Highlights from ATNF Operations Meeting - November 25, 2014

undefined
ATNF Operations
Douglas Bock
ATUC – 25 NOVEMBER 2014
 
 
 
 
From the June ATUC meeting …
Budget implications – this presentation and Director’s report
Training and observer qualification – this presentation
CABB modes – Tasso’s talk
Off-axis polarisation calibration – Phil’s talk
ATNF Operations  |  ATUC - 25 November 2014
2  |
undefined
ATNF Telescope Availability
ATNF Operations  |  ATUC - 25 November 2014
3  |
 
 
 
 
Parkes and ATCA
Removal of most visitor services at Narrabri and Parkes
Maintaining levels of scientific user support, but now in Marsfield
Parkes power & automation upgrades now complete
Focus on ATCA automation (Jamie’s talk)
Decrease in engineering operations effort for Parkes/ATCA by ~4 FTE
from this year
Capabilities:
Parkes receivers MB-20 + 10/50 cm for Oct 2014 and Apr 2015
Parkes receivers ? + {20cm} + 10/50 cm for Oct 2015
Will consider other receivers for exceptional cases or where
operationally convenient
No current changes to ATCA capabilities but studying options for next FY
ATNF Operations  |  ATUC - 25 November 2014
4  |
 
 
 
 
LBA and Tidbinbilla
No changes to LBA operations, but Parkes receiver availability will
limit choices (typ. 20 cm + 1-2 higher frequencies, 1 per semes.)
LBA developments focussed on sustainable operations
5% host country access to Tidbinbilla telescopes (limited support)
Seeking a more effective use of host country time on Tidbinbilla
70m, for VLBI in particular
ATNF Operations  |  ATUC - 25 November 2014
5  |
 
 
 
 
Mopra
Current agreement with NAOJ and UNSW/Adelaide expires
October 2014
CSIRO funding for depreciation and management will terminate
October 2014
April 2015 the last semester for ATNF access
CSIRO will shortly begin an expressions of interest process to find
new operators &/or owners for Mopra.
Information on telescope status for 2015APR is available at
http://www.atnf.csiro.au/observers/apply/avail.html
ATNF Operations  |  ATUC - 25 November 2014
6  |
undefined
User Support and Qualification
ATNF Operations  |  ATUC - 25 November 2014
7  |
 
 
 
 
Observer “qualification”
Why? To maximise scientific impact from the facilities:
1.
By optimising design and conduct of observations
2.
By facilitating interactions between CSIRO staff and observers
that guide support and future instrumentation, etc
ATNF Operations  |  ATUC - 25 November 2014
8  |
 
 
 
 
Observer/user qualification (PKS and ATCA)
 
Current scheme
Requires annual visits but observer skills still vary widely
Not a large number of failed or sub-optimal observing strategies
Efficiency may be lower for remote observers (
ATUC
: users’ input…)
Main limit on productivity is may be data reduction/analysis;
follow-through support
(speculative – what does ATUC know about this?)
 
Are we placing our support effort in the right place?
ATNF Operations  |  ATUC - 25 November 2014
9  |
 
 
 
 
Observer/
user
 qualification (PKS and ATCA)
 
Proposed
Increased emphasis on friend support through co-location
Training tools – checklists/videos, etc
Active measurement of support quality and commitment to
improve
1-yr return requirement for most observers, but review need in 6-
12 months
2-yr return requirement for experienced regular observers
 
Satisfy goal of interactions between CASS and users by improving
in-person support and visitor schemes (ATUC: how?)
ATNF Operations  |  ATUC - 25 November 2014
10  |
 
 
 
 
Alternative support models (ATCA)
1.
Existing DA + Friend (better given friends now co-located with
Obs.)
2.
~ Parkes project expert scheme [but ATCA projects smaller and
typically fewer “experts”]
3.
Project-by-project (Friend only) support
4.
Increased automation -> lower observer skill requirements
ATNF Operations  |  ATUC - 25 November 2014
11  |
 
 
 
 
Training & support – Marsfield SOC
ATNF Operations  |  ATUC - 25 November 2014
12  |
 
 
 
 
Training & support – Remote
ATNF Operations  |  ATUC - 25 November 2014
13  |
 
 
 
 
Training & support – Definitions & Notes
ATNF Operations  |  ATUC - 25 November 2014
14  |
 
 
 
 
Issues & questions for ATUC
Feedback on the proposed support model –
what is the users’ perspective?
It this model likely to see users come voluntarily to Marsfield?
How can we make it attractive for users to stay longer?
How much training would users like to receive?
Do users find remote observing less efficient/effective?
Strategy for Parkes & ATCA – the next meeting
-
Legacy projects
-
Model in the SKA1 era
ATNF Operations  |  ATUC - 25 November 2014
15  |
undefined
CSIRO Astronomy and Space Science
Douglas Bock
Research Director – ATNF Operations
t
 
+61 2 9372 4276
e
 
douglas.bock@csiro.au
w
 
www.atnf.csiro.au
CSIRO ASTRONOMY AND SPACE SCIENCE
Key user contacts:
Jamie Stevens, Lead Scientist ATCA
Ettore Carretti, Lead Scientist Parkes
Chris Phillips, Lead Scientist LBA
Balt Indermuehle, Mopra support
Yanett Contreras, ATNF Friend for Tidbinbilla
Slide Note
Embed
Share

Insights from the ATNF Operations meeting held on November 25, 2014, covering topics such as budget implications, telescope availability, Parkes and ATCA updates, LBA and Tidbinbilla operations, Mopra telescope status, user support, and qualification. The meeting discussed changes in visitor services, equipment upgrades, receiver capabilities, and future operational plans. Explore more about the operations and developments at ATNF during this informative session.

  • ATNF Operations
  • Meeting Highlights
  • Telescope Availability
  • User Support
  • Operational Updates

Uploaded on Oct 08, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. ATNF Operations Douglas Bock ATUC 25 NOVEMBER 2014

  2. From the June ATUC meeting Budget implications this presentation and Director s report Training and observer qualification this presentation CABB modes Tasso s talk Off-axis polarisation calibration Phil s talk ATNF Operations | ATUC - 25 November 2014 2 |

  3. ATNF Telescope Availability ATNF Operations | ATUC - 25 November 2014 3 |

  4. Parkes and ATCA Removal of most visitor services at Narrabri and Parkes Maintaining levels of scientific user support, but now in Marsfield Parkes power & automation upgrades now complete Focus on ATCA automation (Jamie s talk) Decrease in engineering operations effort for Parkes/ATCA by ~4 FTE from this year Capabilities: Parkes receivers MB-20 + 10/50 cm for Oct 2014 and Apr 2015 Parkes receivers ? + {20cm} + 10/50 cm for Oct 2015 Will consider other receivers for exceptional cases or where operationally convenient No current changes to ATCA capabilities but studying options for next FY ATNF Operations | ATUC - 25 November 2014 4 |

  5. LBA and Tidbinbilla No changes to LBA operations, but Parkes receiver availability will limit choices (typ. 20 cm + 1-2 higher frequencies, 1 per semes.) LBA developments focussed on sustainable operations 5% host country access to Tidbinbilla telescopes (limited support) Seeking a more effective use of host country time on Tidbinbilla 70m, for VLBI in particular ATNF Operations | ATUC - 25 November 2014 5 |

  6. Mopra Current agreement with NAOJ and UNSW/Adelaide expires October 2014 CSIRO funding for depreciation and management will terminate October 2014 April 2015 the last semester for ATNF access CSIRO will shortly begin an expressions of interest process to find new operators &/or owners for Mopra. Information on telescope status for 2015APR is available at http://www.atnf.csiro.au/observers/apply/avail.html ATNF Operations | ATUC - 25 November 2014 6 |

  7. User Support and Qualification ATNF Operations | ATUC - 25 November 2014 7 |

  8. Observer qualification Why? To maximise scientific impact from the facilities: 1. By optimising design and conduct of observations 2. By facilitating interactions between CSIRO staff and observers that guide support and future instrumentation, etc We still hold this principal, but are seeking other ways to satisfy it ATNF Operations | ATUC - 25 November 2014 8 |

  9. Observer/user qualification (PKS and ATCA) Current scheme Requires annual visits but observer skills still vary widely Not a large number of failed or sub-optimal observing strategies Efficiency may be lower for remote observers (ATUC: users input ) Main limit on productivity is may be data reduction/analysis; follow-through support (speculative what does ATUC know about this?) Are we placing our support effort in the right place? ATNF Operations | ATUC - 25 November 2014 9 |

  10. Observer/user qualification (PKS and ATCA) Proposed Increased emphasis on friend support through co-location Training tools checklists/videos, etc Active measurement of support quality and commitment to improve 1-yr return requirement for most observers, but review need in 6- 12 months 2-yr return requirement for experienced regular observers Satisfy goal of interactions between CASS and users by improving in-person support and visitor schemes (ATUC: how?) ATNF Operations | ATUC - 25 November 2014 10 |

  11. Alternative support models (ATCA) 1. Existing DA + Friend (better given friends now co-located with Obs.) 2. ~ Parkes project expert scheme [but ATCA projects smaller and typically fewer experts ] 3. Project-by-project (Friend only) support 4. Increased automation -> lower observer skill requirements ATNF Operations | ATUC - 25 November 2014 11 |

  12. Training & support Marsfield SOC Parkes ATCA Observing project design support Friend Friend Telescope orientation SO staff (JS) Duty Astronomer Observing training Friend -> Project Expert Duty Astronomer Observer competence evaluation Friend SO staff (RW/BI) Observing BH support Project Expert & SO staff Duty Astronomer Observing AH support Project Expert Duty Astronomer Data reduction/analysis support Friend Friend ATNF Operations | ATUC - 25 November 2014 12 |

  13. Training & support Remote Parkes ATCA Observing project design support None None Telescope orientation N/A N/A Observing training None None Observer competence evaluation Friend SO staff (RW/BI) Observing BH support Project Expert Duty Astronomer Observing AH support Project Expert Duty Astronomer Data reduction/analysis support None None ATNF Operations | ATUC - 25 November 2014 13 |

  14. Training & support Definitions & Notes Observing project design Schedule file preparation especially calibration strategy Telescope orientation Which window does what (VNCs, TCS, caobs, CABB, and many more) Observing training - Parkes What backend; how to start; setting up an observation with TCS; real-time displays; data inspection Observer training - ATCA Project-specific calibration (esp. mm); monitoring spectra; data inspection Observer competence evaluation Evaluation by both observers and DA/SO staff on observer skills in observation set-up, error and fault responses, data quality assessment Friend CASS Astronomer Typical training One-to-one: 1-2 hrs (first time); 30 mins (each observing run) ATNF Operations | ATUC - 25 November 2014 14 |

  15. Issues & questions for ATUC Feedback on the proposed support model what is the users perspective? It this model likely to see users come voluntarily to Marsfield? How can we make it attractive for users to stay longer? How much training would users like to receive? Do users find remote observing less efficient/effective? Strategy for Parkes & ATCA the next meeting - Legacy projects - Model in the SKA1 era ATNF Operations | ATUC - 25 November 2014 15 |

  16. Key user contacts: Jamie Stevens, Lead Scientist ATCA Ettore Carretti, Lead Scientist Parkes Chris Phillips, Lead Scientist LBA Balt Indermuehle, Mopra support Yanett Contreras, ATNF Friend for Tidbinbilla CSIRO Astronomy and Space Science Douglas Bock Research Director ATNF Operations t +61 2 9372 4276 e douglas.bock@csiro.au w www.atnf.csiro.au CSIRO ASTRONOMY AND SPACE SCIENCE

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#