Network Timing Solutions and Recommendations Update
"Explore the latest updates on network timing solutions, including problem identification, required characteristics, and finalizing options for a backup solution to GPS. Learn about upcoming recommendations for network timing alternatives to be considered in late 2016."
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
Working Group 4B: Network Timing Single Source Risk Reduction Status Update March 2016 Jennifer A. Manner, Chair
WP 4B Completed PROBLEM IDENTIFICATION: Reasons for failure temporary or long term: Solar flares or other disturbances Space Weather phenomena RF interference episodes Failure of upstream time sources whether deliberate or accidental Accidental or deliberate jamming Spoofing REQUIRED CHARACTERISTICS: Redundancy Independence from RNSS Increased Reliability Appropriate level of accuracy for the application 2
WG4B Finalizing We are finalizing for June the options that are available for a network timing back up solution to GPS, including the pros and cons of such options. These include, but are not limited to: eLoran Alternative RNSS systems Use of MSS systems Commercial RF distribution Sync over fiber And many others We are identifying both current, planned and future technologies that can serve as a viable solutions 3
WG4B Next Step: Recommendations We are working on determining recommendations to network timing alternatives for consideration in late 2016. 4