SPICA-VIS Design Review Summary and Project Update
The SPICA-VIS Design Review held on July 23-24, 2020, aimed to evaluate the design against requirements, identify issues, and finalize the mechanical study. The agenda included sessions on management/system, injection table, spectrograph, and software. The team, led by Philippe Berio, is working towards the end goal of integrating SPICA-VIS at CHARA focal lab by Nov./Dec. 2021. Funding details and project timelines were also discussed during the review.
Uploaded on Sep 28, 2024 | 0 Views
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
SPICA-VIS DESIGN REVIEW Board: Judith Sturmann, Karine Perraut, Theo ten Brummelaar, John Monnier and Frantz Martinache SPICA-VIS team: Denis Mourard, St phane Lagarde, Julien Dejonghe, Fr d ric Morand, Cyril Pannetier, Christophe Bailet, Daniel Lecron, Fatm Allouche, Philippe Berio Goal: Evaluate the SPICA-VIS design against its requirements & Identify issues Finalize mechanical study Ordering/Manufacturing Coding Assembly/Integration Next funding requests (INSU, ERC) Implantation of SPICA-VIS in the CHARA focal lab Optical design and co-alignment procedure Control software design Schedule of the project Design Review Agenda: Session 1: Management/System Session 2: Injection table Session 3: Spectrograph Session 4: Software SPICA-VIS Design Review, July 23-24, 2020 Philippe Berio
MANAGEMENT/SYSTEM Schedule End of Design (Jan.2021) End of Integration at Nice (Sept. 2021) Design Review (July 2020) Integration at CHARA (Nov./Dec. 2021) SPICA-VIS Design Review, July 23-24, 2020 Philippe Berio
MANAGEMENT/SYSTEM Team System Team St phane Lagarde Denis Mourard Philippe Berio Julien Dejonghe Science Team Nicolas Nardetto Denis Mourard Prime Investigator Denis Mourard Project Manager Philippe Berio AIT/AIV Fatm Allouche All Optical Study Julien Dejonghe Cyril Pannetier Control Software Fr d ric Morand Daniel Lecron Pipeline Philippe Berio Denis Mourard Mechanical Study Christophe Bailet Julien Dejonghe SPICA-VIS Design Review, July 23-24, 2020 Philippe Berio
MANAGEMENT/SYSTEM Funding Module Cost (k ) Remaining Expenses (k ) Spectrograph/Coating/Retrofeed Source No estimation of the cost should be < 30k PDC 6.9 6.9 ADC 9.8 8.1 PERISCOPE 11 6.9 Margin10k BAS 49.6 9.4 BCO+BCS 9.7 8.5 Travels 10k SFI 10.7 6.2 Spectral Source 1.3 1.3 Total Cost: 276k Remaining Expenses: 196k BS 3.8 1.3 Vgroove 21.9 21.9 Workstation/Det 70.6 45 Available Funding : 144k including 40k from Aarhus University, Danemark Mech. Manufacturing 15 15 Transport 6 5.5 Missing Funding : 52k 2nd part of the INSU request STS VIS 9.7 9.7 TOTAL 226 146 SPICA-VIS Design Review, July 23-24, 2020 Philippe Berio