pole size from the dropdown list

  11. How to add Service Connection Point Select Point type as Service Connection Select Backlink Point as DTR Check Backlink point DTR that is associated with the service (note: Check the point correctly to avoid accuracy issues)

  12. Service Connection Mapping with Images Check the Service connection map view Location Check the Accuracy below 40 meters Check the Signal strength Upload the image of Service connection Sticker Fill the Details on Service QR Sticker and stick to the Pole & stick Weather protection seal above Service connection sticker. Upload minimum 2 images Of Borewell pipes, Motor & Starter Panel.

  13. Service Connection Questionnaire Select on the Motor Status Select the Motor Capacity from the Dropdown list User must Click On MASTER SYNC (top right) to view the LT distribution Area from the Dropdown list

  14. Service Connection Questionnaire Select Authorization type Select Yes/No for Is meter already installed ? and Do you know the USC number? Here is the dropdown menu of all the Sc numbers in the selected LT area Here are the meter no. Details with linked USC numbers

  15. Service Connection Questionnaire Verify the Details of Farmer and enter them in the boxes. Select the Size of the Pole from the dropdown List. If there is an LT or LT-CT meter present, the user must enter the details and capture the image Point Information will be saved Successfully Scan the QR Code Of service connection

  16. Check the Points Captured Note : Don t Click on End survey until feeder is completed. Once the feeder is completed, you can end survey. Upload the points Daily without any fail

  17. Check the All-Uploaded Points while Adding the points

  18. Thank you!! Happy surveying!!