Updates and Discussions on Telemetry and Protocol Changes

undefined
 
MWG Update to
WMS
 
December 2, 2020
Presented by:  Gabriel Godinez
MWG Chair
 
ERCOT Analysis of Line Loss Data
 
ERCOT presented ERCOT draft of line loss
compensation protocol and SMOG language
changes.
Consensus made to move forward with changes presented
in draft language.
ERCOT Legal still needs to review draft language.
 
Loss of Telemetry Indication Update
 
Tesla indicated final testing has not yet been
performed. An alternate solution involving a register
versus a discreet event has been considered but not
yet tested.
MREADS indicated that the event as currently seen
on TNMP’s event log has been sent to ITRON to see
if it’s an event that can be seen during polling.
Additional updates to SMOG 6.5.4(1)(l)&(m) might
be needed once testing can be completed.
 
ERCOT Form Updates for NPRR
1020 Discussion
 
Draft of Design Proposal 3.0 with new section for auxiliary load telemetry
was reviewed; MWG accepted document as drafted.
Draft of MDAS Configuration Form 6.0 was reviewed; MWG accepted
document as drafted.
Draft of Site Certification Form 5.0 and Meter Test Report 6.0 was
reviewed.
ERCOT recommended only adopting one form to capture that the meter point has
auxiliary load telemetry. TDSP feedback was to utilize Site Certification and discard
changes to Meter Test form. MWG accepted Site Certification as drafted.
Draft of Resource Entity Access to Auxiliary Load Telemetry System 1.0
was reviewed; MWG accepted document as drafted.
All aforementioned forms will not be official until SMOGRR to support
NPRR1020 is approved.
 
SMOGRR Updates for NPRR 1020
Discussion
 
Section 6.5.4(1)(l)&(m) concerning loss and restoration of
telemetry events will be left as previously edited.  If
further testing and implementation requires an update, the
update will be made as soon as feasible.
MWG no longer considering standalone meter option for
auxiliary load telemetry.
Appendix A was updated to clarify the requirement for
resource entities after accessing facilities.  Update included
notification requirements and a clear delineation between
what is submitted by the TDSP and what is submitted by
an RE depending on access.
 
SMOGRR Updates for NPRR 1020
Discussion (cont’d)
 
Changes made by ERCOT to Appendix D were
reviewed and accepted by MWG as drafted.
MWG is in consensus that the SMOG as edited on
11/18 represents a viable path forward to implement
in support of NPRR1020.
If issues are identified during implementation of the
new site types, a future SMOGRR might be needed
to provide clarity or corrections.
 
New or Other Business Items
 
ERCOT revisited requirements to zero meter data.
When new sites have telemetry that indicates energy
flow, TDSPs will need to provide positive ongoing
confirmation of no energy or actual meter data.
ERCOT also reminded TDSPs that when
downloading and submitting meter data manually, the
meter event log needs to be included.
Meeting adjourned.
Slide Note
Embed
Share

ERCOT and MWG discuss updates related to telemetry systems, loss data analysis, and protocol changes. Consensus reached on moving forward with language changes. Testing and review ongoing for final implementation. Forms, documents, and protocols being reviewed and accepted to support NPRR1020. Updates to SMOGRR to align with changes. Future revisions possible based on implementation feedback.

  • Updates
  • Discussions
  • Telemetry
  • Protocol Changes
  • ERCOT

Uploaded on Oct 03, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. MWG Update to WMS December 2, 2020 Presented by: Gabriel Godinez MWG Chair

  2. ERCOT Analysis of Line Loss Data ERCOT presented ERCOT draft of line loss compensation protocol and SMOG language changes. Consensus made to move forward with changes presented in draft language. ERCOT Legal still needs to review draft language.

  3. Loss of Telemetry Indication Update Tesla indicated final testing has not yet been performed. An alternate solution involving a register versus a discreet event has been considered but not yet tested. MREADS indicated that the event as currently seen on TNMP s event log has been sent to ITRON to see if it s an event that can be seen during polling. Additional updates to SMOG 6.5.4(1)(l)&(m) might be needed once testing can be completed.

  4. ERCOT Form Updates for NPRR 1020 Discussion Draft of Design Proposal 3.0 with new section for auxiliary load telemetry was reviewed; MWG accepted document as drafted. Draft of MDAS Configuration Form 6.0 was reviewed; MWG accepted document as drafted. Draft of Site Certification Form 5.0 and Meter Test Report 6.0 was reviewed. ERCOT recommended only adopting one form to capture that the meter point has auxiliary load telemetry. TDSP feedback was to utilize Site Certification and discard changes to Meter Test form. MWG accepted Site Certification as drafted. Draft of Resource Entity Access to Auxiliary Load Telemetry System 1.0 was reviewed; MWG accepted document as drafted. All aforementioned forms will not be official until SMOGRR to support NPRR1020 is approved.

  5. SMOGRR Updates for NPRR 1020 Discussion Section 6.5.4(1)(l)&(m) concerning loss and restoration of telemetry events will be left as previously edited. If further testing and implementation requires an update, the update will be made as soon as feasible. MWG no longer considering standalone meter option for auxiliary load telemetry. Appendix A was updated to clarify the requirement for resource entities after accessing facilities. Update included notification requirements and a clear delineation between what is submitted by the TDSP and what is submitted by an RE depending on access.

  6. SMOGRR Updates for NPRR 1020 Discussion (cont d) Changes made by ERCOT to Appendix D were reviewed and accepted by MWG as drafted. MWG is in consensus that the SMOG as edited on 11/18 represents a viable path forward to implement in support of NPRR1020. If issues are identified during implementation of the new site types, a future SMOGRR might be needed to provide clarity or corrections.

  7. New or Other Business Items ERCOT revisited requirements to zero meter data. When new sites have telemetry that indicates energy flow, TDSPs will need to provide positive ongoing confirmation of no energy or actual meter data. ERCOT also reminded TDSPs that when downloading and submitting meter data manually, the meter event log needs to be included. Meeting adjourned.