Accelerator Progression at STF Facility in 2012

Slide Note
Embed
Share

The STF facility witnessed significant advancements in 2012, with activities ranging from vertical cavity testing to fall-run operations and accelerator studies. Key milestones included cool-down processes, beam tuning, collision tuning, and symposium events, leading up to a successful run-end in December.


Uploaded on Sep 17, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. STF status 09252012 H. Hayano

  2. MHI-022

  3. MHI-018

  4. STF cavity vertical test status (2010-2012) :ILC spec. clear , 2010-2012 MHI cavities name reached gradient MHI-012 40.7MV/m MHI-013 32.2MV/m to be installed Capture cryomodule for capture cryomodule for capture cryomodule MHI-014 36.6MV/m MHI-015 35.7MV/m MHI-016 33.8MV/m for CM-1 ILC cryomodule MHI-017 38.4MV/m for CM-1 ILC cryomodule MHI-018 30.3MV/m for CM-1 ILC cryomodule (field emission) MHI-019 37.2MV/m for CM-1 ILC cryomodule MHI-020 28.5MV/m for CM-1 ILC cryomodule (field emission) MHI-021 38.9MV/m for CM-1 ILC cryomodule MHI-022 35.8MV/m for CM-1 ILC cryomodule for CM-1 ILC cryomodule for CM-1 ILC cryomodule CM-1 Cryomodule candidates 2010-2012 other vender cavities TOS-02(w/o HOM): 1-st VT: 31.2MV/m, 2-nd VT:32.7MV/m HIT-02(with HOM): 1-st VT: 35.2MV/m, 2-nd VT:40.9MV/m KEK-00(w/o HOM): 1-st VT: 26MV/m, 2-nd VT:29MV/m, 3-rd VT:24MV/m KEK-01(with HOM): under fabrication to be finished on November

  5. STF Accelerator 2012 fall-run September 2012 Tue Wed Sun Mon Thu Fri Sat Start cool-down cool-down LINAC 12 cool-down reached to 2K cool-down Re-start-up of beam tuning cool-down SCRF process

  6. October 2012 Tue Sun Mon Wed Thu Fri Sat cool-down Collision tuning cool-down Compton collision cool-down Accelerator study (HOM-BPM, LLRF etc) LCWS cool-down Compton collision Accelerator study (HOM-BPM, LLRF etc) cool-down

  7. November 2012 Tue Wed Sun Mon Thu Fri Sat Accelerator study (HOM-BPM, etc) TTC meeting cool-down LLRF study Compton collision cool-down cool-down Compton collision cool-down Compton collision

  8. December 2012 Tue Wed Sun Mon Thu Fri Sat Quantum-Beam Symposium Accelerator study (LLRF, cavity, RF-gun) cool-down Accelerator study (LLRF, cavity, RF-gun) cool-down Accelerator study (LLRF, cavity, RF-gun) cool-down December 21: run-end