The QA-QC meeting for Cosmic Bench on 11th January 2016 aimed to identify problems in the detection chain, including dead strips and inefficiencies. The setup involved reusing the M-Cube project's bench with modifications. The procedure included scanning a region, using modules equipped with DREAM electronics. The to-do list involves finalizing the design, adapting cards, and familiarizing with DREAM electronics. The cost estimation for the configuration and expansion was also detailed.


Uploaded on Sep 13, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. QA-QC Meeting Cosmic Bench 11 January 2016

  2. Aim of the Cosmic Bench Efficiency characterisation Identify problems along the whole detection chain: dead strips, inefficiences, connexion problems Requirements: gas, HV, electronics cards (not the final VMM electronics, we will use the DREAM electronics

  3. Set up Re-use the cosmic bench of the M-Cube project with a modification of the structure that has already been designed

  4. Procedure Scanning region 1.5 0.5 m2 (a few days to scan the whole module), 5 steps ~5 days to scan a whole module~1 week Use the M cubes modules in coincidence with our module M cube is equipped with DREAM electronics Our modules will be also equipped with DREAM electronics We have already ordered the DREAM electronics corresponding to 1/5 of the surface~4096 channels 8 cards

  5. To do list Platform: finalise the design (with Didier, Christoph and Marc) and order it Design and adaptation cards Zebra connectors to DREAM connecteurs Multiplexing (we will read only 1 over 2 strips) Start looking at the data of the DREAM electronics to be familiarised with it

  6. Dimensions des panneaux

  7. Prix Configuration souhait e (1/5 de la surface quip = 4096 channels) Le cout total estim est de l ordre ~70 k Agrandissement plateforme existante: 5 k D tecteurs M-cube r f rence : 6 d tecteurs x 5 k = 30 k DAQ Electronique pour quiper le 4 kcannaux du module NSW + lectronique d tecteurs M 4+2= 6 cartes FEU et tout leur environment : 35 k