iNext Insurance Trip Delay Claim Process and Requirements

undefined
TRIP DELAY CLAIM
PROCESS
iNext Insurance
CLAIM FORM
PAGE 1
Participant’s Information must be completed.
The School Name would be Elon University
and the Policy Number would be  your policy
number from your iNext ID card.
List home address.  If you want payment sent
to a different address, list on the second
address line.
Legal Guardian only needs to be completed if
the student is under the age of 18.
Travel Supplier Information needs to be
completed.  If the arrangements were not
made by a Travel Supplier, but by Elon
University directly, Elon would be listed.
The Date Travel Protection plan was
purchased was the date enrolled into iNext.
The Initial Deposit date would be the date
initial deposit was made to the Travel Supplier
or to Elon University for the program.  Elon
University may need to provide this
information to you.
Loss Information is where you will list the
Amounts of the Loss and if you received any
reimbursement.  Items listed will need
supporting documents.
This would be things such as hotel expenses,
food expenses new airline tickets or change
fees.
CLAIM FORM
PAGE 2
Reason for Delay must be completed.  The
date Trip was delayed with the Travel
Supplier would be the date that Elon
University was notified, or if a Travel
Supplier was used, the date that Elon
University notified the supplier and the
date the delay ended needs to be
completed.
Be sure to send all copies of the required
documentation.
Original Flight Itinerary
New Flight Itinerary
Statement from the airline/airport/car rental
agency or Travel Agent as the reason for the
delay
Claim form will need to be signed and sent
to Co-Ordinated Benefit Plans with all of
the documentation.
Be sure to send all copies of the required
documentation.
Original Flight Itinerary
New Flight Itinerary
Statement from the airline/airport/car rental
agency or Travel Agent as the reason for the
delay
ADDITIONAL
INFORMATION
The trip must be delayed by 12 or more hours due
to a defined hazard.
Hazard means: (a) Any delay of a Common Carrier
(including Inclement Weather). (b) Any delay by a traffic
accident en route to a departure, in which You or a
Traveling Companion is not directly involved. (c) Any
delay due to lost or stolen passports, travel documents
or money, Quarantine, hijacking, unannounced Strike,
natural disaster, civil commotion or riot. (d) A closed
roadway causing cessation of travel to the destination
of the Trip (substantiated by the department of
transportation, state police, etc.)
Each student needs to complete a claim form for
their expenses.
If one person paid for the lodging or there was one
receipt for multiple student’s meals, the person that
paid would break down the cost per student and
provide the student with the documentation  and
receipt.
If the delay is due to a quarantine, a copy of the
positive COVID test would be required.
This coverage is reimbursement based so it is
important to save all receipts.
The Trip Delay due to Quarantine benefit is up to
$250 per day for food and lodging for up to ten days,
with a total benefit of $2500.   If the participants
spends $150 per day on their food and lodging for
ten days, that will leave them with up to $1000
towards flight change fees or towards a new flight.
The total payable benefit is no more than $2500, but
there is a limit on how much can be spent daily on
food and lodging—up to $250 .
All claims and documentation need to be emailed to
Co-Ordinated Benefit plans at
TravelTeam@cbpinsure.com
 for processing.
Slide Note
Embed
Share

This guide provides detailed instructions on how to file a trip delay claim with iNext Insurance, including completing the claim form, submitting necessary documentation, and understanding the reimbursement process. It covers the information needed for both pages of the claim form, types of delays covered, and the maximum benefits available. Ensure to follow the steps outlined to successfully claim reimbursement for expenses incurred during a trip delay.

  • Travel insurance
  • Claim process
  • Trip delay
  • iNext Insurance
  • Reimbursement

Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. TRIP DELAY CLAIM PROCESS iNext Insurance

  2. CLAIM FORM PAGE 1 Participant s Information must be completed. The School Name would be Elon University and the Policy Number would be your policy number from your iNext ID card. List home address. If you want payment sent to a different address, list on the second address line. Legal Guardian only needs to be completed if the student is under the age of 18. Travel Supplier Information needs to be completed. If the arrangements were not made by a Travel Supplier, but by Elon University directly, Elon would be listed. The Date Travel Protection plan was purchased was the date enrolled into iNext. The Initial Deposit date would be the date initial deposit was made to the Travel Supplier or to Elon University for the program. Elon University may need to provide this information to you. Loss Information is where you will list the Amounts of the Loss and if you received any reimbursement. Items listed will need supporting documents. This would be things such as hotel expenses, food expenses new airline tickets or change fees.

  3. CLAIM FORM PAGE 2 Reason for Delay must be completed. The date Trip was delayed with the Travel Supplier would be the date that Elon University was notified, or if a Travel Supplier was used, the date that Elon University notified the supplier and the date the delay ended needs to be completed. Be sure to send all copies of the required documentation. Original Flight Itinerary New Flight Itinerary Statement from the airline/airport/car rental agency or Travel Agent as the reason for the delay Claim form will need to be signed and sent to Co-Ordinated Benefit Plans with all of the documentation. Be sure to send all copies of the required documentation. Original Flight Itinerary New Flight Itinerary Statement from the airline/airport/car rental agency or Travel Agent as the reason for the delay

  4. ADDITIONAL INFORMATION The trip must be delayed by 12 or more hours due to a defined hazard. Hazard means: (a) Any delay of a Common Carrier (including Inclement Weather). (b) Any delay by a traffic accident en route to a departure, in which You or a Traveling Companion is not directly involved. (c) Any delay due to lost or stolen passports, travel documents or money, Quarantine, hijacking, unannounced Strike, natural disaster, civil commotion or riot. (d) A closed roadway causing cessation of travel to the destination of the Trip (substantiated by the department of transportation, state police, etc.) Each student needs to complete a claim form for their expenses. If one person paid for the lodging or there was one receipt for multiple student s meals, the person that paid would break down the cost per student and provide the student with the documentation and receipt. If the delay is due to a quarantine, a copy of the positive COVID test would be required. This coverage is reimbursement based so it is important to save all receipts. The Trip Delay due to Quarantine benefit is up to $250 per day for food and lodging for up to ten days, with a total benefit of $2500. If the participants spends $150 per day on their food and lodging for ten days, that will leave them with up to $1000 towards flight change fees or towards a new flight. The total payable benefit is no more than $2500, but there is a limit on how much can be spent daily on food and lodging up to $250 . All claims and documentation need to be emailed to Co-Ordinated Benefit plans at TravelTeam@cbpinsure.comfor processing.

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#