Comprehensive Plan for Boiler System Maintenance and Capital Improvements

 
Superintendent Goal
Preventive Maintenance and Capital
Replacement for Boiler Systems
 
 
 
Performed by Kluber Architects and
Engineers
 
Summary of Kluber Assessment
 
Current State Assessment
System type, existing conditions, quantity, etc.
Capital Maintenance Cost Summary
Projected capital replacement cost
20 year scheduled totaling $6,870,454
Daily Operator Maintenance Cost Summary
Internal Preventive Maintenance
Annual Service Maintenance Cost Summary
Off season service by third party
 
Summary of Kluber Assessment Cont’d
 
Daily, weekly, and monthly preventive
maintenance checklist customized for the
current District boiler systems
Equipment Replacement and Maintenance
rebate information
Installation, Operation, and Maintenance
manuals provide for all current District boiler
systems
State of Illinois Boiler Regulations
 
Capital Improvement
Alternatives
 
 
Examples of Capital Improvement
Alternatives
 
Glen Flora Elementary
Annual Energy Cost - $62,117.38
Square Footage – 49,912
Pipe Insulation installation
Project Cost - $13,300
Rebate payment - $8,200
Actual project cost - $5,100
 
Examples of Capital Improvement
Alternatives
 
Washington Elementary
Annual Energy Cost - $70,730.69
Square Footage – 62,171
Steam Trap Replacement
Project Cost - $22,000
Rebate payment - $8,205
Actual project cost - $13,795
Boiler Tune-Up
Project Cost - $2,320
Rebate payment - $1,800
Actual project cost - $520
 
Administration Recommendations
 
Obtain a service contract for annual inspection
per the Illinois Boiler and Pressure Vessel Safety
Act
Estimated Financial Impact - $57,120 with a 2.5%
anticipated annual increase (June, July, August, and
September).
Hire 4 HVAC technicians to perform daily, weekly,
and monthly preventive maintenance per
manufacturer’s recommendations
Financial Impact - $269,853.12 plus benefits
Fund Capital Improvements
Financial Impact - $6,870,454 from 2014-2033
Slide Note
Embed
Share

Detailed assessment by Kluber Architects and Engineers outlines preventive maintenance, capital replacement costs, and strategic recommendations for efficient boiler systems management. Includes customized maintenance checklists, equipment rebate details, and options for capital improvements at specified elementary schools. Recommendations prioritize service contracts, technician hiring, and funding for long-term system upgrades.

  • Maintenance
  • Capital improvements
  • Boiler systems
  • Strategic recommendations
  • Preventive maintenance

Uploaded on Oct 10, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Superintendent Goal Preventive Maintenance and Capital Replacement for Boiler Systems Performed by Kluber Architects and Engineers

  2. Summary of Kluber Assessment Current State Assessment System type, existing conditions, quantity, etc. Capital Maintenance Cost Summary Projected capital replacement cost 20 year scheduled totaling $6,870,454 Daily Operator Maintenance Cost Summary Internal Preventive Maintenance Annual Service Maintenance Cost Summary Off season service by third party

  3. Summary of Kluber Assessment Contd Daily, weekly, and monthly preventive maintenance checklist customized for the current District boiler systems Equipment Replacement and Maintenance rebate information Installation, Operation, and Maintenance manuals provide for all current District boiler systems State of Illinois Boiler Regulations

  4. Capital Improvement Alternatives

  5. Examples of Capital Improvement Alternatives Glen Flora Elementary Annual Energy Cost - $62,117.38 Square Footage 49,912 Pipe Insulation installation Project Cost - $13,300 Rebate payment - $8,200 Actual project cost - $5,100

  6. Examples of Capital Improvement Alternatives Washington Elementary Annual Energy Cost - $70,730.69 Square Footage 62,171 Steam Trap Replacement Project Cost - $22,000 Rebate payment - $8,205 Actual project cost - $13,795 Boiler Tune-Up Project Cost - $2,320 Rebate payment - $1,800 Actual project cost - $520

  7. Administration Recommendations Obtain a service contract for annual inspection per the Illinois Boiler and Pressure Vessel Safety Act Estimated Financial Impact - $57,120 with a 2.5% anticipated annual increase (June, July, August, and September). Hire 4 HVAC technicians to perform daily, weekly, and monthly preventive maintenance per manufacturer s recommendations Financial Impact - $269,853.12 plus benefits Fund Capital Improvements Financial Impact - $6,870,454 from 2014-2033

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#