The Vicksburg District of the Mississippi Valley Division is involved in various navigation projects along the Mississippi River and its tributaries. This includes dredging operations, contract opportunities, and project overviews for waterways like the J. Bennett Johnston Waterway, Ouachita-Black River, and Mississippi River Ports/Harbors. The district recently awarded a 5-year Dredging MATOC and is preparing for upcoming dredging activities in different locations. Detailed information on project locations, dredge types, quantities, depths, and business types is provided.


Uploaded on Jul 17, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. 1 VICKSBURG DISTRICT (MVK) PORTFOLIO VICKSBURG DISTRICT NAVIGATION PROJECTS 4 Waterways Mississippi River J. Bennet Johnston Waterway Ouachita-Black River Yazoo River 7 MS River Ports/Harbors

  2. 2 VICKSBURG DISTRICT DREDGING CONTRACT POINTS OF CONTACT Chief of Dredging Unit Paul Richards paul.richards@usace.army.mil 601-631-5297 Dredging Team Lead and COR Tim Heggins timothy.j.heggins@usace.army.mil 601-631-5712 Chief of Navigation Section Andy Hall andy.s.hall@usace.army.mil 601-631-7691

  3. 3 MVK DREDGE CONTRACT OPPORTUNITIES Awarded a 5 year Dredging MATOC (1 base year with 4 options) on 26 September, 2022 Planning to award 2 task orders under this MATOC in February timeframe. Work to be performed on the Mississippi River Harbors, Red River, and Ouachita/Black River.

  4. 4 PROJECT OVERVIEW LOCATION: J. Bennett Johnston Waterway DREDGE TYPE: Hydraulic Pipeline PLACEMENT: Open Water QUANTITY: Varies DEPTH: Varies BUSINESS TYPE: MATOC - Unrestricted ADVERTISE: ~Feb/Mar 2023 COMMENCE DREDGING: ~May/June 2023

  5. 5 PROJECT OVERVIEW LOCATION: Ouachita-Black Rivers DREDGE TYPE: Hydraulic Pipelines PLACEMENT: Open Water QUANTITY: Varies DEPTH: Varies BUSINESS TYPE: MATOC Unrestricted ADVERTISE: ~Feb/Mar 2023 COMMENCE DREDGING: TBD

  6. 6 PROJECT OVERVIEW LOCATION: MS River Ports and Harbors DREDGE TYPE: Hydraulic Pipeline PLACEMENT: Open Water QUANTITY: ~650K CuYd DEPTH: Varies BUSINESS TYPE: MATOC - Unrestricted ADVERTISE: ~Feb/Mar 2023 COMMENCE DREDGING: ~May/Jun 2023