Overview of Measure T Project and Program in 2022

Slide Note
Embed
Share

This content provides an overview of the Measure T Project and Program in 2022, showcasing details such as revenues, maintenance of effort, project specifics including street segments, sidewalk lengths, and curb ramps installed or replaced. Images are included for various project locations like Blanco Street, Brophy Street, Corsicana Drive, Folland Drive, and more. Additionally, the post highlights the projected Measure T Program for 2023, detailing project descriptions, costs, lengths, and locations.


Uploaded on Sep 22, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Measure T Project Overview Measure T Project Overview NVTA-TA ITOC December 7, 2022

  2. Measure T Program Measure T Program Measure T Revenues: $1,300,000 Maintenance of Effort: $370,015

  3. 2022 Measure T Program 2022 Measure T Program Measure T Project No. Project Name Segment Length (Feet) 1140 1056 528 1056 Sidewalk Length (Feet) Number of Curb ramps installed or replaced 4 23501 23502 23503 23504 Folland Drive - Elliott to Danrose Blanco Street - Marla to Capra Corsicana Drive Brophy Street 5 4 23505 Eucalyptus Sidewalk Gap 410 410 2 23506 23507 Kemp Lane Kemp Way 264 264 2 2 23508 Sheffield Way 528 4 23509 Folland Drive - Danrose to Corbin 580 2 Totals: 5,826 410 25 3

  4. Blanco Street Blanco Street

  5. Brophy Street Brophy Street

  6. Corsicana Drive Corsicana Drive

  7. Folland Folland Drive Drive

  8. Kemp Lane Kemp Lane

  9. Kemp Way Kemp Way

  10. Sheffield Drive Sheffield Drive

  11. Eucalyptus Sidewalk Gap Closure

  12. 2023 Measure T Program 2023 Measure T Program Project Description Year Total Cost Length Location Start End Mill+Overlay 2022/2023 $ 136,012.80 560 BENTON WY HUMMINGBIRD HUNTINGTON WY Mill+Overlay 2022/2023 $ 294,952.46 1214 BENTON WY HUNTINGTON WY ELLIOTT DR Mill+Overlay 2022/2023 $ 80,514.72 468 BENTON WY HUMMINGBIRD WETLANDS EDGE RD Mill+Overlay 2022/2023 $ 167,587.20 720 DONALDSON WY EUCALYPTUS DR 1060 DONALDSON WAY Mill+Overlay 2022/2023 $ 104,625.62 667 ELKE DR DONALDSON WY GISELA DR Mill+Overlay 2022/2023 $ 160,169.24 833 ELLIOTT DR KIMBERLY DR FOLLAND RD Mill+Overlay 2022/2023 $ 98,629.52 629 GISELA DR DONALDSON WY RIO DEL MAR Mill+Overlay 2023/2024 $ 528,264.00 2900 CARTAGENA WAY BROADWAY EAST END 12

  13. Public Works Public Works Thank you! Thank you! Contact us at (707) 647-4366 Erica Ahmann Smithies, Public Works Director/City Engineer esmithies@cityofamericancanyon.org