Efficient Sales and Inventory Operation Planning Tools

Slide Note
Embed
Share

Streamline your sales, inventory, and operation planning with the help of advanced tools such as forecasting, material planning, and cash flow analysis. Ensure accurate representation of sales forecasts to enhance efficiency and optimize production capacities.


Uploaded on Sep 14, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Sales & Inventory Operation Planning (SIOP) XA tools to assist with Forecasting, Material Planning & Cash Flow Analysis

  2. Sales & Operation Planning Data Flow Forecast Projection of Future Sales Feeds Material Planning: Master Production Schedule Planning MRP Advanced Planner Planning Applications create Planned MO s & PO s Cash Flow Analysis: Use Existing AR, COM Orders & Forecast for income Use Existing AP, PO & Planned Orders for Expenditures

  3. XA Forecasting Forecast Code in Item Balance record determines: Build forecast for item Build forecast and pass to MRP or MPSP Codes: 0 = No Forecast 1 = Forecast, do not pass to planning 2 = Forecast, pass to MPSP as requirement and MRP as reference 3 = Forecast, pass to MPSP and MRP as requirement

  4. Forecast Code

  5. Forecasting Month End Processing will retrieve booking information from COM Move the periods forward by 1 period Calculate the forecast (using experiential roughing) Menu option to pass forecast to MPSP Updates Demand Interface (DMDIFF) file

  6. Forecast Master Forecast Master holds: Sales vs. Forecast for past 12 periods Forecast for next 12 periods Seasonality Factor for fluctuating sales Safety Stock and Reorder Point (option in Tailoring to update Item Balance record) System Calculated forecast can be manually overridden, either at the Annual level or in individual periods

  7. Forecast Master Forecast vs. Sales (past) Future Forecast

  8. Forecast in SIOP If the Forecast is used as a requirement in the Material & Capacity Planning Applications: Forecast needs to be an accurate representation of sales (i.e. not a wish list ) If there is seasonality within the monthly forecasts, the Master Schedule will need to be smoothed Need to verify that there is capacity to produce the forecast prior to running material planning

  9. Other Forecast Options 3rdparty forecasting applications can feed forecast to material planning Futurecast Customer provided forecasts FD6 MPSP put forecast in Demand Interface file (DMDIFF) MRP load forecast to Requirements (REQMTS) file Advanced Planner put forecast into access table

  10. Forecast Metrics Forecast vs. Sales Shipments by Item/Quantity Forecast vs. Sales Shipments by dollar Customer Order fill rate (actual ship date vs. manufacturing schedule due date) Forecast vs. Master Schedule Production

  11. PLANNING

  12. Master Schedule Master Schedule needs to be an accurate statement of what is to be built Master Schedule should be isolated to Finished Goods (level 0 of the bill of material) If lower level items are flagged as MPSP items, their parent items also need to be MPSP items Master Schedule should be reviewed by Senior Management within the company Summarized by Product Family

  13. MPSP MPS Source Code in Item Balance determines what will be treated as a requirement in MPSP: F = Forecast only C/E = Customer Orders only B/D = Greater of Forecast or CO for the period (Forecasting Tailoring determines period length weekly/monthly) M = no requirements, master schedule is manually entered

  14. MPSP Sequence of Events Load Forecast to Demand Interface (DMDIFF) Set Horizon dates Generate Master Schedule Test Master Schedule against capacity constraints (rough cut capacity test) Work/approve the Master Schedule Transfer Master Schedule to MRP

  15. Resource Profiles Resource Master record needs to specify hours/day resource is available Resource ID is loaded into Production Facility Prime Load Code determines if resource constraint is machine or labor time Resource Profile Build job will go through the indented BOM for the MPSP item to find load in constraining facility and time offset

  16. Production Facility Record

  17. Resource Test Resource test will compare master schedule against Resource Profile file Resource display will show weekly periods where master schedule has overloaded the constraining facility Use date field to determine which Master Schedules are contributing to overload No report is available, only inquiry

  18. MPSP load to MRP When performing an MRP generation question Transfer new orders from MPSP? answered Yes will bring the master schedule planned orders from MPSP to MRP to generate planned orders through all levels of the bill of material

  19. Master Schedule Metrics MPSP MO Performance % of MPSP orders started on time (actual start date vs. scheduled start date) % of MPSP orders completed on time (actual completion date vs. due date) Quantity completed vs. quantity orders MPSP order changes within frozen zone (i.e. X number of days from start and/or due date)

  20. ADVANCED PLANNER

  21. Advanced Planner Next Generation of material and capacity planning Download planning information from XA into an Access database Planning performed on a PC or Server, eliminating job conflicts

  22. Advanced Planner Sequence of Events Download data to Access Load the plan Review Load to Capacity for work centers (color coding shows level of capacity problems) Work daily plans to eliminate capacity overloads Review Supply vs. Demand (MRP) plan Upload plan to AS400 (updates PLNORD and REQMTS files) Release orders same as MRP

  23. Load to Capacity

  24. Load to Capacity Separate line for each facility Red Facility over capacity (total) Yellow Facility over capacity for multiple periods Blue Facility over capacity for one period Green Facility under capacity Black Set up time Can drill down to daily load

  25. Daily Load

  26. Daily Load Use Drop & Drag to move order Will reschedule other operations and, if Operation Where Used in BOM is completed, will reschedule material Other options available: Outsource: Have vendor perform operation Alternate Route: use different process (EPDM) Offload: move to different facility (only released MO s) Level load: let AVP move load

  27. AVP New Functionality vs. MRP Customer Orders consume forecast Unlimited number of calendars, can associate multiple facilities to a single calendar Uses routing times (instead of lead time) to calculate MO start date Schedules load for each operation based on operation start/due date; can plan to the minute Uses Maximum Order Quantity to limit order size Planned Orders due the day before the requirement

  28. Supply/Demand for Item

  29. Save Plan Uploads AVP plan to the AS400: Saves Planned Orders in the PLNORD file Saves requirements to the REQMTS file Use MRP recommendations (PowerLink) or MRP Order Release and Review to create MO s and PO s Same metrics as MPSP/MRP apply

  30. Save Plan

  31. CASH FLOW

  32. Cash Flow Overview The Cistech Cash Flow application was created to provide a future view of income and expenditures for a company Cash Flow is written with XA Integrator and runs exclusively in Browser (R6) and PowerLink (R7) Works with both AM and IFM financials Provides both summary data and detail to support the summary This application is especially important these days when cash management is essential to your company s overall health

  33. Sample Screen Time periods are user defined and can be: Daily Weekly Monthly Quarterly

  34. Income Existing AR Uses the existing invoices in Accounts Receivable (either AM or IFM financials) Uses the invoice due date to determine the period for cash receipt Past Due invoices will display in a Past Due period column

  35. Income Future AR Future AR is time phased Customer Orders in COM Uses the Manufacturing Scheduled Ship Date for each item plus the Customer s payment days (based on the terms code in the customer master record) to determine date of cash receipt Assumes shipment/invoice will occur on the Manufacturing Scheduled Ship Date

  36. Income - Forecast Forecast needs to be by Customer and Item for most accurate cash flow Cistech will provide a custom forecast file/file layout to allow you to populate a forecast file for Cash Flow Uses the Customer s Payment Terms Days to age the forecast

  37. Income Sum of: Existing Invoices in Accounts Receivable Aged Customer Orders Aged Forecast

  38. Payments Existing AP Uses the Existing Vendor Invoices in Accounts Payable (either AM or IFM Financials) Uses the Payment Due Date on the invoice to determine payment date/period

  39. Payments Future AP Ages the existing Purchase Orders to determine payment date Takes the Due to Stock Date plus the vendor s Payment Days from the Terms Code specified on the Purchase Order Uses the Offset Days For Blanket Items, uses the Due to Stock Date for each release

  40. Payment MRP Plan P-Plan orders from MRP planned order (PLNORD) file are used to calculate future payments Vendor specified as Primary Vendor in Item Balance record will be the Vendor whose terms are used to calculate offset payment days Vendor Master record holds Terms Code

  41. Sample Screen Summary and detail are both provided and can easily be copied to Excel

  42. SIOP Summary Use Sales Forecast as the beginning point for developing Master Schedule Use Planning applications to create material and capacity plan Use Cash Flow analysis to determine company s cash requirements based on existing orders and plan Use Metrics to determine success of SIOP plan

  43. CISTECH SIOP OFFERINGS Education (Forecasting, COM, MRP, MPSP, AVP) Upcoming AVP JumpStart Engagements Free Webinars on AVP functionality Classroom Education opportunities On-site AVP JumpStart Consulting Engagements CISTECH s Cash Flow Analysis Tool QuickLook consulting program for SIOP 1-2 day review of your current SIOP Process Executive wrap up session to provide vision and implementation plan for SIOP improvements CONTACT INFORMATION Brock Miller brock.miller@cistech.net 704-814-0010 Ben McCormick Ben.mccormick@cistech.net 704-814-0016

  44. THANK YOU FOR ATTENDING!