Update on El Dorado Blvd Improvement Project in Harris County Precinct 2

Slide Note
Embed
Share

The El Dorado Blvd improvement project in Harris County Precinct 2 is currently in progress with the final design under review. The construction is expected to start in February 2020 after CenterPoint Poles are relocated. Stay tuned for further updates on this significant infrastructure development.


Uploaded on Oct 06, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. CIP Update EL DORADO BLVD Horsepen Bayou Bridge to Clear Lake City Blvd Rey Guerra Capital Improvement Program Manager Harris County Precinct 2, Commissioner Adrian Garcia Ben Theodore R&B CIP Project Manager Harris County Engineering Department

  2. EL DORADO BLVD CURRENT STATUS Study, Design, Construction Final design being reviewed by COH, HCED 35 CenterPoint Poles to be relocated Target: Feb 2020 Expected Bid: Oct 2019 Expected Construction Start: Feb 2020