Neighborhood Revitalization and Public Safety Report

undefined
 
East Washington/River Park
Revitalization Plan Meeting
 
 
Angela Blatch, Senior Planner
Office of the City Manager – Neighborhood Planning
October 22, 2019
 
E. Washington Public Safety Incidents
October 16, 2018 – October 16, 2019
 
River Park Public Safety Incidents
October 16, 2018 – October 16, 2019
 
E. Washington Water & Sewer Issues
(2011 – present)
 
2” – 4” Water Main
Replacement
 
Work In Progress:
Blount Street
 
Remainder proposed
to be replaced within
the next two (2) fiscal
years.
 
River Park Water & Sewer Issues
(2011 – present)
 
2” – 4” Water Main
Replacement
 
Work In Progress:
Blount Street
 
Remainder proposed
to be replaced within
the next two (2) fiscal
years.
 
Neighborhood Roads
(conditions as of 2011)
 
Before and after TSPLOST
 
8/20/2024
 
Before and after tsplost
 
In the spring 2019, the Public Works
Department procured a camera based
pavement rating system.  On a scale
from 0-100, the current pavement
rating was 49, compared to a 61 rating
measured in the 2012 Pavement Study.
A full Pavement Condition Index study is
planned for spring 2020.
 
* The 2019 rating did not include
current resurfacing project.
 
Neighborhood Sidewalks
(conditions as of 2013)
 
Addressing Sidewalk Issues
 
The Public Works Transportation Division will submit for
solicitation in the Spring of 2020 or the Capital FY21
budget a plan to perform a comprehensive sidewalk
evaluation. The proposed sidewalk evaluation will provide a
rating of the sidewalk conditions within the R/W of the City
of East Point, and the project will provide a resource to
plan for sidewalk installation, replacement and repairs.
Through the sidewalk evaluation provided to the Public
Works Department, the Department will be able to create a
sidewalk GIS map, plan projects, budgets and meet ADA
compliance for the City.
 
East Washington Housing Inventory
 
River Park Housing Inventory
 
Questions & Answers / Next Steps
Slide Note
Embed
Share

This report provides updates on the East Washington/River Park Revitalization Plan, public safety incidents in the respective areas, water and sewer infrastructure issues, neighborhood road conditions, TSPLOST resurfacing projects, and sidewalk evaluations. Key points include the involvement of city officials like Angela Blatch, plans for water main replacements, and proposed projects for improving public infrastructure.

  • Neighborhood Revitalization
  • Public Safety
  • Infrastructure
  • City Planning
  • Sidewalk Evaluation

Uploaded on Aug 20, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. East Washington/River Park Revitalization Plan Meeting Angela Blatch, Senior Planner Office of the City Manager Neighborhood Planning October 22, 2019

  2. E. Washington Public Safety Incidents October 16, 2018 October 16, 2019 53 11% 130 26% Violent Property Quality of Life 911 or Other 297 59% 22 4%

  3. River Park Public Safety Incidents October 16, 2018 October 16, 2019 35 Violent 95 Property Quality of Life 239 911 or Other 29

  4. E. Washington Water & Sewer Issues (2011 present) 2 4 Water Main Replacement Work In Progress: Blount Street Remainder proposed to be replaced within the next two (2) fiscal years.

  5. River Park Water & Sewer Issues (2011 present) 2 4 Water Main Replacement Work In Progress: Blount Street Remainder proposed to be replaced within the next two (2) fiscal years.

  6. Neighborhood Roads (conditions as of 2011)

  7. Before and after TSPLOST Resurfaced (miles) Sidewalks (miles) Projects Before TSPLOST (2014-2017) 2017-2018 Projects FY20 Proposed Projects In the spring 2019, the Public Works Department procured a camera based pavement rating system. On a scale from 0-100, the current pavement rating was 49, compared to a 61 rating measured in the 2012 Pavement Study. A full Pavement Condition Index study is planned for spring 2020. 7.9 1.2 6.6 3.3 18.6 10.4 * The 2019 rating did not include current resurfacing project. 8/20/2024 Before and after tsplost

  8. Neighborhood Sidewalks (conditions as of 2013)

  9. Addressing Sidewalk Issues The Public Works Transportation Division will submit for solicitation in the Spring of 2020 or the Capital FY21 budget a plan to perform a comprehensive sidewalk evaluation. The proposed sidewalk evaluation will provide a rating of the sidewalk conditions within the R/W of the City of East Point, and the project will provide a resource to plan for sidewalk installation, replacement and repairs. Through the sidewalk evaluation provided to the Public Works Department, the Department will be able to create a sidewalk GIS map, plan projects, budgets and meet ADA compliance for the City.

  10. East Washington Housing Inventory

  11. River Park Housing Inventory

  12. Questions & Answers / Next Steps

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#