ERCOT Operations Working Group Updates and Concerns

operations working group n.w
1 / 6
Embed
Share

Stay informed about the latest updates and concerns discussed in the ERCOT Operations Working Group meetings. Topics include resource outage reporting, transmission operator relay set points, and ensuring continuous validity of physical responsive capability. ERCOT is actively addressing concerns raised by stakeholders to ensure reliable energy operations.

  • ERCOT
  • Operations
  • Working Group
  • Updates
  • Concerns

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Operations Working Group Chair- Rickey Floyd Vice-Chair- Shawn McCreary HITE List Sub-Chair Pushkar Chhajed 11/04/2021

  2. NOGRR215 Limited Use of RAS Tabled pending new comments from ERCOT

  3. NOGRR226 - Revision to 5% Transmission Operator (TO) Load Shedding Relay Set Point ERCOT continues to assess framework for studies needed before changes to Stage 1 UFLS can be considered Tabled

  4. Emergency Condition list #5 NPRR1084 Improvements to Reporting of Resource Outages and Derates. Concerns raised on having enough personnel to provide the updates in the timeline required in the comments filed New comments have been filed by ERCOT and will be reviewed at next OWG

  5. Emergency Condition list #6 NPRR1085 Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs) Concerns raised on personnel being able to provide accurate information to ERCOT as required in the comments Concerns were discussed about keeping COP updated and compliance risk if information was wrong Recommendations were reiterated on adding an ON-HOLD option when a units is experiencing issues for a long term solution and possibly locking the HSL or using ONTEST as a interim solution New comments have been filed by ERCOT and will be reviewed at next OWG

  6. Emergency Condition list #128 Using Instant Messaging during EEA Events An update to the draft SCR was presented and discussed ERCOT requested a time to review the SCR and get additional details on the applications capabilities. ERCOT may also want to look at others vendors outside of the app use by SPP. ERCOT will provide updates and the next OWG.