Environmental and Thermal Testing Documentation for Team

 
Environmental Test Document
 
Team Number
Team Name
 
Overview
 
List all tests that were performed
 
Drop Test Configuration
 
List drop test requirements
Explain how the drop test was set up
List materials used
Show picture of test fixture
 
Drop Test Procedures
 
List procedure for the drop test
 
Drop Test Results
 
Show picture of just before drop test
Show picture of how cansat was secured for drop test
Show picture of cansat after drop test still attached to the drop test fixture
Perform functional test and determine if cansat still functioning
Provide a link to the video showing the drop test
Video must show securing the cansat to the fixture
Video must show the cansat held before dropping
Video must show the complete drop and end of test
Video must be less than 5 minutes
 
Thermal Test Configuration
 
List thermal test requirements
Explain how the thermal test was set up
List materials used
Show picture of test fixture
 
Thermal Test Procedures
 
List procedure for the thermal test
 
Thermal Test Results
 
Show picture of just before thermal test
Show picture of how cansat was secured for thermal test (laying in box, on a
mount, etc)
Show picture of cansat after thermal test
Perform functional test on cansat and determine if it still works
Provide a link to the video showing the thermal test
Video needs to show inserting the cansat in the therma chamber
Video needs to show the chamber operating at 60C
Video needs to show the removal of the cansat from the chamber.
Video does not need to show the whole 2+ hours of testing. Keep it under 5 minutes.
 
Vibration Test Configuration
 
List vibration test requirements
Explain how the vibration test was set up
List materials used
Show picture of test fixture
 
Vibration Test Procedures
 
List procedure for the vibration test
 
Vibration Test Results
 
Show picture of just before vibration test
Show picture of how cansat was secured for vibration test and explain how it
was secured
Show picture of cansat after vibration test
Perform functional test on cansat and determine if it still works
Provide a link to the video showing the test
Video must show the cansat being secured to the test fixture
Video must show the complete test
Video must show the cansat after the test
Keep video under 5 minutes
 
Vacuum Test Configuration
 
List vacuum test requirements
Explain how the vacuum test was set up
List materials used
Show picture of test fixture
 
Vacuum Test Procedures
 
List procedure for the vacuum test
 
Vacuum Test Results
 
Show picture of just before vacuum test
Show picture of how cansat was secured for vacuum test (laying in box, on a
mount, etc)
Show picture of cansat after vacuum test
Explain results of the test
Provide telemetry as a csv file
Provide a link to the video of the test
Video must show the cansat being attached to the fixture
Video must show the complete test
Video must show the state of the cansat after the test
Video should be under five minutes.
 
Summary
 
Summaries how tests worked an explain any failures
Describe any corrections needed to get the cansat to past the environmental
tests
Slide Note
Embed
Share

In this detailed documentation, you will find information on the environmental and thermal tests conducted by the team. It includes test configurations, procedures, results, and videos showcasing the testing processes. The documentation provides valuable insights into how the tests were performed and their outcomes for the CanSat project.


Uploaded on Jul 22, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Team Logo Here (If You Want) Environmental Test Document Team Number Team Name

  2. Team Logo Here (If You Want) Overview List all tests that were performed

  3. Team Logo Here (If You Want) Drop Test Configuration List drop test requirements Explain how the drop test was set up List materials used Show picture of test fixture

  4. Team Logo Here (If You Want) Drop Test Procedures List procedure for the drop test

  5. Team Logo Here (If You Want) Drop Test Results Show picture of just before drop test Show picture of how cansat was secured for drop test Show picture of cansat after drop test still attached to the drop test fixture Perform functional test and determine if cansat still functioning Provide a link to the video showing the drop test Video must show securing the cansat to the fixture Video must show the cansat held before dropping Video must show the complete drop and end of test Video must be less than 5 minutes

  6. Team Logo Here (If You Want) Thermal Test Configuration List thermal test requirements Explain how the thermal test was set up List materials used Show picture of test fixture

  7. Team Logo Here (If You Want) Thermal Test Procedures List procedure for the thermal test

  8. Team Logo Here (If You Want) Thermal Test Results Show picture of just before thermal test Show picture of how cansat was secured for thermal test (laying in box, on a mount, etc) Show picture of cansat after thermal test Perform functional test on cansat and determine if it still works Provide a link to the video showing the thermal test Video needs to show inserting the cansat in the therma chamber Video needs to show the chamber operating at 60C Video needs to show the removal of the cansat from the chamber. Video does not need to show the whole 2+ hours of testing. Keep it under 5 minutes.

  9. Team Logo Here (If You Want) Vibration Test Configuration List vibration test requirements Explain how the vibration test was set up List materials used Show picture of test fixture

  10. Team Logo Here (If You Want) Vibration Test Procedures List procedure for the vibration test

  11. Team Logo Here (If You Want) Vibration Test Results Show picture of just before vibration test Show picture of how cansat was secured for vibration test and explain how it was secured Show picture of cansat after vibration test Perform functional test on cansat and determine if it still works Provide a link to the video showing the test Video must show the cansat being secured to the test fixture Video must show the complete test Video must show the cansat after the test Keep video under 5 minutes

  12. Team Logo Here (If You Want) Vacuum Test Configuration List vacuum test requirements Explain how the vacuum test was set up List materials used Show picture of test fixture

  13. Team Logo Here (If You Want) Vacuum Test Procedures List procedure for the vacuum test

  14. Team Logo Here (If You Want) Vacuum Test Results Show picture of just before vacuum test Show picture of how cansat was secured for vacuum test (laying in box, on a mount, etc) Show picture of cansat after vacuum test Explain results of the test Provide telemetry as a csv file Provide a link to the video of the test Video must show the cansat being attached to the fixture Video must show the complete test Video must show the state of the cansat after the test Video should be under five minutes.

  15. Team Logo Here (If You Want) Summary Summaries how tests worked an explain any failures Describe any corrections needed to get the cansat to past the environmental tests