Project Organization and Management Strategy Wrap-up Review

undefined
Steve Holmes
 
DOE Independent Project Review of PIP-II
15 November 2016
O
r
g
a
n
i
z
a
t
i
o
n
 
a
n
d
 
M
a
n
a
g
e
m
e
n
t
 
S
t
r
a
t
e
g
y
;
W
r
a
p
-
u
p
 
O
u
t
l
i
n
e
Project Organization
Management Team
R2A2s
Project Office Evolution
Project Strategy
Wrap-up
11/15/2016
S. Holmes | Organization/Wrap-up
2
 
P
r
o
j
e
c
t
 
O
r
g
a
n
i
z
a
t
i
o
n
We have established an organizational structure that is
appropriate for a DOE413.3b project
This organization has been leading the R&D phase, and has
managed the transition to formal project status over the last
year.
The organization is currently ~90% populated through level 3;
open positions will be filled as conditions warrant
This organization is fully capable of successfully constructing
and commissioning an accelerator that will perform as
specified
11/15/2016
S. Holmes | Organization/Wrap-up
3
 
P
r
o
j
e
c
t
 
O
r
g
a
n
i
z
a
t
i
o
n
/
M
a
n
a
g
e
m
e
n
t
 
T
e
a
m
11/15/2016
S. Holmes | Organization/Wrap-up
4
 
P
r
o
j
e
c
t
 
O
r
g
a
n
i
z
a
t
i
o
n
/
M
a
n
a
g
e
m
e
n
t
 
T
e
a
m
11/15/2016
S. Holmes | Organization/Wrap-up
5
Needs Update
 
P
r
o
j
e
c
t
 
O
r
g
a
n
i
z
a
t
i
o
n
/
A
d
v
i
s
o
r
y
 
C
o
m
m
i
t
t
e
e
s
Accelerator Advisory Committee reports to the Fermilab Director
Charged to provide advice on the strategic approach and
effectiveness of the accelerator program at Fermilab
Operations and Performance Improvements
Projects
Advanced Accelerator R&D
Chair: John Galambos/Accelerator Physics, Beam Instrumentation,
and Ion Source Group Leader/SNS
PIP-II Machine Advisory Committee reports to the Accelerator
Division Head
Charged to provide advice on the technical approach to PIP-II and the
corresponding development program
Formally convened as a subcommittee of the AAC
Chair: Roland Garoby/Technical Director/European Spallation Source
Technical Board advised the Project Scientist
Charged with controlling the technical configuration of PIP-II
Chair: Valeri Lebedev/PIP-II Project Scientist
11/15/2016
S. Holmes | Organization/Wrap-up
6
 
M
a
n
a
g
e
m
e
n
t
 
T
e
a
m
The PIP-II management team has extensive experience in DOE
construction projects and in the commissioning/operations of
accelerators
S. Holmes: Main Injector Project Manager, Accelerator Division Head,
Associate Laboratory Director for Accelerators
P. Derwent: NOvA Associate Project Manager, PIP-II Department
Head, Recycler Department Head, Antiproton Source Department
Deputy Head
S. Mishra: Main Injector Commissioning Coordinator, Main Injector
Department Head, ILC/Fermilab Deputy Director, India Collaboration
Development
V. Lebedev: CEBAF Commissioning Team, Tevatron Run II accelerator
physics
D. Mitchell: Design/Drafting Department Head, U.S. LHC Accelerator
Project
S. Dixon: NOvA construction manager, Short Baseline Neutrino GPP
manager
L. Lari: Lead planner ESS linac, LHC installation coordination team
11/15/2016
S. Holmes | Organization/Wrap-up
7
 
R
2
A
2
s
Roles, responsibilities, authorities, and accountabilities exist in draft form for all members of the Project
Management Team
The Management Team is currently operating according to these descriptions
E
x
a
m
p
l
e
:
 
P
I
P
-
I
I
 
A
s
s
o
c
i
a
t
e
 
P
r
o
j
e
c
t
 
M
a
n
a
g
e
r
 
f
o
r
 
P
l
a
n
n
i
n
g
 
a
n
d
 
R
e
p
o
r
t
i
n
g
Authority and responsibility for organization and management of all planning and reporting activities on
PIP-II. Specific responsibilities include:
Organize and coordinate the Project Controls effort on PIP-II through all phase of the project;
Organize and coordinate the implementation and operations of the PIP-II EVMS, in conformance
with FRA policies and requirements;
Organize and coordinate preparation of PIP-II cost estimates, budgets and schedules;
Oversee budget planning exercises, including identification of resource assignments requested
from the laboratory;
Assure that the  Resource Loaded Schedule is aligned with PIP-II technical, cost and schedule
goals, in collaboration with the Deputy Project Manager for Construction Coordination;
Organize and coordinate preparation of the PIP-II risk management program;
Organize and coordinate preparation of the PIP-II procurement strategy;
Oversee and monitor PIP-II procurements;
Oversee and monitor PIP-II human resources activities;
Coordinate the development and publication of all required PIP-II documentation and reports
Accountable to: Fermilab PIP-II Project Manager
11/15/2016
S. Holmes | Organization/Wrap-up
8
 
P
l
a
n
 
t
o
 
P
o
p
u
l
a
t
e
 
t
h
e
 
P
r
o
j
e
c
t
 
O
f
f
i
c
e
At CD-1 we expect to have in place the people listed as TBD
on slide 4
APM_ESHQ (may come post-CD-1)
Project Controls Manager
Procurements Manager
Existing Accelerators Manager
Superconducting Linac Lead Engineer
Eventually the Office staff will include a few more support
staff, including additional project controls specialists
When fully staffed (CD-2) it is estimated the Project Office will
comprise 21 FTE
11/15/2016
S. Holmes | Organization/Wrap-up
9
 
P
r
o
j
e
c
t
 
S
t
r
a
t
e
g
y
Goal is 1.2 MW at start of LBNF operations (~2025)
Construction phase is 6 years: 2020-25
CD-3 in FY20
CD-2/3a in FY18/19
CD-1 in FY17
CD-0 in FY16
CD-0:CD-1 (1.5 year)
CDR
RLS/Cost Estimate
Independent Cost Review
Independent Design Review
Initiate NEPA
Keep R&D on track
Management Additions: APM-ESHQ, PCM, L2Ms
11/15/2016
S. Holmes | Organization/Wrap-up
10
 
P
r
o
j
e
c
t
 
S
t
r
a
t
e
g
y
CD-1:CD-2/3a (1.5 years)
Engineering Design: More engineers, designers, drafters
EVMS: More project controls specialists
Complete NEPA documentation
Keep R&D on track, national and international
Independent design reviews (following Fermilab process)
Joint (Fermilab-India) technical reviews
Management Additions: CAMs
CD-2/3a:CD-3 (1 year)
Final Design
Finalize international deliverables
Independent design reviews
Joint (Fermilab-India) technical reviews
EVMS operational
Complete R&D
Long-lead procurements: Nb, initial cavity contract, cryoplant, civil construction
initial site activities
CD-3:CD-4 (5-6 years)
Build it
11/15/2016
S. Holmes | Organization/Wrap-up
11
 
W
r
a
p
-
u
p
Suggested Charge responses
1.
Yes. Yes.
2.
Yes.
3.
Yes.
4.
Yes. Yes. Yes.
5.
Yes.
6.
Yes. Yes.
More specifically…
11/15/2016
S. Holmes | Organization/Wrap-up
12
 
W
r
a
p
-
u
p
PIP-II conceptual design is responsive to the goals established by
the Mission Need Statement
R&D program is designed to mitigate risks associated with the
conceptual design
Front end systems test (PIP2IT) and RF controls
SRF development
In collaboration with India/DAE laboratories
Monitored by P2MAC
Cost estimate prepared in June 2015 corresponds to the scope
included in the conceptual design
Point estimate: $516M
Upper cost range: $650M
Cost to DOE after incorporating international offsets
Resource Loaded Schedule is under development
WBS established
Major elements of the R&D phase incorporated
Major milestones for R&D and construction phases identified
11/15/2016
S. Holmes | Organization/Wrap-up
13
 
W
r
a
p
-
u
p
An experienced management team is in place that can be
expected to successfully execute the PIP-II project.
ESH is being integrated into the project, following laboratory
policies and procedures
Accelerator shielding and operations requirements at PIP2IT
NEPA strategy developed and initial steps in process
Welands delineation
EENF
The collaboration with India/DAE labs is maturing and starting
to deliver collaboratively developed hardware
Joint R&D document defines the R&D phase deliverables
Potential European contributions under discussion
Lots to do to get to CD-1, but all the required elements are
now moving forward
11/15/2016
S. Holmes | Organization/Wrap-up
14
 
B
a
c
k
u
p
s
 
11/15/2016
S. Holmes | Organization/Wrap-up
15
 
P
r
o
j
e
c
t
 
O
r
g
a
n
i
z
a
t
i
o
n
/
M
a
n
a
g
e
m
e
n
t
 
T
e
a
m
11/15/2016
S. Holmes | Organization/Wrap-up
16
Note: Needs to be updated to align with Project WBS
Slide Note
Embed
Share

The review discusses the established organizational structure for a DOE project, emphasizing successful management transitioning to formal project status. It highlights the organization's capability in R&D, staffing, construction, and commissioning an accelerator as specified. The advisory committees and management team's roles are outlined, showcasing extensive experience in DOE construction projects and accelerator operations.


Uploaded on Sep 11, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Organization and Management Strategy; Wrap-up Steve Holmes DOE Independent Project Review of PIP-II 15 November 2016

  2. Outline Project Organization Management Team R2A2s Project Office Evolution Project Strategy Wrap-up 2 S. Holmes | Organization/Wrap-up 11/15/2016

  3. Project Organization We have established an organizational structure that is appropriate for a DOE413.3b project This organization has been leading the R&D phase, and has managed the transition to formal project status over the last year. The organization is currently ~90% populated through level 3; open positions will be filled as conditions warrant This organization is fully capable of successfully constructing and commissioning an accelerator that will perform as specified 3 S. Holmes | Organization/Wrap-up 11/15/2016

  4. Project Organization/Management Team 4 S. Holmes | Organization/Wrap-up 11/15/2016

  5. Project Organization/Management Team 5 S. Holmes | Organization/Wrap-up 11/15/2016

  6. Project Organization/Advisory Committees Accelerator Advisory Committee reports to the Fermilab Director Charged to provide advice on the strategic approach and effectiveness of the accelerator program at Fermilab Operations and Performance Improvements Projects Advanced Accelerator R&D Chair: John Galambos/Accelerator Physics, Beam Instrumentation, and Ion Source Group Leader/SNS PIP-II Machine Advisory Committee reports to the Accelerator Division Head Charged to provide advice on the technical approach to PIP-II and the corresponding development program Formally convened as a subcommittee of the AAC Chair: Roland Garoby/Technical Director/European Spallation Source Technical Board advised the Project Scientist Charged with controlling the technical configuration of PIP-II Chair: Valeri Lebedev/PIP-II Project Scientist 6 S. Holmes | Organization/Wrap-up 11/15/2016

  7. Management Team The PIP-II management team has extensive experience in DOE construction projects and in the commissioning/operations of accelerators S. Holmes: Main Injector Project Manager, Accelerator Division Head, Associate Laboratory Director for Accelerators P. Derwent: NOvA Associate Project Manager, PIP-II Department Head, Recycler Department Head, Antiproton Source Department Deputy Head S. Mishra: Main Injector Commissioning Coordinator, Main Injector Department Head, ILC/Fermilab Deputy Director, India Collaboration Development V. Lebedev: CEBAF Commissioning Team, Tevatron Run II accelerator physics D. Mitchell: Design/Drafting Department Head, U.S. LHC Accelerator Project S. Dixon: NOvA construction manager, Short Baseline Neutrino GPP manager L. Lari: Lead planner ESS linac, LHC installation coordination team 7 S. Holmes | Organization/Wrap-up 11/15/2016

  8. R2A2s Roles, responsibilities, authorities, and accountabilities exist in draft form for all members of the Project Management Team The Management Team is currently operating according to these descriptions Example: PIP-II Associate Project Manager for Planning and Reporting Authority and responsibility for organization and management of all planning and reporting activities on PIP-II. Specific responsibilities include: Organize and coordinate the Project Controls effort on PIP-II through all phase of the project; Organize and coordinate the implementation and operations of the PIP-II EVMS, in conformance with FRA policies and requirements; Organize and coordinate preparation of PIP-II cost estimates, budgets and schedules; Oversee budget planning exercises, including identification of resource assignments requested from the laboratory; Assure that the Resource Loaded Schedule is aligned with PIP-II technical, cost and schedule goals, in collaboration with the Deputy Project Manager for Construction Coordination; Organize and coordinate preparation of the PIP-II risk management program; Organize and coordinate preparation of the PIP-II procurement strategy; Oversee and monitor PIP-II procurements; Oversee and monitor PIP-II human resources activities; Coordinate the development and publication of all required PIP-II documentation and reports Accountable to: Fermilab PIP-II Project Manager 8 S. Holmes | Organization/Wrap-up 11/15/2016

  9. Plan to Populate the Project Office At CD-1 we expect to have in place the people listed as TBD on slide 4 APM_ESHQ (may come post-CD-1) Project Controls Manager Procurements Manager Existing Accelerators Manager Superconducting Linac Lead Engineer Eventually the Office staff will include a few more support staff, including additional project controls specialists When fully staffed (CD-2) it is estimated the Project Office will comprise 21 FTE 9 S. Holmes | Organization/Wrap-up 11/15/2016

  10. Project Strategy Goal is 1.2 MW at start of LBNF operations (~2025) Construction phase is 6 years: 2020-25 CD-3 in FY20 CD-2/3a in FY18/19 CD-1 in FY17 CD-0 in FY16 CD-0:CD-1 (1.5 year) CDR RLS/Cost Estimate Independent Cost Review Independent Design Review Initiate NEPA Keep R&D on track Management Additions: APM-ESHQ, PCM, L2Ms 10 S. Holmes | Organization/Wrap-up 11/15/2016

  11. Project Strategy CD-1:CD-2/3a (1.5 years) Engineering Design: More engineers, designers, drafters EVMS: More project controls specialists Complete NEPA documentation Keep R&D on track, national and international Independent design reviews (following Fermilab process) Joint (Fermilab-India) technical reviews Management Additions: CAMs CD-2/3a:CD-3 (1 year) Final Design Finalize international deliverables Independent design reviews Joint (Fermilab-India) technical reviews EVMS operational Complete R&D Long-lead procurements: Nb, initial cavity contract, cryoplant, civil construction initial site activities CD-3:CD-4 (5-6 years) Build it 11 S. Holmes | Organization/Wrap-up 11/15/2016

  12. Wrap-up Suggested Charge responses 1. Yes. Yes. 2. Yes. 3. Yes. 4. Yes. Yes. Yes. 5. Yes. 6. Yes. Yes. More specifically 12 S. Holmes | Organization/Wrap-up 11/15/2016

  13. Wrap-up PIP-II conceptual design is responsive to the goals established by the Mission Need Statement R&D program is designed to mitigate risks associated with the conceptual design Front end systems test (PIP2IT) and RF controls SRF development In collaboration with India/DAE laboratories Monitored by P2MAC Cost estimate prepared in June 2015 corresponds to the scope included in the conceptual design Point estimate: $516M Upper cost range: $650M Cost to DOE after incorporating international offsets Resource Loaded Schedule is under development WBS established Major elements of the R&D phase incorporated Major milestones for R&D and construction phases identified 13 S. Holmes | Organization/Wrap-up 11/15/2016

  14. Wrap-up An experienced management team is in place that can be expected to successfully execute the PIP-II project. ESH is being integrated into the project, following laboratory policies and procedures Accelerator shielding and operations requirements at PIP2IT NEPA strategy developed and initial steps in process Welands delineation EENF The collaboration with India/DAE labs is maturing and starting to deliver collaboratively developed hardware Joint R&D document defines the R&D phase deliverables Potential European contributions under discussion Lots to do to get to CD-1, but all the required elements are now moving forward 14 S. Holmes | Organization/Wrap-up 11/15/2016

  15. Backups 15 S. Holmes | Organization/Wrap-up 11/15/2016

  16. Project Organization/Management Team Note: Needs to be updated to align with Project WBS 16 S. Holmes | Organization/Wrap-up 11/15/2016

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#