Design-Build Project Approval Application for WSSDA Olympia HQ Office Building Replacement

Slide Note
Embed
Share

Application for Design-Build Project Approval for the Washington State School Directors Association (WSSDA) Olympia Headquarters Office building replacement project, showcasing the scope, project team, reasons for design-build approach, schedule, and budget details. The proposal includes the replacement of the existing office building with a more energy-efficient and technologically updated structure, following a streamlined design-build process for innovative and efficient project delivery.


Uploaded on Sep 27, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Application for Design-Build Project Approval Washington State School Washington State School Directors Association Directors Association Olympia Headquarters Office Olympia Headquarters Office Building Replacement Building Replacement Thursday, September 28, 2017

  2. Agenda 1. Introductions 2. Scope 3. Qualified Project Team 4. Why Project is Suited for Design-Build 5. Schedule 6. Budget and Funding 7. Questions

  3. Scope WSSDA Olympia HQ Office Building Replacement Existing Site

  4. Conceptual Plan WSSDA Olympia HQ Office Building Replacement

  5. Scope WSSDA Olympia HQ Office Building Replacement Replacement of current 10,000 SF structure Planned construction 7,500 SF on existing 2.14 acres Connect to sewer Energy efficient, technically up-to-date, durable

  6. Project Team

  7. Why Project is Suited for DB Meets Two RCW 39.10.300 Criteria Opportunity for greater innovation and efficiencies Significant savings in project delivery time can be realized Early Design and delivery of side sewer Offsite fabrication Fast tracking design and construction

  8. Schedule DB Process Project Review Committee Submit Application Project Review Committee Presentation Advertise for Design-Build RFQ Statement of Qualifications Due Short-list and send RFP Interview and Fee Proposals Select Design-Builder and Award Schematic Design Design Development Construction Documents Permitting Construction Substantial Completion Final Completion/Closeout September November 2017 September 1, 2017 September 28, 2017 September 29-October 12, 2017 October 30, 2017 November 3, 2017 November 13-21, 2017 November 22, 2017 November 2017 January 2018 January March 2018 March April 2018 March May 2018 June 2018 April 2019 April 2019 July 2019

  9. Budget WSSDA Olympia HQ Office Building Replacement Estimated project design and construction (including construction contingencies) $1,700,000 Costs for Professional Services (PM/CM Services, Legal) $100,000 Equipment and furnishing costs $113,000 Project Contingencies (8%) $134,000 Other related project Costs (Utilities, Testing/Reports, Permits, Consumables, Moving, etc.) $379,000 Sales Tax $200,000 Total Budget $2,626,000

  10. Questions?

Related


More Related Content