Update on Ship Warfare Systems Integration Panel

 
Ship Warfare Systems Integration Panel
 
Perry Haymon, Panel Chair
Huntington Ingalls Industries, Ingalls Shipbuilding
 
1
 
Panel Update
 
Agenda
 
2
 
Anti Trust Rules
 
3
 
Regarding your company’s and/or your competitor’s 
product &
services
:
Do not discuss current or future prices.
Do not discuss any increase or decrease in price.
Do not discuss pricing procedures.
Do not discuss standardizing or stabilizing prices.
Do not discuss controlling sales or allocating markets for any product.
Do not discuss future design or marketing strategies.
 
Anti-Trust Rules
 
4
 
Regarding your company’s and/or your competitors’ selection of their
supplier companies
:
Do not discuss refusing to deal with a company because of its pricing or
distribution practices.
Do not discuss strategies or plans to award business to remove business from
a specific company.
 
Regarding your company’s and/or competitors’ 
trade secrets
:
Do not discuss trade secrets or confidential information of your company or
any other participant.
 
Anti-Trust Rules
 
5
 
Panel Projects for 2019
Top Three Projects for 2019
TRITON Dynamic Network Paradigm: Analysis and Demonstration – Penn State
Alternate False Deck Design Optimization And Qualification – NNS
Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships – NNS
Joint Panel Project for 2019 – Electrical Panel
Fusion Splice Enclosure At Equipment - NNS
Additional Project Submission for 2019
Design of a Shock Isolated False Deck (SFID) Principal Unit and Development of an Environmental Qualification
Test (EQT) Strategy - NNS
 
Current Panel Activities
 
~14 panels projects have been
completed with 3 actives
projects since the SWSI Panel
was started
The majority of the Project
focused on physical Interfaces
been equipment and ship
structure
These efforts helped transition
technology found on the Ford
Class to LHA 8 and LPD 29 and
follow (Flexible Infrastructure)
 
Past and Current Projects
 
7
 
Extension Basis for 72 Inch POA
Enclosure Systems to DDG and
CG Ships Potential
This is common 72” tall common
equipment rack solution currently
used on the Ford Class
Currently PEO IWS 10 and
C5ISR are looking for a
common rack solution to help
reduce installation and life cycle
cost. This may be that answer.
 
2022 Panel Projects - TBD
Next Meeting – July 2021
Potential 72” POA Special Project
Raid Adoption Project
The National Shipbuilding Research Program (NSRP) developed this
Rapid Adoption Project (RAP) Pilot Program to provide the U.S.
shipbuilding and ship repair industry and the U.S. Navy with a
methodology for rapidly identifying and implementing mature,
commercial technologies, products, processes and services that will
specifically benefit U.S. Naval shipbuilding and ship repair.
 
SWSI Going Forward
 
8
 
Agenda
 
9
 
Questions?
 
10
 
11
Slide Note
Embed
Share

The Panel Update on Ship Warfare Systems Integration, chaired by Perry Haymon from Huntington Ingalls Industries, discussed various topics including false deck updates, fusion splice enclosures, and extension basis for POA enclosure systems. Anti-trust rules were also highlighted regarding discussions on pricing, supplier selection, and trade secrets. Current panel activities focused on top projects for 2019 like TRITON Dynamic Network Paradigm and False Deck Design Optimization. Over 14 panel projects have been completed with ongoing efforts to integrate technology in ships effectively.

  • Ship Warfare Systems
  • Integration Panel
  • Project Updates
  • Anti-Trust Rules
  • Technology Transition

Uploaded on Jul 22, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Panel Update Ship Warfare Systems Integration Panel Perry Haymon, Panel Chair Huntington Ingalls Industries, Ingalls Shipbuilding 1

  2. Agenda Time Presentation Speaker 10:05 Introduction / Panel Chair Welcome / Chair Report Haymon 10:10 Panel Update Haymon 10:30 False Deck Update Robert Santiago, ATI / CMTC 11:15 Fusion Splice Enclosure at Equipment John Mazurowski 12:00 Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships Mike Talley 12:45 Review Action Items / Closing Remarks Haymon 2

  3. Anti Trust Rules 3

  4. Anti-Trust Rules Regarding your company s and/or your competitor s product & services: Do not discuss current or future prices. Do not discuss any increase or decrease in price. Do not discuss pricing procedures. Do not discuss standardizing or stabilizing prices. Do not discuss controlling sales or allocating markets for any product. Do not discuss future design or marketing strategies. 4

  5. Anti-Trust Rules Regarding your company s and/or your competitors selection of their supplier companies: Do not discuss refusing to deal with a company because of its pricing or distribution practices. Do not discuss strategies or plans to award business to remove business from a specific company. Regarding your company s and/or competitors trade secrets: Do not discuss trade secrets or confidential information of your company or any other participant. 5

  6. Current Panel Activities Panel Projects for 2019 Top Three Projects for 2019 TRITON Dynamic Network Paradigm: Analysis and Demonstration Penn State Alternate False Deck Design Optimization And Qualification NNS Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships NNS Joint Panel Project for 2019 Electrical Panel Fusion Splice Enclosure At Equipment - NNS Additional Project Submission for 2019 Design of a Shock Isolated False Deck (SFID) Principal Unit and Development of an Environmental Qualification Test (EQT) Strategy - NNS

  7. Past and Current Projects ~14 panels projects have been completed with 3 actives projects since the SWSI Panel was started The majority of the Project focused on physical Interfaces been equipment and ship structure These efforts helped transition technology found on the Ford Class to LHA 8 and LPD 29 and follow (Flexible Infrastructure) Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships Potential This is common 72 tall common equipment rack solution currently used on the Ford Class Currently PEO IWS 10 and C5ISR are looking for a common rack solution to help reduce installation and life cycle cost. This may be that answer. 7

  8. SWSI Going Forward 2022 Panel Projects - TBD Next Meeting July 2021 Potential 72 POA Special Project Raid Adoption Project The National Shipbuilding Research Program (NSRP) developed this Rapid Adoption Project (RAP) Pilot Program to provide the U.S. shipbuilding and ship repair industry and the U.S. Navy with a methodology for rapidly identifying and implementing mature, commercial technologies, products, processes and services that will specifically benefit U.S. Naval shipbuilding and ship repair. 8

  9. Agenda Time Presentation Speaker 10:05 Introduction / Panel Chair Welcome / Chair Report Haymon 10:10 Panel Update Haymon 10:30 False Deck Update Robert Santiago, ATI / CMTC 11:15 Fusion Splice Enclosure at Equipment John Mazurowski 12:00 Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships Mike Talley 12:45 Review Action Items / Closing Remarks Haymon 9

  10. Questions? 10

  11. 11