Lean Manufacturing Project Requirements and Scope

Slide Note
Embed
Share

This project involves designing a lean manufacturing implementation in your company/department to evaluate possible improvements and prepare for lean tool implementation. The objective is to understand and implement lean tools effectively for workplace enhancements. The project includes research, critical analysis of the current state, problem statement, future state design, evaluation of improvements, conclusions, and proper referencing using APA style.


Uploaded on Nov 25, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Lean Manufacturing PROJECT 1 Requirements Ilie Mihai T UCEAN

  2. Project requirements Scope Design a lean manufacturing implementation at your company/department/workplace and evaluate the possible improvements. Objective Prepare for implementation a lean tool(s) at your company to make improvement(s). Learning objective To know and understand lean tools and how to implement/use them for workplace improvements.

  3. Project requirements Deadline Written report: week 12th Report presentation in class: weeks 13th& 14th(with appointment) No. of students Individual report and presentation Grading Written report 50% Report presentation 25% Response to questions 25% Percentage of project from final grade: 50%

  4. Project requirements Content requirements for written report: 1. Introduction (background, company and lean tool selection) 2.* Research about the lean tool selected (concept, theory, history) 3. Critical analysis of current state in company (related to lean tool, use VSM) 4. Problem statement 5. Design the implementation of the lean tool future state (use VSM) 6. Evaluate the possible improvements after lean tool implementation (short and long term) 7. Conclusions 8.** References * Cite the references from chapter 8 in text as: (Name, Year) , e.g. (Taucean, 2019). ** Use APA style for references, list references in alphabetic order of first author name.

  5. Questions?

Related


More Related Content